Differences between revisions 972 and 1023 (spanning 51 versions)
Revision 972 as of 2016-06-19 09:10:29
Size: 2524
Comment:
Revision 1023 as of 2017-01-12 07:56:04
Size: 1616
Editor: PabloMellado
Comment: Notifications are not working
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
##language:en ## page was renamed from AstronomerOnDutySchedule
#language:en
Line 3: Line 4:

= 2017 =
Line 7: Line 10:
1; 5.-12.1.; J.L.Santaren/M.Ruiz (Operators);;
2; 12.-19.1.; C.Marka; Heterodyne pool, Short NIKA2 tests ;;
3; 19.-26.1.; N.Billot; NIKA2 test run 3 ;;
4; 26.1.-2.2.; A.Sievers; NIKA2 test run 3 ;;
5; 2.-9.2.; G.Paubert (partially from Granada);;;
6; 9.-16.2.; C.Marka;;;
7; 16.-23.2.; J.L.Santaren/M.Ruiz (Operators) + P.Garcia (16.-18.2.); ;;
8; 23.2.-1.3.; C.Marka + P.Garcia (23.-25.2.); Heterodyne Pool;;
9; 1.-8.3.; A.Sievers/P.Garcia; NIKA2 run 4 + het observations;;
10; 8.-15.3.; F.Damour/J.L.Santaren (Operators); NIKA2 run 4 + het observations;;
11; 15.-22.3.; G.Paubert (15.-18.3.), P.Garcia (17.-22.3.); Proposal deadline: 17-March;;
12; 22.-29.3.; C.Marka;;;
13; 29.3.-5.4.; N.Billot; Diverticimes filming;;
14; 5.-12.4.; P.Garcia + F.Damour/M.Ruiz (Operators);;;
15; 12.-19.4.; H.Ungerechts (from Granada);;;
16; 19.-26.4.; C.Marka; PC Meeting 19./20. April;;
17; 26.4.-3.5.; G.Paubert (from Granada) ;;;
18; 3.-10.5.; P.Garcia;;
19; 10.-17.5.; C.Marka; possible 0.8mm tests 13.5.;
20; 17.-24.5.; A.Sievers (from Granada); GMVA 20./21., possible 0.8mm test 23.5.;
21; 24.-31.5.; F.Damour & J.L.Santaren (Operators);;
22; 31.5.-7.6.; P.Garcia;;
23; 7.-14.6.; G.Paubert (partly from Granada); 044-16 starting;
24; 14.-21.6.; C.Marka;;
25; 21.-28.6.; H.Ungerechts (from Granada);;
26; 28.6.-5.7.; C.Marka;;
27; 5.-12.7.; P.Garcia; Pool Week 1;
28; 12.-19.7.; G.Paubert (partly from Granada); 043-16 XPOL;
29; 19.-26.7.; A.Sievers (from Granada);;
30; 26.7.-2.8.; C.Marka; Pool Week 2;
31; 2.-9.8.; P.Garcia;;
32; 9.-16.8.; F.Damour & J.L.Santaren (Operators);;;
33; 16.-23.8.; H.Ungerechts (from Granada);;;
34; 23.-30.8.; P.Garcia (23.-26.8.), M.Ruiz (day-time operator 26.-30.8.);;;
35; 30.8.-6.9.; C.Marka;;;
36; 6.-13.9.; G.Paubert (from Granada); ;;
37; 13.-20.9.; H.Ungerechts (from Granada); Proposal Deadline on 15.9., NIKA2 upgrade: 16-19.9.;
38; 20.-27.9.; A.Sievers; NIKA2 short tests ;;
39; 27.9.-4.10.; Operators; Heavy Maintenance 26-29.9. (Mon-Fri), GMVA 29.9.-3.10.;;
40; 4.-11.10.; P.Garcia; NIKA2 commissioning continued;;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week;
2; 10.-17.1.; G.Paubert (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot;
4; 24.-31.1.; P.Garcia; 6hours NIKA2 slot, possible 4hours 1mm VLBI slots;
5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot;
6; 7.-14.2.; H.Ungerechts (remote from Granada); 10.2.: 0.8mm VLBI test slot;
7; 14.-21.2.; P.Torne; 15.2.: 0.8mm VLBI test slot;
8; 21.-28.2.; P.Garcia / A.Ritacco; NIKA2 commissioning week;
9; 28.2.-7.3.;G.Paubert (remote from Granada);;
10; 7.-14.3.;C.Marka/ A.Ritacco; 11.-13.3. A.Maury+Students;
11; 14.-21.3.;A.Sievers (remote from Granada); 16.3. IRAM Proposal Deadline;
12; 21.-28.3.;P.Garcia;;
13; 28.3.-4.4.; P.Torne; 30.3.-4.4. VLBI/GMVA 3mm Session;
14; 4.-11.4.; C.Marka / A.Ritacco; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
15; 11.-18.4.; P.Torne; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
16; 18.-25.4.;;;
17; 25.4.-2.5.;;;
18; 2.-9.5.;;;
19; 9.-16.5.;;;
20; 16.-23.5.;;;
21; 23.-30.5.;; End of winter semester W16;
22; 30.5.-6.6.;;;
Line 50: Line 35:
 * AodSchedule16

2017

1 3.-10.1. P.Torne Heterodyne Pool Week
2 10.-17.1. G.Paubert (remote from Granada)
3 17.-24.1. A.Sievers Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot
4 24.-31.1. P.Garcia 6hours NIKA2 slot, possible 4hours 1mm VLBI slots
5 31.1.-7.2. C.Marka Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot
6 7.-14.2. H.Ungerechts (remote from Granada) 10.2.: 0.8mm VLBI test slot
7 14.-21.2. P.Torne 15.2.: 0.8mm VLBI test slot
8 21.-28.2. P.Garcia / A.Ritacco NIKA2 commissioning week
9 28.2.-7.3. G.Paubert (remote from Granada)
10 7.-14.3. C.Marka/ A.Ritacco 11.-13.3. A.Maury+Students
11 14.-21.3. A.Sievers (remote from Granada) 16.3. IRAM Proposal Deadline
12 21.-28.3. P.Garcia
13 28.3.-4.4. P.Torne 30.3.-4.4. VLBI/GMVA 3mm Session
14 4.-11.4. C.Marka / A.Ritacco 5.-14.4.: VLBI/EHT 1mm Session and Pool
15 11.-18.4. P.Torne 5.-14.4.: VLBI/EHT 1mm Session and Pool
16 18.-25.4.
17 25.4.-2.5.
18 2.-9.5.
19 9.-16.5.
20 16.-23.5.
21 23.-30.5. End of winter semester W16
22 30.5.-6.6.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)