Differences between revisions 930 and 931
Revision 930 as of 2015-12-04 10:28:32
Size: 3848
Comment:
Revision 931 as of 2015-12-04 10:29:45
Size: 613
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
1; 30.12.-6.1.; I.Hermelo;;
2; 6.-13.1.; C.Marka; Heterodyne Pool ;
3; 13.-20.1.; G.Paubert; Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?);
4; 20.-27.1.; M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.);
5; 27.1.-3.2.; N.Billot; NIKA Pool;
6; 3.-10.2.; I.Hermelo; NIKA Pool;
7; 10.-17.2.; A.Sievers; NIKA Polarimetry test run;
8; 17.-24.2.; N.Billot;;
9; 24.2.-3.3.; I.Hermelo; GISMO Pool;
10; 3.-10.3.; G.Paubert; Pulsar observations;
11; 10.-17.3.; C.Marka; IRAM Deadline on 12-Mar;
12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI);
13; 24.-31.3.; C.Marka; Heterodyne Pool(flexible 1mm VLBI);
14; 31.3.-7.4.; H.Ungerechts (from Granada);;
15; 7.-14.4.; G.Paubert (from Granada); Installation of new optics;
16; 14.-21.4.; A.Sievers; Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.);
17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations;
18; 28.4.-5.5.; I.Hermelo;;
19; 5.-12.5.; N.Billot;;
20; 12.-19.5.; G.Paubert (partially from Granada); 14-May: Visit of 20 students from Nijmegen;
21; 19.-26.5.; C.Kramer (19.-22.5.), F.Damour/J.Santiago (Operators, 22.-26.5.); Holography 18.-22.5.;
22; 26.5.-2.6.; C.Marka;;
23; 2.6.-9.6.; H.Ungerechts (from Granada);;
24; 9.6.-16.6.; J.Santiago/F.Damour (Operators);;
25; 16.6.-23.6.; I.Hermelo;;
26; 23.6.-30.6.; C.Kramer (23.-26.6.), C.Marka (26.-30.6.); 22.-26.6. Heavy Maintenance: Secondary, Holography;
27; 30.6.-7.7.; N.Billot ; ;
28; 7.7.-14.7.; A.Sievers (from Granada); 11.7.: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel ;
29; 14.7.-21.7.; I.Hermelo (14.-18.7), S.Trevino (18.-20.7.), G.Paubert (20.-25.7.); 18.7.: visit IRAM-OSN ;
30; 21.7.-28.7.; G.Paubert (20.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.); VESPA Polarimetry;
31; 28.7.-4.8.; C.Marka; Heterodyne Pool;
32; 4.8.-11.8.; J.L.Santaren (night time Operator); 8.8.: visit IRAM-OSN;
33; 11.8.-18.8.; I.Hermelo; 12/13.8. Installation of M4N/M5N, 15.8.: visit IRAM-OSN;
34; 18.8.-25.8.; A.Sievers;;
35; 25.8.-1.9.; C.Marka;;
36; 1.-8.9.; H.Ungerechts (from Granada);;
37; 8.-15.9.; N.Billot; 11.-18.9. Summerschool;
38; 15.-22.9.; G.Paubert; 11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline;
39; 22.-29.9.; M.Ruiz (night-time: 22.-25.9., then day-time); 3mm VLBI;
40; 29.9.-6.10.; Operators; NIKA2 Installation;
41; 6.-13.10; I. Hermelo (6.-9.10.), N.Billot (9.-10.10.), C.Marka (10.-13.10.); Heterodyne Pool (NIKA2 cooling down);
42; 13.-20.10.; I.Hermelo; Part-time: NIKA2 testing;
43; 20.-27.10.; A.Sievers;Part-time: NIKA2 testing;
44; 27.10.-3.11.; C.Kramer;Part-time: NIKA2 testing;
45; 3.-10.11.; C.Marka; ;
46; 10.-17.11.; G.Paubert;;
47; 17.-24.11.; N.Billot;;
48; 24.11.-1.12.; J.Santiago/F.Damour (Operators); EMIR upgrade;
49; 1.-8.12.; C.Marka; EMIR commissioning (CM, IH, AS, CK), Start of Wintersemester 2015/16;
50; 8.-15.12.; I.Hermelo;;
51; 15.-22.12.; G.Paubert (partially remote from Granada);;
52; 22.-29.12.; Support is provided partially remotely from Granada: H.Ungerechts (22.-24.12.), F.Damour/I.Ruiz (Operators, 25.12.), H.Ungerechts (26.12.), C.Marka (27.-28.12.);;
53; 29.12.-5.1.; C.Marka;;

1 5.-12.1. J.L.Santaren/M.Ruiz (Operators)
2 12.-19.1. C.Marka Hetrodyne pool
3 19.-26.1. N.Billot NIKA2 test run 3
4 26.1.-2.2. I.Hermelo NIKA2 test run 3

Old AoD Plans: