Differences between revisions 30 and 33 (spanning 3 versions)
Revision 30 as of 2011-06-14 19:29:32
Size: 3018
Editor: 194
Comment:
Revision 33 as of 2011-06-14 19:33:38
Size: 3212
Editor: 194
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
 * Greve et al. 1998, [[http://esoads.eso.org/abs/1998A%26AS..132..413G|"The gain-elevation correction of the IRAM 30m telescope"]], A&A, 132, 413  * Greve, Neri, Sievers 1998, [[http://esoads.eso.org/abs/1998A%26AS..132..413G|"The gain-elevation correction of the IRAM 30m telescope"]], A&A, 132, 413
Line 12: Line 12:
 * Greve et al. 2002, "IEEE Transactions on Antennas and Propagation, Vol. 53, No.2, February 2005" [[attachment:greve-2002-temperFEM.pdf|paper]]  * Greve, Bremer, Penalver 2002, "IEEE Transactions on Antennas and Propagation, Vol. 53, No.2, February 2005" [[attachment:greve-2002-temperFEM.pdf|paper]]
Line 24: Line 24:
 * Kramer, Moreno, Greve 2008, Long-term observations of Uranus and Neptune at 90 GHz with the IRAM 30m telescope - (1985 -- 2005) [[http://arxiv.org/abs/0801.4452|astroph]]

Papers and Reports on Calibration of the IRAM 30m telescope

(this page is maintained by C.Kramer)

CalibrationPapers (last edited 2024-01-28 12:46:41 by CarstenKramer)