Line 1: Line 1:
[[NikaRun7|Back to the NIKA run 7]]
Line 5: Line 7:
9h30: Reboot of the PC NIKA and change the VNC forwarding on the router.
10h: Pumped the trap (J5=46mbar). Pumped the dilution circuit (until Jpi=3e-2mbar).
11h: Pressions stables. ZERO OF J1 IS -25mbar!!!
12h: Connected the leak detector. Residual pressure in the cryostat 6.6mbar.
12h15m: Optical alignment of the cryostat started.
12h30m: Impedance 18mbar/min at 3bar. It is maybe less w.r.t. the last run cryo (not clear from the old files). WE CONTINUE.
13h: Leak test: OK, in the 1e-9 range.Pumped ev18 for 15 minutes. It was well empty in any case. REMEMBER NOT TO TOUCH ev18 ANYMORE.
13h: Optical alignment OK.
14h: GREEN LIGHT for switching on the Pulse Tube. Mixture circulated for two hours at 3bar.
14h:30m: Pulse Tube on with 900mbar.

'''
9h30:''' Reboot of the PC NIKA and change the VNC forwarding on the router.

'''
10h:''' Pumped the trap (J5=46mbar). Pumped the dilution circuit (until Jpi=3e-2mbar).

'''11h:'''
Pressions stables. '''ZERO OF J1 IS -25mbar!!!'''

'''
12h:''' Connected the leak detector. Residual pressure in the cryostat 6.6mbar.

'''
12h15m:''' Optical alignment of the cryostat started.

'''
12h30m:''' Impedance 18mbar/min at 3bar. It is maybe less w.r.t. the last run cryo (not clear from the old files). '''WE
CONTINUE.'''

'''
13h:''' Leak test: OK, in the 1e-9 range.Pumped ev18 for 15 minutes. It was well empty in any case. '''REMEMBER NOT TO TOUCH ev18 ANYMORE.'''

'''
13h:''' Optical alignment OK.

'''
14h:''' GREEN LIGHT for switching on the Pulse Tube. Mixture circulated for two hours at 3bar.

'''
14h30m:''' Pulse Tube on with 900mbar.

Back to the NIKA run 7

January 14th 2014: Andrea Catalano come to the 30m to turn on the NIKA cryostat and checking the cool down remotely controlled from Grenoble (Alessandro Monfardini and Martino Calvo).

STATUS

9h30: Reboot of the PC NIKA and change the VNC forwarding on the router.

10h: Pumped the trap (J5=46mbar). Pumped the dilution circuit (until Jpi=3e-2mbar).

11h: Pressions stables. ZERO OF J1 IS -25mbar!!!

12h: Connected the leak detector. Residual pressure in the cryostat 6.6mbar.

12h15m: Optical alignment of the cryostat started.

12h30m: Impedance 18mbar/min at 3bar. It is maybe less w.r.t. the last run cryo (not clear from the old files). WE CONTINUE.

13h: Leak test: OK, in the 1e-9 range.Pumped ev18 for 15 minutes. It was well empty in any case. REMEMBER NOT TO TOUCH ev18 ANYMORE.

13h: Optical alignment OK.

14h: GREEN LIGHT for switching on the Pulse Tube. Mixture circulated for two hours at 3bar.

14h30m: Pulse Tube on with 900mbar.