1 1.-8.1.2013 G.Bruni
2 8.-15.1.2013 A.Sievers
3 15.-22.1.2013 M.Gonzalez Pool
4 22.-29.1.2013 N.Billot Pool
5 29.1.-5.2. S.Trevino
6 5.-12.2. G.Bruni
7 12.-19.2. M.Gonzalez Pool
8 19.-26.2. N.Billot Pool
9 26.2.-5.3. J.L.Santaren/M.Ruiz (operators)
10 5.-12.3. S.Trevino
11 12.-19.3. G.Bruni (weekend: M.Gonzalez) 15.-18. J.LeBourlot with students
12 19.-26.3. G.Paubert Pool & 1mm VLBI 21.-28.3.
13 26.3.-2.4. F.Damour (day-time operator) Pool & 1mm VLBI (till 28.3.), Semana Santa
14 2.-9.4. S.Trevino
15 9.-16.4. A.Sievers GISMO-Pool (10./11. PC meeting)
16 16.-23.4. C.Kramer GISMO-Pool
17 23.-30.4. G.Bruni GISMO-Pool
18 30.4.-7.5.
19 7.-14.5.
20 14.-21.5. 3mm VLBI (16.-22.5.)
21 21.-28.5.
22 28.-4.6. Start of Summer Semester

Old AoD Plans: