1 30.12.-6.1. I.Hermelo
2 6.-13.1. C.Marka Heterodyne Pool
3 13.-20.1. G.Paubert Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?)
4 20.-27.1. M.Ruiz & I.Ruiz (operators), I. Hermelo (23.-26.1) NIKA prep. time (T21, 23-25.2.)
5 27.1.-3.2. N.Billot NIKA Pool
6 3.-10.2. I.Hermelo NIKA Pool
7 10.-17.2. A.Sievers NIKA Polarimetry test run
8 17.-24.2. N.Billot
9 24.2.-3.3. I.Hermelo GISMO Pool
10 3.-10.3. G.Paubert Pulsar observations
11 10.-17.3. C.Marka IRAM Deadline on 12-Mar
12 17.-24.3. S.Trevino Heterodyne Pool (flexible 1mm VLBI)
13 24.-31.3. C.Marka Heterodyne Pool(flexible 1mm VLBI)
14 31.3.-7.4. H.Ungerechts (from Granada)
15 7.-14.4. G.Paubert (from Granada) Installation of new optics
16 14.-21.4. A.Sievers Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.)
17 21.-28.4. C.Marka Astronomical commissioning + flexible & internal pool observations
18 28.4.-5.5.
19 5.-12.5. N.Billot
20 12.-19.5.
21 19.-26.5.
22 26.5.-2.6.

Old AoD Plans: