|
|
|
|
|
| 1 |
31.12.-7.1. |
J.L.Santaren & F.Damour (Operators, 31.12.-3.1.), G.Paubert (3.1.-7.1.) |
|
|
| 2 |
7.-14.1. |
M.Gonzalez |
Heterodyne Pool |
|
| 3 |
14.-21.1. |
N.Billot |
NIKA Cool down |
|
| 4 |
21.-28.1. |
A.Sievers |
NIKA tests |
|
| 5 |
28.1.-4.2. |
S.Trevino |
|
|
| 6 |
4.-11.2. |
M.Gonzalez (4-7 Feb) and I.Hermelo(7-11 Feb) |
Heterodyne Pool |
|
| 7 |
11.18.2. |
J.L.Santaren & F.Damour (Operators, 11-14 Feb) and I.Hermelo (14-18 Feb) |
13./14.: 8h VLBI |
|
| 8 |
18.-25.2. |
N.Billot |
NIKA 1st open pool run (18.-28.2.) |
|
| 9 |
25.2.-4.3. |
I.Hermelo |
NIKA pool till 28.2. |
|
| 10 |
4.-11.3. |
M.Gonzalez |
Heterodyne Pool |
|
| 11 |
11.-18.3. |
A.Sievers (11.-14.3.), G.Paubert (14.-18.3.) |
Proposal deadline 13.3., Students of J.LeBourlot |
|
| 12 |
18.-25.3. |
S.Trevino |
|
|
| 13 |
25.-1.4. |
C.Kramer (-28.3.), N.Billot (28.3.-1.4.) |
|
|
| 14 |
1.-8.4. |
I.Hermelo |
GISMO pool (1.-11.4.) |
|
| 15 |
8.-15.4. |
I.Hermelo (8.-11.4.), C.Kramer (11.-15.4.) |
PC-Meeting 9./10. |
|
| 16 |
15.-22.4. |
S.Trevino (15.-18.4.), M.Ruiz (day-time operator, 18.-22.4.) |
|
|
| 17 |
22.-29.4. |
A.Sievers (from Granada) |
|
|
| 18 |
29.4.-6.5. |
N.Billot |
|
|
| 19 |
6.-13.5. |
I.Hermelo (6.-9.5.), S.Trevino (9.-12.5.), I.Hermelo (12.-13.5.) |
NIKA dry runs (7.5., 12.5.) |
|
| 20 |
13.-20.5. |
C.Kramer |
1st 24hours holography run (14./15.5.) |
|
| 21 |
20.-27.5. |
M.Ruiz (operator) |
3mm VLBI (22.-28.5.) |
|
| 22 |
27.5.-3.6. |
S.Trevino |
|
|
| 23 |
3.-10.6. |
M.Gonzalez |
|
|
| 24 |
10.-17.6. |
G.Paubert (10.-13.6., 14.-27.6. from Granada) |
|
|
| 25 |
17.-24.6. |
S.Trevino |
|
|
| 26 |
24.6.-1.7. |
M.Gonzalez (24.-27.6.), I.Hermelo (27.6.-1.7.) |
|
|