|
|
|
|
|
1 |
31.12.-7.1. |
J.L.Santaren & F.Damour (Operators, 31.12.-3.1.), G.Paubert (3.1.-7.1.) |
|
|
2 |
7.-14.1. |
M.Gonzalez |
Heterodyne Pool |
|
3 |
14.-21.1. |
N.Billot |
NIKA Cool down |
|
4 |
21.-28.1. |
A.Sievers |
NIKA tests |
|
5 |
28.1.-4.2. |
S.Trevino |
|
|
6 |
4.-11.2. |
M.Gonzalez (4-7 Feb) and I.Hermelo(7-11 Feb) |
Heterodyne Pool |
|
7 |
11.18.2. |
J.L.Santaren & F.Damour (Operators, 11-14 Feb) and I.Hermelo (14-18 Feb) |
13./14.: 8h VLBI |
|
8 |
18.-25.2. |
N.Billot |
NIKA 1st open pool run (18.-28.2.) |
|
9 |
25.2.-4.3. |
I.Hermelo |
NIKA pool till 28.2. |
|
10 |
4.-11.3. |
M.Gonzalez |
Heterodyne Pool |
|
11 |
11.-18.3. |
A.Sievers (11.-14.3.), G.Paubert (14.-18.3.) |
Proposal deadline 13.3., Students of J.LeBourlot |
|
12 |
18.-25.3. |
S.Trevino |
|
|
13 |
25.-1.4. |
C.Kramer (-28.3.), N.Billot (28.3.-1.4.) |
|
|
14 |
1.-8.4. |
I.Hermelo |
GISMO pool (1.-11.4.) |
|
15 |
8.-15.4. |
M.Gonzalez (8.-11.4.), C.Kramer (11.-15.4.) |
PC-Meeting 9./10. |
|
16 |
15.-22.4. |
S.Trevino (15.-18.4.), M.Ruiz (day-time operator, 18.-22.4.) |
|
|
17 |
22.-29.4. |
A.Sievers (22.-24.4., 25.-29.4. from Granada) |
|
|
18 |
29.4.-6.5. |
N.Billot |
|
|
19 |
6.-13.5. |
S.Trevino |
|
|
20 |
13.-20.5. |
I.Hermelo |
|
|
21 |
20.-27.5. |
M.Ruiz (operator) |
3mm VLBI (22.-28.5.) |
|
22 |
27.5.-3.6. |
S.Trevino |
|
|
23 |
3.-10.6. |
M.Gonzalez |
|
|
24 |
10.-17.6. |
G.Paubert (10.-13.6., 14.-27.6. from Granada) |
|
|
25 |
17.-24.6. |
S.Trevino |
|
|
26 |
24.6.-1.7. |
M.Gonzalez (24.-27.6.), I.Hermelo (27.6.-1.7.) |
|
|