Differences between revisions 2 and 77 (spanning 75 versions)
Revision 2 as of 2014-08-25 13:12:51
Size: 3133
Editor: mrt-lx20
Comment:
Revision 77 as of 2014-11-03 09:23:35
Size: 6068
Editor: gra-lx17
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= 2nd NIKA Pool Organization = = 2nd NIKA Pool Organization, NIKA run #10 (November 2014) =
Line 3: Line 3:
[[NIKA/Main|Back to the NIKA main page]]
Line 4: Line 5:
The 2nd open NIKA pool will take place from the 21st to the 28th of October 2014. [[ListOfAstroTarget2014N10 | List of Astronomical Targets, observing strategies & documentation]]

[[DailyReports10 | Daily Reports]]

[[D2DLogNika10 |Day to day logbook of observations & Quick look plots table]]

The 2nd open NIKA pool will take place from the 11th to the 21st of November 2014. Here is the precise schedule [[ http://www.iram.fr/IRAMFR/PV/sche/14/s45v2.html | week1]] and [[ http://www.iram.fr/IRAMFR/PV/sche/14/s47v2.html | week2]]
Line 6: Line 14:

'''[[ http://www.iram.es/IRAMES/mainWiki/NIKA/Main | Go to the NIKA Main Page ]]'''
Line 12: Line 18:
Visiting observers must fill out the [[http://www.iram.es/IRAMES/forms/obsrequest/ | standard travel form]] well in advance of their travel dates. When submitted the form is sent to Esther Franzin at IRAM/Granada (and Cathy Berjaud at IRAM/Grenbble) who will then reserve room in Granada and at the telescope. As we only have a limited number of sleeping rooms at the telescope, this step is absolutely required. Esther is also the right person if you have questions about transportation.
Line 16: Line 23:
|| || Sat 15 || Sun 16 || Mon 17 || Tue 18 || Wed 19 || Thu 20 || Fri 21 || Sat 22 || Sun 23 || Mon 24 || Tue 25 || Wed 26 || Thu 27 || Fri 28 || Sat 29 || Sun 30 || Mon 01 || Tue 02 ||
||||||||||||||||||||||||||||||||||||||||||||||||||<style="text-align: left;">'''IRAM Staff'''||
|| N. Billot || || || || TC || TC || TC || TC || TC || TC || || || || || || || || || ||
|| I. Hermelo || || || || || || || || || || TC || TC || TC || TC || TC || TC || TC || TC || TC ||
||||||||||||||||||||||||||||||||||||||||||||||||||<style="text-align: left;">'''NIKA Team'''||
|| || || || R1 || TA || TA || TA || TA || TA || TA || TA || R1 || || || || || || || ||
|| || || || R2 || TB || TB || TB || TB || TB || TB || TB || R2 || || || || || || || ||
|| || || || R3 || TC || TC || TC || TC || TC || TC || TC || R3 || || || || || || || ||
||||||||||||||||||||||||||||||||||||||||||||||||||<style="text-align: left;">'''External Observers'''||
|| || || || R3 || TA || TA || TA || TA || TA || TA || TA || R3 || || || || || || || ||
|| || || || R4 || TB || TB || TB || TB || TB || TB || TB || R4 || || || || || || || ||
|| || || || R5 || TC || TC || TC || TC || TC || TC || TC || R5 || || || || || || || ||
|| '''November''' || Fri 07 || Sat 08 || Sun 09 || Mon 10 || Tue 11 || Wed 12 || Thu 13 || Fri 14 || Sat 15 || Sun 16 || Mon 17 || Tue 18 || Wed 19 || Thu 20 || Fri 21 || Sat 22 || Sun 23 || Mon 24 || Tue 25 ||
||||||||||||||||||||||||||||||||||||||||||||||||||||<style="text-align: center;">'''IRAM Staff'''||
|| N. Billot || || || || || D || D || D || D || D || D || D || || || || || || || || ||
|| I. Hermelo || D || D || D || D || || || || || || || || D || D || D || D || D || D || D || ||
||||||||||||||||||||||||||||||||||||||||||||||||||||<style="text-align: center;">'''NIKA Team'''||
|| A. Monfardini || A1 || A1 || A1 || A1 || A1 || A1 || A1 || || || || || || || || || || || || ||
|| B. Comis || B1 || B1 || B1 || || || || || || || || || || || || || || || || ||
|| A. Beelen || || || || || C1 || C1 || C1 || C1 || C1 || C1 || || || || || || || || || ||
|| G.Lagache || || || || || || || B1 || B1 || B1 || B1 || || || || || || || || || ||
|| M. Calvo || || || || || || || || A1 || A1 || A1 || A1 || A1 || A1 || A1 || || || || || ||
|| R. Adam || || || || || || B1 || C1 || || || || B1 || B1 || B1 || B1 || || || || || ||
|| J.F. Macias-Perez || || || || B1 || B1 || || || || || || || || || || || || || || ||
|| F. Mayet || || || || || || || || || || || C1 || C1 || C1 || || || || || || ||
||||||||||||||||||||||||||||||||||||||||||||||||||||<style="text-align: center;">'''External Observers'''||
|| J. F. Lestrade [060-14] || || || || || 3 || 3 || 3 || 3 || 3 || 3 || || || || || || || || || ||
|| R. Paladini [048-14] || || || || || 4 || 4 || 4 || 4 || 4 || 4 || || || || || || || || || ||
|| Y. Shirley [049-40] || || || || || || || || || || || 3 || 3 || 3 || 3 || || || || || ||
|| M. Albrecht [097-40] || || || || || || || || || || || 4 || 4 || 4 || 4 || || || || || ||
Line 29: Line 42:
T* are rooms at the IRAM 30m telescope (click [[ http://www.iram.es/IRAMES/groups/telescope/planning/pdfnext.pdf | here ]] to obtain the offical room planning).
R* are rooms at the IRAM's downtown residencia.
Rooms A, B, and C are double.
R
oom E is single.
C
lick [[ http://www.iram.es/IRAMES/groups/telescope/planning/ | here ]] to obtain the offical room planning.
Line 35: Line 49:
== Proposals participating in the 6th GISMO Pool (October 2014) == == Proposals participating in the 2nd NIKA Pool (October 2014) ==
Line 37: Line 51:
{{attachment:6thGISMOpoolProjects.png|Projects|width=1300}} {{attachment:2ndNIKApoolProjects.png|Projects|width=1300}}
Line 40: Line 54:
== Technical time observations ==
|| '''Day''' || At the telescope || Offline ||
|| Friday 7 || Alessandro & Barbara || Juan, Nico, Rémi, FXD ||
|| Sunday 9 || Alessandro & Barbara || Nico, Rémi, FXD ||
|| Monday 10 || Alessandro & Juan || Nico, Rémi, FXD ||


 '''List of tests'''
 *Check there are not holes in the data, neither jumps
 *Tests standard Pako scripts and new ones (see commands below)
 *Check nika_elvin works properly and that all messages are correctly handled
 *Verify tuning setup - message.c
 *Do geometry
 *Do skydip (two scripts are available)

 '''List of new Pako scripts'''
 *XXXXX
Line 46: Line 77:
Created: 2014.06.23 Created: 2014.08.25
Line 48: Line 79:
Last update: 2014.08.25 Last update: 2014.10.01

2nd NIKA Pool Organization, NIKA run #10 (November 2014)

Back to the NIKA main page

List of Astronomical Targets, observing strategies & documentation

Daily Reports

Day to day logbook of observations & Quick look plots table

The 2nd open NIKA pool will take place from the 11th to the 21st of November 2014. Here is the precise schedule week1 and week2

Please read the general rules for pooled observations at the IRAM 30m radiotelescope.


Visiting observers must fill out the standard travel form well in advance of their travel dates. When submitted the form is sent to Esther Franzin at IRAM/Granada (and Cathy Berjaud at IRAM/Grenbble) who will then reserve room in Granada and at the telescope. As we only have a limited number of sleeping rooms at the telescope, this step is absolutely required. Esther is also the right person if you have questions about transportation.

Room occupancy

November

Fri 07

Sat 08

Sun 09

Mon 10

Tue 11

Wed 12

Thu 13

Fri 14

Sat 15

Sun 16

Mon 17

Tue 18

Wed 19

Thu 20

Fri 21

Sat 22

Sun 23

Mon 24

Tue 25

IRAM Staff

N. Billot

D

D

D

D

D

D

D

I. Hermelo

D

D

D

D

D

D

D

D

D

D

D

NIKA Team

A. Monfardini

A1

A1

A1

A1

A1

A1

A1

B. Comis

B1

B1

B1

A. Beelen

C1

C1

C1

C1

C1

C1

G.Lagache

B1

B1

B1

B1

M. Calvo

A1

A1

A1

A1

A1

A1

A1

R. Adam

B1

C1

B1

B1

B1

B1

J.F. Macias-Perez

B1

B1

F. Mayet

C1

C1

C1

External Observers

J. F. Lestrade [060-14]

3

3

3

3

3

3

R. Paladini [048-14]

4

4

4

4

4

4

Y. Shirley [049-40]

3

3

3

3

M. Albrecht [097-40]

4

4

4

4

Rooms A, B, and C are double. Room E is single. Click here to obtain the offical room planning.


Proposals participating in the 2nd NIKA Pool (October 2014)

Projects

Technical time observations

Day

At the telescope

Offline

Friday 7

Alessandro & Barbara

Juan, Nico, Rémi, FXD

Sunday 9

Alessandro & Barbara

Nico, Rémi, FXD

Monday 10

Alessandro & Juan

Nico, Rémi, FXD

  • List of tests

  • Check there are not holes in the data, neither jumps
  • Tests standard Pako scripts and new ones (see commands below)
  • Check nika_elvin works properly and that all messages are correctly handled
  • Verify tuning setup - message.c
  • Do geometry
  • Do skydip (two scripts are available)

    List of new Pako scripts

  • XXXXX


Author: Israel Hermelo (IRAM 30m Continuum Pool Manager)

email: hermelo@iram.es

Created: 2014.08.25

Last update: 2014.10.01

Continuum/PoolOrganization/2ndNIKApool (last edited 2014-11-17 09:24:13 by NikaBolometer)