Differences between revisions 40 and 85 (spanning 45 versions)
Revision 40 as of 2021-02-12 21:48:05
Size: 4624
Comment:
Revision 85 as of 2021-02-15 15:31:37
Size: 7812
Comment:
Deletions are marked like this. Additions are marked like this.
Line 49: Line 49:
21h - 03h; Golshan, Fatemeh, Carsten: 160-16: NGC3198, tau~0.2, Fluctuations before sky subtraction less than +/-4 Jy (rms <~ 1.6 Jy) during science scans. 21h - 03h; Golshan, Carsten: 160-16: NGC3198 (2h) then NGC5194 (2h), tau~0.2-0.28, stable with <+/-6Jy, rms~2Jy. Pointing, Focus stable. 1 skydip. Tau prediction page failed (saying 502 Bad Gateway)
Line 53: Line 53:
03h - 09h; Ankur, Kaustuv: 03h - 09h; Ankur, Kaustuv: We started with tau ~ 0.18 and it remained stable throughout the shift. Atmospheric conditions were very good. We did 2 repetitions on 180-20 project and then did 7 repetitions on PSZ2G104 (199-16). It was a smooth shift.
Line 55: Line 55:
09h - 15h; 09h - 15h; Antonio, Marco: The opacity has been always around 0.10-0.15. We did 5 repetitions on PSZ2-G087 (12/12 completed! - proj (199-16)), 2 repetitions on PSZ2-G045 (2/6 - proj (199-16)), 1 skydip and 2 repetitions on G82 (proj (094-20)).
Line 57: Line 57:
15h - 21h; 15h - 21h; Angel: Starting with tau~0.2. Project 094-20: 2 rep. on G82, 2 rep. on G155, and 1 rep. on G150 (finished). Note of CK: 094-20 scan 155 shows stability +/-10Jy, rms=4.4Jy @2mm. Calibrations: beam-map (h) and a calib_1scan on Uranus (mean tau~0.27). Project 138-20: 1 rep. on NGC2701 (tau~0.2 and very stable at the beginning).
Line 59: Line 59:
21h - 00h; 21h - 03h; Carsten: 160-16 NGC3198 tau~0.2, Atmosphere not stable, slowly improving from rms before/after sky subtraction: 8-19Jy/b(!!) / 40mJy/b to 3Jy/b / 33mJy/b. Tau also slowly improving to 0.14. At midnight local time changing to 180-20 with stable atmosphere (rms=1Jy/b).
Line 63: Line 63:
03h - 09h; 03h - 09h; Ankur, Kaustuv: We started with tau ~0.17 and it remained stable throughout the shift. Atmospheric conditions were also stable. We did 2 repetitions on 180-20 project and then did 9 repetitions on PSZ2G104 (project 199-16; Total target Nreps required for PSZ2G104 - 16/16 completed).
Line 65: Line 65:
09h - 15h; 11h UT '''NOTE BY STEFANO: the make-imbfits for Arrays 1 and 3 seems to have stopped around 00:30 of Feb 13th'''. The situation of pool 49 is repeating. Please, start it again! I also urge the users to check this regularly and use the PIIC monitor for pointing (Ar2) and focus (Ar1).
Line 67: Line 67:
15h - 21h; 09h - 15h; Aishwarya & Laurence: tau225 around 0.15 and stable atmosphere (no hint of anomalous refraction from the pointing). We observed 199-16 (PSZ2G108, PSZ2G045 and ACTJ2302) and did one high-quality calib_1scan on MWC349. The beam started to enlarge a bit at the end of our shift.
Line 69: Line 69:
21h - 00h; 15h - 21h; Matthieu: The weather conditions were excellent with tau in the 0.15-0.18 range. We started with a beammap and a skydip. We then did 3 repeats of G157 and then 2 repeats of G93 (094-20). We then switched to 118-20 (SH2), when it was bright enough and completed this program. Everything went smoothly. Note of CK: Scan 203 of 094-20 shows excellent stability: 0.9Jy/b rms at 2mm.

21h - 03h; Carsten: finishing last scan on 118-20. Tau~0.17-0.21: Concerning 1mm arrays: IMBfits is working on scan 154 of yesterday, still far from scan 231 of what is needed now. Angel restarts the acquisition. Fraction of healthy KIDs increased. calib_1scan & beam map on 3C84. 160-16: NGC2976 (2h), M51 (2h, tau=0.22-0.24). Exceptionally stable conditions: 1Jy/b rms @ 2mm.
Line 73: Line 75:
03h - 09h; 03h - 09h; Guilaine: Tau between 0.23 and 0.28, but most of the time around 0.23-0.24. Atmosphere quite stable! Observations 4.21 hours on GOODSN (N2CLS). Then switch to PSZ2G108 (LPSZ) after a pointing/focus session from 8:15 to 8:30 (fwhms are very good, atm very stable).
Line 75: Line 77:
09h - 15h; 09h - 15h; Emmanuel & Frédéric : tau225 around 0.2 and stable atmosphere . We observed 199-16 (PSZ2G108 and ACTJ2302) and did one calib_1scan on NGC7027. The beam started to enlarge a lot at the end of our shift and hence we have not done any beammap.

Daily Reports

Because of the pandemic, no observers can come to the telescope. This pool is entirely in remote mode.

A couple of preparatory notes by Stefano:

  • please use the PIIC monitors. If you notice that one (or more) of the PIIC monitors stop processing the data, please notify the AoD: it is possible that the scripts that produce the IMBFITS files have stopped.
  • please take numerous calibrators scans, also in bad sky conditions (as long as NIKA2 is used): for example take one calib scan whenever the pointing/focus source is a calibrator. This will help the analysis of the calibration. Thank you in advance.

Little extra by Stefano: I would have liked to be at the telescope to celebrate the 50th pool of NIKA2 with a special mid-night pasta, but unfortunately it is still not possible. Therefore I have prepared a little surprise. I hope it can make you smile in these eerie times. Stay Safe!

attachment:happy50thNIKA2_merged_cropped_compressed.jpg

Feb 9th, Tuesday

16h - 21h; Angel, Bilal: Stopped. Bad weather. Not a single scan.

21h - 03h; Carsten: Stopped.

Feb 10th, Wednesday

03h - 09h; Stopped.

09h - 15h; Still stopped.

15h - 21h; Stopped.

21h - 03h; Stopped.

Feb 11th, Thursday

03h - 09h; Sergio (Op.), Angel: Checking the telescope at 05h (LT). Opacity ~0.8. NIKA2 Pool targets according to these conditions are too low. Switching to EMIR backup project 171-20. Pointing/focus OK. Wobbler required, but it doesn't work after several tries. Switching to NIKA2 at ~7 am. Resonances reloaded. Opacity ~0.65. Pointing/focus on K3-20A. Despite the opacity level, conditions look quite stable. Trying to restart the data-filler of TAPAS; it doesn't work (waiting for Computer Group instructions). NGC7027: calib_1scan (s32). Then, a skydip. Monitoring stability; large spikes of opacity.

09h - 15h; Antonio, Emmanuel, Bilal: stopped ~1h for technical tests of wobbler system. Observed with NIKA2 for project 126-20.

15h - 21h; Angel: Observed 12 fields of 126-20, and started with EMIR backup program 109-20 at 20h (LT); tau~0.7, unstable. Data records still being recovered in TAPAS.

21h - 03h; Annie, Carsten take over to continue with EMIR projects, first 109-20. Tau~0.7. Some clouds. At UT00:00 change to EMIR 097-20 154.05+5.07. Tau drops to 0.5. TAPAS working.

Feb 12th, Friday

03h - 09h; Miguel, Angel: Starting with opacity ~0.8; large instabilities. Continuing with EMIR backup programs: 171-20. Four bright targets observed. The opacity at the end of the shift dropped quickly to ~0.3. Switching to NIKA2 at 08:45. Resonances reloaded after that. TAPAS takes more time than usual to update the records: reported to IRAM's Granada User Support.

09h - 15h; Laurence, Miren: Starting with opacity at ~0.3, increasing. Focus on NGC7027. Difficult to get a good pointing, clear indication of atmospheric instabilities. Whenever we obtained "reasonable" pointing, we did calib_1scan scans on the three secondary calibrators (MWC349, NGC7027 and CRL2688). The quality of these observation is uncertain. To be repeated. At ~ 11h (LT) start with 126-20 project, one repetition toward 4 different GP fields. Opacity drops and after focus and pointing, we change to 199-16 and performed 2 repetitions on PSZ2G104 (dubious atmospheric stability). We probed atmospheric condition toward the opposite azimuth: better focus and pointing. We moved back to 199-16 but choose another target close to this azimuth: 3 repetitions on ACTJ2302. The atmosphere was stable at the end of our shift.

15h - 21h; Isabelle, Karine: At the begining of the shift, tau was very good (~0.15) and the atmosphere stable. We started with a focus, pointing, beammap, and a calib_1scan on Uranus. We then observed project 094-20 (5 Nrep on L1506). We then did a skydip and continued on project 094-20 observing G150 (5 NRep). Tau was ~ 0.2 by the end of the shift and the atmosphere stable all over the shift.

21h - 03h; Golshan, Carsten: 160-16: NGC3198 (2h) then NGC5194 (2h), tau~0.2-0.28, stable with <+/-6Jy, rms~2Jy. Pointing, Focus stable. 1 skydip. Tau prediction page failed (saying 502 Bad Gateway)

Feb 13th, Saturday

03h - 09h; Ankur, Kaustuv: We started with tau ~ 0.18 and it remained stable throughout the shift. Atmospheric conditions were very good. We did 2 repetitions on 180-20 project and then did 7 repetitions on PSZ2G104 (199-16). It was a smooth shift.

09h - 15h; Antonio, Marco: The opacity has been always around 0.10-0.15. We did 5 repetitions on PSZ2-G087 (12/12 completed! - proj (199-16)), 2 repetitions on PSZ2-G045 (2/6 - proj (199-16)), 1 skydip and 2 repetitions on G82 (proj (094-20)).

15h - 21h; Angel: Starting with tau~0.2. Project 094-20: 2 rep. on G82, 2 rep. on G155, and 1 rep. on G150 (finished). Note of CK: 094-20 scan 155 shows stability +/-10Jy, rms=4.4Jy @2mm. Calibrations: beam-map (h) and a calib_1scan on Uranus (mean tau~0.27). Project 138-20: 1 rep. on NGC2701 (tau~0.2 and very stable at the beginning).

21h - 03h; Carsten: 160-16 NGC3198 tau~0.2, Atmosphere not stable, slowly improving from rms before/after sky subtraction: 8-19Jy/b(!!) / 40mJy/b to 3Jy/b / 33mJy/b. Tau also slowly improving to 0.14. At midnight local time changing to 180-20 with stable atmosphere (rms=1Jy/b).

Feb 14th, Sunday

03h - 09h; Ankur, Kaustuv: We started with tau ~0.17 and it remained stable throughout the shift. Atmospheric conditions were also stable. We did 2 repetitions on 180-20 project and then did 9 repetitions on PSZ2G104 (project 199-16; Total target Nreps required for PSZ2G104 - 16/16 completed).

11h UT NOTE BY STEFANO: the make-imbfits for Arrays 1 and 3 seems to have stopped around 00:30 of Feb 13th. The situation of pool 49 is repeating. Please, start it again! I also urge the users to check this regularly and use the PIIC monitor for pointing (Ar2) and focus (Ar1).

09h - 15h; Aishwarya & Laurence: tau225 around 0.15 and stable atmosphere (no hint of anomalous refraction from the pointing). We observed 199-16 (PSZ2G108, PSZ2G045 and ACTJ2302) and did one high-quality calib_1scan on MWC349. The beam started to enlarge a bit at the end of our shift.

15h - 21h; Matthieu: The weather conditions were excellent with tau in the 0.15-0.18 range. We started with a beammap and a skydip. We then did 3 repeats of G157 and then 2 repeats of G93 (094-20). We then switched to 118-20 (SH2), when it was bright enough and completed this program. Everything went smoothly. Note of CK: Scan 203 of 094-20 shows excellent stability: 0.9Jy/b rms at 2mm.

21h - 03h; Carsten: finishing last scan on 118-20. Tau~0.17-0.21: Concerning 1mm arrays: IMBfits is working on scan 154 of yesterday, still far from scan 231 of what is needed now. Angel restarts the acquisition. Fraction of healthy KIDs increased. calib_1scan & beam map on 3C84. 160-16: NGC2976 (2h), M51 (2h, tau=0.22-0.24). Exceptionally stable conditions: 1Jy/b rms @ 2mm.

Feb 15th, Monday

03h - 09h; Guilaine: Tau between 0.23 and 0.28, but most of the time around 0.23-0.24. Atmosphere quite stable! Observations 4.21 hours on GOODSN (N2CLS). Then switch to PSZ2G108 (LPSZ) after a pointing/focus session from 8:15 to 8:30 (fwhms are very good, atm very stable).

09h - 15h; Emmanuel & Frédéric : tau225 around 0.2 and stable atmosphere . We observed 199-16 (PSZ2G108 and ACTJ2302) and did one calib_1scan on NGC7027. The beam started to enlarge a lot at the end of our shift and hence we have not done any beammap.

15h - 21h;

21h - 00h;

Feb 16th, Tuesday

03h - 09h;

09h - 10h30m;

DailyReportsNika2Pool090221 (last edited 2021-02-16 09:43:24 by NikaBolometer)