Differences between revisions 4 and 8 (spanning 4 versions)
Revision 4 as of 2014-01-14 13:58:13
Size: 1091
Comment:
Revision 8 as of 2014-01-15 11:56:49
Size: 1580
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
== STATUS == '''STATUS'''
Line 8: Line 8:
'''9h30: Reboot of the PC NIKA and change the VNC forwarding on the router. '''9h30:''' Reboot of the PC NIKA and change the VNC forwarding on the router.
Line 12: Line 12:
'''11h:''' Pressions stables. ZERO OF J1 IS -25mbar!!! '''11h:''' Pressions stables. '''ZERO OF J1 IS -25mbar!!!'''
Line 18: Line 18:
'''12h30m:''' Impedance 18mbar/min at 3bar. It is maybe less w.r.t. the last run cryo (not clear from the old files). WE
CONTINUE.
'''12h30m:''' Impedance 18mbar/min at 3bar. It is maybe less w.r.t. the last run cryo (not clear from the old files). '''WE
CONTINUE.'''
Line 21: Line 21:
'''13h:''' Leak test: OK, in the 1e-9 range.Pumped ev18 for 15 minutes. It was well empty in any case. REMEMBER NOT TO TOUCH ev18 ANYMORE. '''13h:''' Leak test: OK, in the 1e-9 range.Pumped ev18 for 15 minutes. It was well empty in any case. '''REMEMBER NOT TO TOUCH ev18 ANYMORE.'''
Line 28: Line 28:

'''15h30m:''' Lowering to 870mbar. Keep the same during the night.
Line 29: Line 31:
'''23h10m:''' T4K=160K. Tstill=125K. Lowering the flux at 630mbar for the night.


'''January 14th 2014''': Cooling down still going on.


'''STATUS'''

'''07h00m:''' T4K=25K. Tstill=30K. Lowering the flux at 340mbar.

'''09h15m:''' Close ev5.

'''10h30m:''' Coax connected, mppsync connected, computers on (archeops 8-9-10) in the control room

'''11h00m:''' Condensation starts.

Back to the NIKA run 7

January 14th 2014: Andrea Catalano come to the 30m to turn on the NIKA cryostat and checking the cool down remotely controlled from Grenoble (Alessandro Monfardini and Martino Calvo).

STATUS

9h30: Reboot of the PC NIKA and change the VNC forwarding on the router.

10h: Pumped the trap (J5=46mbar). Pumped the dilution circuit (until Jpi=3e-2mbar).

11h: Pressions stables. ZERO OF J1 IS -25mbar!!!

12h: Connected the leak detector. Residual pressure in the cryostat 6.6mbar.

12h15m: Optical alignment of the cryostat started.

12h30m: Impedance 18mbar/min at 3bar. It is maybe less w.r.t. the last run cryo (not clear from the old files). WE CONTINUE.

13h: Leak test: OK, in the 1e-9 range.Pumped ev18 for 15 minutes. It was well empty in any case. REMEMBER NOT TO TOUCH ev18 ANYMORE.

13h: Optical alignment OK.

14h: GREEN LIGHT for switching on the Pulse Tube. Mixture circulated for two hours at 3bar.

14h30m: Pulse Tube on with 900mbar.

15h30m: Lowering to 870mbar. Keep the same during the night.

23h10m: T4K=160K. Tstill=125K. Lowering the flux at 630mbar for the night.

January 14th 2014: Cooling down still going on.

STATUS

07h00m: T4K=25K. Tstill=30K. Lowering the flux at 340mbar.

09h15m: Close ev5.

10h30m: Coax connected, mppsync connected, computers on (archeops 8-9-10) in the control room

11h00m: Condensation starts.