1 1.-8.1.2013 G.Bruni
2 8.-15.1.2013 A.Sievers
3 15.-22.1.2013 M.Gonzalez Pool
4 22.-29.1.2013 N.Billot Pool
5 29.1.-5.2. S.Trevino
6 5.-12.2. J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.
7 12.-19.2. N.Billot Pool, VLBI test on 14. or 18.2.
8 19.-26.2. M.Gonzalez, I.Hermelo (19., 22.-26.2.) Pool
9 26.2.-5.3. J.L.Santaren (night-time operator)
10 5.-12.3. S.Trevino, I.Hermelo
11 12.-19.3. M.Gonzalez 11.-13. HEMT installation & alignment, 15.-18. J.LeBourlot with students
12 19.-26.3. G.Paubert (19.-22.3.), I.Hermelo (22.-29.3.) Pool & 1mm VLBI
13 26.3.-2.4. F.Damour (day-time operator), I.Hermelo (22.-29.3.) Pool & 1mm VLBI (till 28.3.), Semana Santa
14 2.-9.4. S.Trevino
15 9.-16.4. A.Sievers, C.Kramer 12.-18.4. GISMO-Pool (10./11. PC meeting)
16 16.-23.4. I.Hermelo, C.Kramer -18.4. GISMO-Pool
17 23.-30.4. M.Gonzalez GISMO-Pool
18 30.4.-7.5. S.Trevino
19 7.-14.5. I.Hermelo the road should be open again soon
20 14.-21.5. M.Ruiz NIKA: exchange of arrays and electronics, 3mm VLBI (16.-22.5.)
21 21.-28.5. G.Paubert
22 28.-4.6. I. Hermelo Start of Summer Semester
23 4.-11.6. S. Trevino
24 11.-18.6. N.Billot NIKA run
25 18.-25.6. A.Sievers
26 25.6.-2.7. S. Trevino (25.6-27.6), I. Hermelo (27.6-2.7)
27 2.-9.7. I. Hermelo (2.7-4.7) , S. Trevino (4.7-9.7)
28 9.-16.7. M.Gonzalez
29 16.-23.7. N.Billot
30 23.-30.7. G.Paubert
31 30.7.-6.8. I.Hermelo
32 6.-13.8. F.Damour & J.L.Santaren (Operators)
33 13.-20.8. S.Trevino
34 20.-27.8. M.Ruiz & J.Santiago (Operators)
35 27.8.-3.9.
36 3.-10.9. Proposal deadline: 12.9.
37 10.-17.9. Summerschool: 13.-20.9., EMIR warm-up: 19.9.
38 17.-24.9. Heavy Maintenance: 20.-26.
39 24.9.-1.10. M.Ruiz VLBI: 26.-30.9.
40 1.-8.10. S.Trevino
41 8.-15.10. M.Gonzalez Heterodyne pool
42 15.-22.10. A.Sievers Heterodyne pool
43 22.-29.10. I.Hermelo GISMO pool
44 29.10.-5.11. M.Gonzalez GISMO pool
45 5.-12.11.
46 12.-19.11. N.Billot
47 19.-26.11.
48 26.11.-3.12.
49 3.-10.12.
50 10.-17.12. N.Billot
51 17.-24.12.
52 24.-31.12.