Back to the NIKA run 9

September 30th 2014

8h30 UT: Andrea arrives to the 30m to cool down the NIKA cryostat and to prepare all the facilities for the polarisation run.

STATUS OF THE INSTRUMENT

9h00 UT: Status of the Camera pulse tube : J1=96.3mbar - J2=329.8mbar - J3=297.3mbar - J4=160mbar - J5=350mbar

09h30 UT: Cryostat connected to the leak detector. Residual pressure in the cryostat 16mbar.

10h00 UT: Pumped the dilution circuit (until Jpi=2.2x10e-2mbar). Trap pumped.

11h UT: Pressions stables. The zero on J1 was -41mbar. Reset it again to 0mbar by changing the config file.

11h30 UT: M5 and M6 mounted. Optical alignment of the cryostat with Santiago, OK. LUNCH TIME.

12h30 UT: First Leak test. From 3x10e-9 to 2x10e-8, little scary, I'll do it again before switching on the pulse tube.

13h00 UT: Warm impedance test: between 18 and 20mbar/min at 2.9bar (ev1 closed). Consistent with the last cooling down.

13h15 UT: Circulation throught the capillar starts.

14h00 UT. Pumped ev18 for a few minutes with the turbo pump (down to 2e-4mbar). We had 0.2mbar in ev18. REMEMBER NOT TO TOUCH AGAIN ev18 from now on.

15h45 UT. Second Leak test. From 9.3x10e-9 to 2.5x10e-8. LET'S CONTINUE!

16h30 UT. Pulse Tube on. Low pressure and High pressure OK. Mixture circulates at 2.95bar (J4) and 950mbar (J2 with preref on).

20h05 UT: Lowering to 850mbar. Keep this value for the night.

20h15 UT: T4K=278K. Tstill=265K. Good night and good luck (to myself)

October 1st 2014

Cooling down still going on. Tests on acquisition software going on. We found few problems still to be fixed. Lots of e-mails and skype conversations between IRAM and Cardiff. The status is resumed in the STATUS OF THE POLARISATION FACILITIES

STATUS OF THE INSTRUMENT

05h40 UT: T4K=90K. Tstill=75K. Flux set at 630mbar.

07h00 UT: T4K=31K. Tstill=40K. Flux set at 530mbar.

10h35 UT: T4K=25K. Tstill=31K. Flux set at 360mbar. Nitrogen refill.

14h45 UT: T4K=7.2K. Tstill=10.3K. Flux set at 300mbar. Since the still and the mixing chamber are cooling down slowly, we decide to pump directly from ev17. The slope is much better.

17h35 UT: T4K=5.6K. Tstill=4.74K, R_BM=1.315kOhm Flux at 172mbar. Condensation Started.

21h40 UT: 100mK!!!

22h20 UT: Cold amplifiers on. Leak detector off. Small Nitrogen refill. We are out of IRAM nitrogen until tomorrow morning. Good Night.

STATUS OF THE POLARISATION FACILITIES

The new multi-layers Half Wave Plate is still in fabrication in Cardiff: all the capacitive stacks has been manufactured and tested showing results very close to expectations. The fabrication of the inductive stacks is in progress. Today at 4pm (French time) it was almost done. The plan is to set up and test the final HWP on Friday. If everything goes well someone from Cardiff will visit the telescope with the HWP on Monday or Tuesday. Therefore we have still the possibility to put the new HWP in front of the cryostat in the beginning of the observing campaign. If some delay occurs (manufacturing problems, low performance, etc...), we still have two backup solutions:

1) We use the old saphir single plate HWP which is here at the telescope.

2) People from Cardiff can give us two mesh HWPs each working in one NIKA band. The performance of these plates are presented in the two plots below. The performances are higher wrt the old saphir single plate even for the 1mm channel (much better for the 2mm channel).

hwp1.png hwp2.png

October 2nd 2014

04h40 UT: Stop Compressor. T_BM=88mK , T_still=690mK, T_4K=5.18K, J4 at 340mbar.

06h20 UT: T_BM=89.2mK pretty stable (DeltaT_BM about 0.1mK over 1h), T_still=750mK (DeltaT_still about 50mK over 1h), T_4K=5.26K (DeltaT_4K about 100mK over 1h), J4 at 480mbar increasing (slope 70mbar/1h).

08h00 UT: 100mK stage temperature regulated at 150mK.

20h00 UT: T_BM=150mK regulated, T_still=650mK stable, T_4K=5.18K (DeltaT_4K about 300mK over 12h), J4 at 540mbar; stable.

October 3rd 2014

Nicolas and Alessia joint the telescope.

STATUS OF THE INSTRUMENT

06h10 UT: T_BM=150mK regulated, T_still=650mK stable, T_4K=5.18K (DeltaT_4K about 300mK over 12h), J4 at 540mbar; stable.

bal1mm.png bal2mm.png

noise1mm.png noise2mm.png

STATUS OF THE POLARISATION FACILITIES

After the test of the HWP C stacks Cardiff measured the L stacks and they seemed to perform reasonably well. They clamped together the L and C stacks and they did preliminary tests rotating the stacks 'by hand':

The 'clamped' stacks have been sent to the clean room people, just a few minutes before they left.. and it will be now hot pressed and anti-reflection coated!

On Monday morning the mesh-HWP will be taken out the oven, cut to the 11.9 cm required diameter, and finally tested with the FTS. the performance in this final version could be better due to the presence of anti reflection coating and the fact that the 1mm and 2mm bands are much narrower than the spectral band tested with the FTS.

Aurelien Bideaud volunteered to come up at IRAM on Tuesday with the waveplate for staying a couple of days. We are organising flights and accomodation. Thanks Aurelien!!!