|
Size: 1033
Comment:
|
Size: 1091
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 7: | Line 7: |
| 9h30: Reboot of the PC NIKA and change the VNC forwarding on the router. | |
| Line 9: | Line 8: |
| 10h: Pumped the trap (J5=46mbar). Pumped the dilution circuit (until Jpi=3e-2mbar). | '''9h30: Reboot of the PC NIKA and change the VNC forwarding on the router. |
| Line 11: | Line 10: |
| 11h: Pressions stables. ZERO OF J1 IS -25mbar!!! | '''10h:''' Pumped the trap (J5=46mbar). Pumped the dilution circuit (until Jpi=3e-2mbar). |
| Line 13: | Line 12: |
| 12h: Connected the leak detector. Residual pressure in the cryostat 6.6mbar. | '''11h:''' Pressions stables. ZERO OF J1 IS -25mbar!!! |
| Line 15: | Line 14: |
| 12h15m: Optical alignment of the cryostat started. | '''12h:''' Connected the leak detector. Residual pressure in the cryostat 6.6mbar. |
| Line 17: | Line 16: |
| 12h30m: Impedance 18mbar/min at 3bar. It is maybe less w.r.t. the last run cryo (not clear from the old files). WE | '''12h15m:''' Optical alignment of the cryostat started. '''12h30m:''' Impedance 18mbar/min at 3bar. It is maybe less w.r.t. the last run cryo (not clear from the old files). WE |
| Line 20: | Line 21: |
| 13h: Leak test: OK, in the 1e-9 range.Pumped ev18 for 15 minutes. It was well empty in any case. REMEMBER NOT TO TOUCH ev18 ANYMORE. | '''13h:''' Leak test: OK, in the 1e-9 range.Pumped ev18 for 15 minutes. It was well empty in any case. REMEMBER NOT TO TOUCH ev18 ANYMORE. |
| Line 22: | Line 23: |
| 13h: Optical alignment OK. | '''13h:''' Optical alignment OK. |
| Line 24: | Line 25: |
| 14h: GREEN LIGHT for switching on the Pulse Tube. Mixture circulated for two hours at 3bar. | '''14h:''' GREEN LIGHT for switching on the Pulse Tube. Mixture circulated for two hours at 3bar. |
| Line 26: | Line 27: |
| 14h:30m: Pulse Tube on with 900mbar. | '''14h30m:''' Pulse Tube on with 900mbar. |
January 14th 2014: Andrea Catalano come to the 30m to turn on the NIKA cryostat and checking the cool down remotely controlled from Grenoble (Alessandro Monfardini and Martino Calvo).
STATUS
9h30: Reboot of the PC NIKA and change the VNC forwarding on the router. 10h: Pumped the trap (J5=46mbar). Pumped the dilution circuit (until Jpi=3e-2mbar). 11h: Pressions stables. ZERO OF J1 IS -25mbar!!! 12h: Connected the leak detector. Residual pressure in the cryostat 6.6mbar. 12h15m: Optical alignment of the cryostat started. 12h30m: Impedance 18mbar/min at 3bar. It is maybe less w.r.t. the last run cryo (not clear from the old files). WE CONTINUE. 13h: Leak test: OK, in the 1e-9 range.Pumped ev18 for 15 minutes. It was well empty in any case. REMEMBER NOT TO TOUCH ev18 ANYMORE. 13h: Optical alignment OK. 14h: GREEN LIGHT for switching on the Pulse Tube. Mixture circulated for two hours at 3bar. 14h30m: Pulse Tube on with 900mbar.
