Size: 900
Comment:
|
Size: 3322
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
NIKA January 2014 S1 | [[NikaRun7|Back to the NIKA run 7]] |
Line 3: | Line 3: |
[[D2DLogNika7 |Back to list of day to day logbook of observations]] | == Day to day observation logbook == |
Line 5: | Line 5: |
== 2014-01-20 == | || [[NK2014_Jan20|Nika 2014-01-20 sheet1]] || link to summary table with plots || 2 hours observed / 2 hours scheduled || || [[NK2014_Jan21|Nika 2014-01-21 sheet2]] || link to summary table with plots || ~5.5 h obs / 6.5 h schedul, but mostly poor weather || || [[NK2014_Jan22|Nika 2014-01-22 sheet3]] see also [[https://tapas.iram.es/tapas/ | TAPAS]] & [[https://pools.iram.es | Pool]] database || [[Plots_Jan22_2014 | link to summary table with plots]] || <8h h obs / 12 h schedul, stopped due to bad weather || || [[NK2014_Jan23|Nika 2014-01-23 sheet4]] see also [[https://tapas.iram.es/tapas/ | TAPAS]] & [[https://pools.iram.es | Pool]] database || [[Plots_Jan23_2014 |link to summary table with plots ]] || 4h h obs / 9 h schedul, stopped due to bad weather || || [[NK2014_Jan24|Nika 2014-01-24 sheet5]], [[https://tapas.iram.es/tapas/ | TAPAS]] & [[https://pools.iram.es | Pool]] may miss some crosses and otf; to be checked || [[ Plots_Jan24_2014 | link to summary table with plots ]]|| ~8h h obs / 9 h schedul, but 2nd half very windy || || [[NK2014_Jan25|Nika 2014-01-25 sheet6]] the [[https://tapas.iram.es/tapas/ | TAPAS]] & [[https://pools.iram.es | Pool]] may miss some crosses and otf; to be checked || link to summary table with [[PlotsNika2014Jan25|plots]] || 4h h obs / 9 h schedul, stopped due to wind, 1st half very windy|| || [[NK2014_Jan26|Nika 2014-01-26 sheet7]] the [[https://tapas.iram.es/tapas/ | TAPAS]] & [[https://pools.iram.es | Pool]] may miss some crosses and otf; to be checked || link to summary table with plots || 9h h obs / 9 h schedul, best obs conditions of the week|| || [[NK2014_Jan27|Nika 2014-01-27 sheet8]] the [[https://tapas.iram.es/tapas/ | TAPAS]] & [[https://pools.iram.es | Pool]] may miss some crosses and otf; to be checked || link to summary table with plots || 8h h obs / 8 h schedul, good with some wind around sunset|| |
Line 7: | Line 14: |
.Cryostat Temperature: 216mK (naturally set by settings of 3He circulation [no heater] trying to mitigate oscillation due to leak). .Arrays status tonight: pixels 2mm - xxx noise; XX pixels 1mm xxx noise (to be determined) Modulation frequency: 8kHz 1mm, 4kHz 2mm |
== Quick summary of observations per day == |
Line 11: | Line 16: |
Opacity is measured with the new taumeter at 225 GHz | ==== Mon, Jan 20 ==== .First light. Check detector noise. Test main scripts to be used: ''track, cross, pointliss, focusp, focusliss, otfgeom, skydip_up, skydip_updown''. .Radio alignment by background minimization. .No antenna data for the entire session. |
Line 13: | Line 21: |
Nasmyth offsets : 0, 0 | ==== Tue, Jan 21 ==== .Investigation on the Nasmyth offsets: understand how the telescope Nasmyth reference coordinates are projected on the array. .Investigation on the alignment: RADIO ALIGNMENT BY BACKGROUND MINIMIZATION DOESN'T WORK; using the laser alignment give stronger signals; the background minimization is probably due to vignetting of the pupil by the sky next to M2. .Statistics on pointing corrections, pointing at a source for 1 hour. test script ''otf10x10''. 2 beam maps. |
Line 15: | Line 26: |
Set pointing : 0, 0 | ==== Wed, Jan 22 ==== .Iterations on focus scans to check focus variability. .1 beam map. Additional tests on Nasmyth offsets. .Use bad weather condition to test acquisition procedures and data with polarizer components: 1st modulator on, no half-wave plate, then with HWP immobile, then rotating. Try optimization of polarizer angle. Test scripts ''otf5x5, otf5x5_pol, otf5x5_half''. .Last test with Nasmyth offset, choose ''''reference detector: 494 on the 2mm array.''' . Secondary calibrator: W3OH. |
Line 17: | Line 33: |
Set Focus : -2.40 mm .Quick description of the session: Test the Pako sequences and data flows. ||'''Scan'''||'''UT'''||'''Source'''||'''Command''' ||'''Az'''||'''El'''||'''Pointing X, Y, Focus'''||'''Tau225'''|| '''Comment''' || || 140 || ~ 16h || Mars || Track || || || || || closed window, test data tranfert || |
==== Thu, Jan 23 ==== . |
Day to day observation logbook
link to summary table with plots |
2 hours observed / 2 hours scheduled |
|
link to summary table with plots |
~5.5 h obs / 6.5 h schedul, but mostly poor weather |
|
Nika 2014-01-22 sheet3 see also TAPAS & Pool database |
<8h h obs / 12 h schedul, stopped due to bad weather |
|
Nika 2014-01-23 sheet4 see also TAPAS & Pool database |
4h h obs / 9 h schedul, stopped due to bad weather |
|
Nika 2014-01-24 sheet5, TAPAS & Pool may miss some crosses and otf; to be checked |
~8h h obs / 9 h schedul, but 2nd half very windy |
|
Nika 2014-01-25 sheet6 the TAPAS & Pool may miss some crosses and otf; to be checked |
link to summary table with plots |
4h h obs / 9 h schedul, stopped due to wind, 1st half very windy |
Nika 2014-01-26 sheet7 the TAPAS & Pool may miss some crosses and otf; to be checked |
link to summary table with plots |
9h h obs / 9 h schedul, best obs conditions of the week |
Nika 2014-01-27 sheet8 the TAPAS & Pool may miss some crosses and otf; to be checked |
link to summary table with plots |
8h h obs / 8 h schedul, good with some wind around sunset |
Quick summary of observations per day
Mon, Jan 20
First light. Check detector noise. Test main scripts to be used: track, cross, pointliss, focusp, focusliss, otfgeom, skydip_up, skydip_updown.
- Radio alignment by background minimization.
- No antenna data for the entire session.
Tue, Jan 21
- Investigation on the Nasmyth offsets: understand how the telescope Nasmyth reference coordinates are projected on the array.
- Investigation on the alignment: RADIO ALIGNMENT BY BACKGROUND MINIMIZATION DOESN'T WORK; using the laser alignment give stronger signals; the background minimization is probably due to vignetting of the pupil by the sky next to M2.
Statistics on pointing corrections, pointing at a source for 1 hour. test script otf10x10. 2 beam maps.
Wed, Jan 22
- Iterations on focus scans to check focus variability.
- 1 beam map. Additional tests on Nasmyth offsets.
Use bad weather condition to test acquisition procedures and data with polarizer components: 1st modulator on, no half-wave plate, then with HWP immobile, then rotating. Try optimization of polarizer angle. Test scripts otf5x5, otf5x5_pol, otf5x5_half.
Last test with Nasmyth offset, choose 'reference detector: 494 on the 2mm array.
- Secondary calibrator: W3OH.