Differences between revisions 46 and 49 (spanning 3 versions)
Revision 46 as of 2020-09-28 11:04:21
Size: 4671
Comment:
Revision 49 as of 2024-01-28 12:46:41
Size: 4958
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
 * [[attachment:NIKA2Pol_Commissioning_report_Summary_January_2024.pdf|Ajeddig et al. 2024, NIKA2-Pol : summary of polarization commissioning report]]
Line 36: Line 37:
 * Penalver, 2012, IRAM internal report on gain-elevation curve [[atttachment:penalver-16apr2012-GainElevation.pdf]]  * Penalver, 2012, IRAM internal report on gain-elevation curve [[attachment:penalver-16apr2012-GainElevation.pdf]]
Line 46: Line 47:
 * Ungerechts et al. 1999, "IRAM 30m Telescope: spectral line on-the-fly mapping (SL-OTF)" [[attachment:ungerechts-1999-sl-otf.pdf]]

Back to the Science Support Group page
IRAM working reports compiled in Grenoble

Papers and Reports on Calibration of the IRAM 30m telescope

(this page is maintained by C.Kramer)

CalibrationPapers (last edited 2024-01-28 12:46:41 by CarstenKramer)