Differences between revisions 4 and 27 (spanning 23 versions)
Revision 4 as of 2014-03-27 11:15:04
Size: 422
Editor: 2a00:9ac0:4c:ff0a:221:9bff:fe19:411f
Comment:
Revision 27 as of 2014-04-14 10:14:33
Size: 2512
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
'''[[ http://www.iram.es/IRAMES/mainWiki/NIKA/Main | Go back to the NIKA Main Wiki ]]''' Go back to the '''[[ http://www.iram.es/IRAMES/mainWiki/NIKA/Main | NIKA ]]''' main wiki.
Line 11: Line 11:
== Goals of the run ==

 1. Check that the delays and holes in NCS data streams do not re-appear when NIKA is running.
 1. Debug the IMBFITS formating so that they are at last produced without errors, and finally allow real time processing.
 1. Test for the first time operations with only IRAM Granada personnel at the Telescope and NIKA Grenoble team using remote control.

== Organization Plan ==

 The dominant components of the goal do not necessitate sensitive KID, so no cool down of the instrument. However the full setup of the instrument of observations on sky must be operational; this includes the full electronic chain and real scans of the telescope commanded via !PaKo. Though we could keep the electronics the cable spiral room and control the detectors acquisition via the network, which would be a good test of this new network link, we have decided to lift it up in the cabin hence mimicking real observations as much as possible with a warm cryostat. Indeed the problems we had may be related to the network setup.

 We will debug the IMBFITS step by step. People involved in the NIKA data & IMBFITS making & checking (Albrecht, Juan MP, Xavier, Alain, Robert, Samuel, and possibly Walter and Nicolas P) communicate via this wiki page to establish very clearly the main problems and action to do to solve them (see table below), and possibly use the data we currently have to start debugging, so that we are as ready as possible for May 7.
 
 After this dry run, we will make the status, and determine a date for another short test run (e.g. begin of June ?). Hopefully for this one only the problems that necessitate valid KID data (e.g. KID flags) remain. In that case this short run would be cold.

== Table of IMBFITS problems to solve ==
Line 13: Line 29:
<<CheckList(dom_id=check3, heading=3, text=Something to do in conjunction with above)>>
<chklist>[x] IH: Create the organization wiki </chklist>
|| I. Hermelo || Create the organization wiki || (./) ||
|| Receiver group || ... || {X} ||
|| NIKA team || ... || {X} ||
|| Computer group || ... || {X} ||
|| I. Hermelo || Book rooms at the telescope (no transport on Wed 7th May) || {X} ||

NIKA dry run organization

Go back to the NIKA main wiki.


Goals of the run

  1. Check that the delays and holes in NCS data streams do not re-appear when NIKA is running.
  2. Debug the IMBFITS formating so that they are at last produced without errors, and finally allow real time processing.
  3. Test for the first time operations with only IRAM Granada personnel at the Telescope and NIKA Grenoble team using remote control.

Organization Plan

  • The dominant components of the goal do not necessitate sensitive KID, so no cool down of the instrument. However the full setup of the instrument of observations on sky must be operational; this includes the full electronic chain and real scans of the telescope commanded via PaKo. Though we could keep the electronics the cable spiral room and control the detectors acquisition via the network, which would be a good test of this new network link, we have decided to lift it up in the cabin hence mimicking real observations as much as possible with a warm cryostat. Indeed the problems we had may be related to the network setup.

    We will debug the IMBFITS step by step. People involved in the NIKA data & IMBFITS making & checking (Albrecht, Juan MP, Xavier, Alain, Robert, Samuel, and possibly Walter and Nicolas P) communicate via this wiki page to establish very clearly the main problems and action to do to solve them (see table below), and possibly use the data we currently have to start debugging, so that we are as ready as possible for May 7. After this dry run, we will make the status, and determine a date for another short test run (e.g. begin of June ?). Hopefully for this one only the problems that necessitate valid KID data (e.g. KID flags) remain. In that case this short run would be cold.

Table of IMBFITS problems to solve

Task list

I. Hermelo

Create the organization wiki

(./)

Receiver group

...

{X}

NIKA team

...

{X}

Computer group

...

{X}

I. Hermelo

Book rooms at the telescope (no transport on Wed 7th May)

{X}