|
|
|
|
|
| 1 |
1.-8.1.2013 |
G.Bruni |
|
|
| 2 |
8.-15.1.2013 |
A.Sievers |
|
|
| 3 |
15.-22.1.2013 |
M.Gonzalez |
Pool |
|
| 4 |
22.-29.1.2013 |
N.Billot |
Pool |
|
| 5 |
29.1.-5.2. |
S.Trevino |
|
|
| 6 |
5.-12.2. |
J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2. |
|
|
| 7 |
12.-19.2. |
N.Billot |
Pool, VLBI test on 14. or 18.2. |
|
| 8 |
19.-26.2. |
M.Gonzalez, I.Hermelo (19., 22.-26.2.) |
Pool |
|
| 9 |
26.2.-5.3. |
J.L.Santaren (night-time operator) |
|
|
| 10 |
5.-12.3. |
S.Trevino, I.Hermelo |
|
|
| 11 |
12.-19.3. |
M.Gonzalez |
11.-13. HEMT installation & alignment, 15.-18. J.LeBourlot with students |
|
| 12 |
19.-26.3. |
G.Paubert (19.-22.3.), I.Hermelo (22.-29.3.) |
Pool & 1mm VLBI |
|
| 13 |
26.3.-2.4. |
F.Damour (day-time operator), I.Hermelo (22.-29.3.) |
Pool & 1mm VLBI (till 28.3.), Semana Santa |
|
| 14 |
2.-9.4. |
S.Trevino |
|
|
| 15 |
9.-16.4. |
A.Sievers, C.Kramer 12.-18.4. |
GISMO-Pool (10./11. PC meeting) |
|
| 16 |
16.-23.4. |
I.Hermelo, C.Kramer -18.4. |
GISMO-Pool |
|
| 17 |
23.-30.4. |
M.Gonzalez |
GISMO-Pool |
|
| 18 |
30.4.-7.5. |
S.Trevino |
|
|
| 19 |
7.-14.5. |
I.Hermelo |
the road should be open again soon |
|
| 20 |
14.-21.5. |
M.Ruiz |
NIKA: exchange of arrays and electronics, 3mm VLBI (16.-22.5.) |
|
| 21 |
21.-28.5. |
G.Paubert |
|
|
| 22 |
28.-4.6. |
I.Hermelo |
Start of Summer Semester |
|
| 23 |
4.-11.6. |
S.Trevino |
|
|
| 24 |
11.-18.6. |
N.Billot |
NIKA run |
|
| 25 |
18.-25.6. |
|
|
|