This page gathers the information on the baseline calibration and the reference kidpar of the run.

Beammaps

Beammap analysis status

The table below gathers the beammap scan ID, comments related either to the observing condition or to the reduced beammap quality and the analysis status

Status "done" means the analysis is completed, namely the kidpar file is produced using a 2-step iteration analysis, and uploaded in SVN.

observing condition

analysis status

scan ID

source

UT

elevation

comments

analyser ID

data quality

status

Opacity

A skydip scan per 8-hour observation shift, in all possible weather conditions, is needed

Table of the Skydip scans

Dates

scan #

tau225

UT

comment


Baseline Calibration Plots