Differences between revisions 930 and 996 (spanning 66 versions)
Revision 930 as of 2015-12-04 10:28:32
Size: 3848
Comment:
Revision 996 as of 2016-11-23 08:43:21
Size: 3269
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
1; 30.12.-6.1.; I.Hermelo;;
2; 6.-13.1.; C.Marka; Heterodyne Pool ;
3; 13.-20.1.; G.Paubert; Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?);
4; 20.-27.1.; M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.);
5; 27.1.-3.2.; N.Billot; NIKA Pool;
6; 3.-10.2.; I.Hermelo; NIKA Pool;
7; 10.-17.2.; A.Sievers; NIKA Polarimetry test run;
8; 17.-24.2.; N.Billot;;
9; 24.2.-3.3.; I.Hermelo; GISMO Pool;
10; 3.-10.3.; G.Paubert; Pulsar observations;
11; 10.-17.3.; C.Marka; IRAM Deadline on 12-Mar;
12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI);
13; 24.-31.3.; C.Marka; Heterodyne Pool(flexible 1mm VLBI);
14; 31.3.-7.4.; H.Ungerechts (from Granada);;
15; 7.-14.4.; G.Paubert (from Granada); Installation of new optics;
16; 14.-21.4.; A.Sievers; Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.);
17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations;
18; 28.4.-5.5.; I.Hermelo;;
19; 5.-12.5.; N.Billot;;
20; 12.-19.5.; G.Paubert (partially from Granada); 14-May: Visit of 20 students from Nijmegen;
21; 19.-26.5.; C.Kramer (19.-22.5.), F.Damour/J.Santiago (Operators, 22.-26.5.); Holography 18.-22.5.;
22; 26.5.-2.6.; C.Marka;;
23; 2.6.-9.6.; H.Ungerechts (from Granada);;
24; 9.6.-16.6.; J.Santiago/F.Damour (Operators);;
25; 16.6.-23.6.; I.Hermelo;;
26; 23.6.-30.6.; C.Kramer (23.-26.6.), C.Marka (26.-30.6.); 22.-26.6. Heavy Maintenance: Secondary, Holography;
27; 30.6.-7.7.; N.Billot ; ;
28; 7.7.-14.7.; A.Sievers (from Granada); 11.7.: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel ;
29; 14.7.-21.7.; I.Hermelo (14.-18.7), S.Trevino (18.-20.7.), G.Paubert (20.-25.7.); 18.7.: visit IRAM-OSN ;
30; 21.7.-28.7.; G.Paubert (20.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.); VESPA Polarimetry;
31; 28.7.-4.8.; C.Marka; Heterodyne Pool;
32; 4.8.-11.8.; J.L.Santaren (night time Operator); 8.8.: visit IRAM-OSN;
33; 11.8.-18.8.; I.Hermelo; 12/13.8. Installation of M4N/M5N, 15.8.: visit IRAM-OSN;
34; 18.8.-25.8.; A.Sievers;;
35; 25.8.-1.9.; C.Marka;;
36; 1.-8.9.; H.Ungerechts (from Granada);;
37; 8.-15.9.; N.Billot; 11.-18.9. Summerschool;
38; 15.-22.9.; G.Paubert; 11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline;
39; 22.-29.9.; M.Ruiz (night-time: 22.-25.9., then day-time); 3mm VLBI;
40; 29.9.-6.10.; Operators; NIKA2 Installation;
41; 6.-13.10; I. Hermelo (6.-9.10.), N.Billot (9.-10.10.), C.Marka (10.-13.10.); Heterodyne Pool (NIKA2 cooling down);
42; 13.-20.10.; I.Hermelo; Part-time: NIKA2 testing;
43; 20.-27.10.; A.Sievers;Part-time: NIKA2 testing;
44; 27.10.-3.11.; C.Kramer;Part-time: NIKA2 testing;
45; 3.-10.11.; C.Marka; ;
46; 10.-17.11.; G.Paubert;;
47; 17.-24.11.; N.Billot;;
48; 24.11.-1.12.; J.Santiago/F.Damour (Operators); EMIR upgrade;
49; 1.-8.12.; C.Marka; EMIR commissioning (CM, IH, AS, CK), Start of Wintersemester 2015/16;
50; 8.-15.12.; I.Hermelo;;
51; 15.-22.12.; G.Paubert (partially remote from Granada);;
52; 22.-29.12.; Support is provided partially remotely from Granada: H.Ungerechts (22.-24.12.), F.Damour/I.Ruiz (Operators, 25.12.), H.Ungerechts (26.12.), C.Marka (27.-28.12.);;
53; 29.12.-5.1.; C.Marka;;
Line 61: Line 8:
2; 12.-19.1.; C.Marka; Hetrodyne pool ;; 2; 12.-19.1.; C.Marka; Heterodyne pool, Short NIKA2 tests ;;
Line 63: Line 10:
4; 26.1.-2.2.; I.Hermelo; NIKA2 test run 3 ;; 4; 26.1.-2.2.; A.Sievers; NIKA2 test run 3 ;;
5; 2.-9.2.; G.Paubert (partially from Granada);;;
6; 9.-16.2.; C.Marka;;;
7; 16.-23.2.; J.L.Santaren/M.Ruiz (Operators) + P.Garcia (16.-18.2.); ;;
8; 23.2.-1.3.; C.Marka + P.Garcia (23.-25.2.); Heterodyne Pool;;
9; 1.-8.3.; A.Sievers/P.Garcia; NIKA2 run 4 + het observations;;
10; 8.-15.3.; F.Damour/J.L.Santaren (Operators); NIKA2 run 4 + het observations;;
11; 15.-22.3.; G.Paubert (15.-18.3.), P.Garcia (17.-22.3.); Proposal deadline: 17-March;;
12; 22.-29.3.; C.Marka;;;
13; 29.3.-5.4.; N.Billot; Diverticimes filming;;
14; 5.-12.4.; P.Garcia + F.Damour/M.Ruiz (Operators);;;
15; 12.-19.4.; H.Ungerechts (from Granada);;;
16; 19.-26.4.; C.Marka; PC Meeting 19./20. April;;
17; 26.4.-3.5.; G.Paubert (from Granada) ;;;
18; 3.-10.5.; P.Garcia;;
19; 10.-17.5.; C.Marka; possible 0.8mm tests 13.5.;
20; 17.-24.5.; A.Sievers (from Granada); GMVA 20./21., possible 0.8mm test 23.5.;
21; 24.-31.5.; F.Damour & J.L.Santaren (Operators);;
22; 31.5.-7.6.; P.Garcia;;
23; 7.-14.6.; G.Paubert (partly from Granada); 044-16 starting;
24; 14.-21.6.; C.Marka;;
25; 21.-28.6.; H.Ungerechts (from Granada);;
26; 28.6.-5.7.; C.Marka;;
27; 5.-12.7.; P.Garcia; Pool Week 1;
28; 12.-19.7.; G.Paubert (partly from Granada); XPOL-Tests 18/19.7.;
29; 19.-26.7.; A.Sievers (from Granada);;
30; 26.7.-2.8.; C.Marka; Pool Week 2;
31; 2.-9.8.; P.Garcia;;
32; 9.-16.8.; F.Damour & J.L.Santaren (Operators);;;
33; 16.-23.8.; H.Ungerechts (from Granada);;;
34; 23.-30.8.; C.Kramer (23.-25.8.), M.Ruiz (day-time operator); ;;
35; 30.8.-6.9.; C.Marka;;;
36; 6.-13.9.; G.Paubert (from Granada); ;;
37; 13.-20.9.; H.Ungerechts (from Granada); Proposal Deadline on 15.9., NIKA2 upgrade: 16-19.9.;
38; 20.-27.9.; A.Sievers; NIKA2 short tests ;;
39; 27.9.-4.10.; Operators; Heavy Maintenance 26-29.9. (Mon-Fri), GMVA 29.9.-3.10.;;
40; 4.-11.10.; S.Leclercq; NIKA2 Commissioning Week #1;;
41; 11.-18.10.; J.Santiago/M.Ruiz (Operators); Holography (11.-14.10.);;
42; 18.-25.10.; C.Marka & P.Torne; Heterodyne Pool Week #3;;
43; 25.10.-1.11; A.Sievers; NIKA2 Commissioning Week #2;;
44; 1.-8.11.; M.Ruiz/J.Santiago (Operators), P.Torne (1.-4.11.); 30m-Workshop on 3/4-Nov ; Experienced observers;
45; 8.-15.11.; G.Paubert (part. from Granada);;;
46; 15.-22.11.; A.Sievers (part. from Granada) ; mrt-cal tests;;
47; 22.-29.11; C.Marka & P.Torne; Heterodyne Pool Week #4;;
48; 29.11.-6.12; J.Santiago/J.L.Santaren (Operators);;;
49; 6.-13.12.; A.Sievers (part. from Granada); NIKA2 Commissioning week #3;;
50; 13.-20.12.; H.Ungerechts (from Granada);;;
51; 20.-27.12.; C.Marka;;;
52; 27.12.-3.1.; P.Garcia;;;
Line 67: Line 62:
 * AodSchedule16

1 5.-12.1. J.L.Santaren/M.Ruiz (Operators)
2 12.-19.1. C.Marka Heterodyne pool, Short NIKA2 tests
3 19.-26.1. N.Billot NIKA2 test run 3
4 26.1.-2.2. A.Sievers NIKA2 test run 3
5 2.-9.2. G.Paubert (partially from Granada)
6 9.-16.2. C.Marka
7 16.-23.2. J.L.Santaren/M.Ruiz (Operators) + P.Garcia (16.-18.2.)
8 23.2.-1.3. C.Marka + P.Garcia (23.-25.2.) Heterodyne Pool
9 1.-8.3. A.Sievers/P.Garcia NIKA2 run 4 + het observations
10 8.-15.3. F.Damour/J.L.Santaren (Operators) NIKA2 run 4 + het observations
11 15.-22.3. G.Paubert (15.-18.3.), P.Garcia (17.-22.3.) Proposal deadline: 17-March
12 22.-29.3. C.Marka
13 29.3.-5.4. N.Billot Diverticimes filming
14 5.-12.4. P.Garcia + F.Damour/M.Ruiz (Operators)
15 12.-19.4. H.Ungerechts (from Granada)
16 19.-26.4. C.Marka PC Meeting 19./20. April
17 26.4.-3.5. G.Paubert (from Granada)
18 3.-10.5. P.Garcia
19 10.-17.5. C.Marka possible 0.8mm tests 13.5.
20 17.-24.5. A.Sievers (from Granada) GMVA 20./21., possible 0.8mm test 23.5.
21 24.-31.5. F.Damour & J.L.Santaren (Operators)
22 31.5.-7.6. P.Garcia
23 7.-14.6. G.Paubert (partly from Granada) 044-16 starting
24 14.-21.6. C.Marka
25 21.-28.6. H.Ungerechts (from Granada)
26 28.6.-5.7. C.Marka
27 5.-12.7. P.Garcia Pool Week 1
28 12.-19.7. G.Paubert (partly from Granada) XPOL-Tests 18/19.7.
29 19.-26.7. A.Sievers (from Granada)
30 26.7.-2.8. C.Marka Pool Week 2
31 2.-9.8. P.Garcia
32 9.-16.8. F.Damour & J.L.Santaren (Operators)
33 16.-23.8. H.Ungerechts (from Granada)
34 23.-30.8. C.Kramer (23.-25.8.), M.Ruiz (day-time operator)
35 30.8.-6.9. C.Marka
36 6.-13.9. G.Paubert (from Granada)
37 13.-20.9. H.Ungerechts (from Granada) Proposal Deadline on 15.9., NIKA2 upgrade: 16-19.9.
38 20.-27.9. A.Sievers NIKA2 short tests
39 27.9.-4.10. Operators Heavy Maintenance 26-29.9. (Mon-Fri), GMVA 29.9.-3.10.
40 4.-11.10. S.Leclercq NIKA2 Commissioning Week #1
41 11.-18.10. J.Santiago/M.Ruiz (Operators) Holography (11.-14.10.)
42 18.-25.10. C.Marka & P.Torne Heterodyne Pool Week #3
43 25.10.-1.11 A.Sievers NIKA2 Commissioning Week #2
44 1.-8.11. M.Ruiz/J.Santiago (Operators), P.Torne (1.-4.11.) 30m-Workshop on 3/4-Nov Experienced observers
45 8.-15.11. G.Paubert (part. from Granada)
46 15.-22.11. A.Sievers (part. from Granada) mrt-cal tests
47 22.-29.11 C.Marka & P.Torne Heterodyne Pool Week #4
48 29.11.-6.12 J.Santiago/J.L.Santaren (Operators)
49 6.-13.12. A.Sievers (part. from Granada) NIKA2 Commissioning week #3
50 13.-20.12. H.Ungerechts (from Granada)
51 20.-27.12. C.Marka
52 27.12.-3.1. P.Garcia

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)