Differences between revisions 44 and 49 (spanning 5 versions)
Revision 44 as of 2017-01-20 11:14:54
Size: 4647
Comment:
Revision 49 as of 2024-01-28 12:46:41
Size: 4958
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
 * [[attachment:NIKA2Pol_Commissioning_report_Summary_January_2024.pdf|Ajeddig et al. 2024, NIKA2-Pol : summary of polarization commissioning report]]
Line 20: Line 21:
 * Greve, Penalver et al. 2010, "Improvement of the IRAM 30m telescope beam pattern", in prep.
Line 37: Line 37:
 * Penalver, 2012, IRAM internal report on gain-elevation curve [[attachment:penalver-16apr2012-GainElevation.pdf]]
Line 45: Line 47:
 * Ungerechts et al. 1999, "IRAM 30m Telescope: spectral line on-the-fly mapping (SL-OTF)" [[attachment:ungerechts-1999-sl-otf.pdf]]

Back to the Science Support Group page
IRAM working reports compiled in Grenoble

Papers and Reports on Calibration of the IRAM 30m telescope

(this page is maintained by C.Kramer)

CalibrationPapers (last edited 2024-01-28 12:46:41 by CarstenKramer)