Differences between revisions 930 and 1022 (spanning 92 versions)
Revision 930 as of 2015-12-04 10:28:32
Size: 3848
Comment:
Revision 1022 as of 2017-01-11 08:55:37
Size: 1565
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
##language:en #language:en
Line 3: Line 3:

= 2017 =
Line 7: Line 9:
1; 30.12.-6.1.; I.Hermelo;;
2; 6.-13.1.; C.Marka; Heterodyne Pool ;
3; 13.-20.1.; G.Paubert; Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?);
4; 20.-27.1.; M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.);
5; 27.1.-3.2.; N.Billot; NIKA Pool;
6; 3.-10.2.; I.Hermelo; NIKA Pool;
7; 10.-17.2.; A.Sievers; NIKA Polarimetry test run;
8; 17.-24.2.; N.Billot;;
9; 24.2.-3.3.; I.Hermelo; GISMO Pool;
10; 3.-10.3.; G.Paubert; Pulsar observations;
11; 10.-17.3.; C.Marka; IRAM Deadline on 12-Mar;
12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI);
13; 24.-31.3.; C.Marka; Heterodyne Pool(flexible 1mm VLBI);
14; 31.3.-7.4.; H.Ungerechts (from Granada);;
15; 7.-14.4.; G.Paubert (from Granada); Installation of new optics;
16; 14.-21.4.; A.Sievers; Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.);
17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations;
18; 28.4.-5.5.; I.Hermelo;;
19; 5.-12.5.; N.Billot;;
20; 12.-19.5.; G.Paubert (partially from Granada); 14-May: Visit of 20 students from Nijmegen;
21; 19.-26.5.; C.Kramer (19.-22.5.), F.Damour/J.Santiago (Operators, 22.-26.5.); Holography 18.-22.5.;
22; 26.5.-2.6.; C.Marka;;
23; 2.6.-9.6.; H.Ungerechts (from Granada);;
24; 9.6.-16.6.; J.Santiago/F.Damour (Operators);;
25; 16.6.-23.6.; I.Hermelo;;
26; 23.6.-30.6.; C.Kramer (23.-26.6.), C.Marka (26.-30.6.); 22.-26.6. Heavy Maintenance: Secondary, Holography;
27; 30.6.-7.7.; N.Billot ; ;
28; 7.7.-14.7.; A.Sievers (from Granada); 11.7.: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel ;
29; 14.7.-21.7.; I.Hermelo (14.-18.7), S.Trevino (18.-20.7.), G.Paubert (20.-25.7.); 18.7.: visit IRAM-OSN ;
30; 21.7.-28.7.; G.Paubert (20.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.); VESPA Polarimetry;
31; 28.7.-4.8.; C.Marka; Heterodyne Pool;
32; 4.8.-11.8.; J.L.Santaren (night time Operator); 8.8.: visit IRAM-OSN;
33; 11.8.-18.8.; I.Hermelo; 12/13.8. Installation of M4N/M5N, 15.8.: visit IRAM-OSN;
34; 18.8.-25.8.; A.Sievers;;
35; 25.8.-1.9.; C.Marka;;
36; 1.-8.9.; H.Ungerechts (from Granada);;
37; 8.-15.9.; N.Billot; 11.-18.9. Summerschool;
38; 15.-22.9.; G.Paubert; 11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline;
39; 22.-29.9.; M.Ruiz (night-time: 22.-25.9., then day-time); 3mm VLBI;
40; 29.9.-6.10.; Operators; NIKA2 Installation;
41; 6.-13.10; I. Hermelo (6.-9.10.), N.Billot (9.-10.10.), C.Marka (10.-13.10.); Heterodyne Pool (NIKA2 cooling down);
42; 13.-20.10.; I.Hermelo; Part-time: NIKA2 testing;
43; 20.-27.10.; A.Sievers;Part-time: NIKA2 testing;
44; 27.10.-3.11.; C.Kramer;Part-time: NIKA2 testing;
45; 3.-10.11.; C.Marka; ;
46; 10.-17.11.; G.Paubert;;
47; 17.-24.11.; N.Billot;;
48; 24.11.-1.12.; J.Santiago/F.Damour (Operators); EMIR upgrade;
49; 1.-8.12.; C.Marka; EMIR commissioning (CM, IH, AS, CK), Start of Wintersemester 2015/16;
50; 8.-15.12.; I.Hermelo;;
51; 15.-22.12.; G.Paubert (partially remote from Granada);;
52; 22.-29.12.; Support is provided partially remotely from Granada: H.Ungerechts (22.-24.12.), F.Damour/I.Ruiz (Operators, 25.12.), H.Ungerechts (26.12.), C.Marka (27.-28.12.);;
53; 29.12.-5.1.; C.Marka;;
1; 5.-12.1.; J.L.Santaren/M.Ruiz (Operators);;
2; 12.-19.1.; C.Marka; Hetrodyne pool ;;
3; 19.-26.1.; N.Billot; NIKA2 test run 3 ;;
4; 26.1.-2.2.; I.Hermelo; NIKA2 test run 3 ;;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week;
2; 10.-17.1.; G.Paubert (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot;
4; 24.-31.1.; P.Garcia; 6hours NIKA2 slot, possible 4hours 1mm VLBI slots;
5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot;
6; 7.-14.2.; H.Ungerechts (remote from Granada); 10.2.: 0.8mm VLBI test slot;
7; 14.-21.2.; P.Torne; 15.2.: 0.8mm VLBI test slot;
8; 21.-28.2.; P.Garcia / A.Ritacco; NIKA2 commissioning week;
9; 28.2.-7.3.;G.Paubert (remote from Granada);;
10; 7.-14.3.;C.Marka/ A.Ritacco; 11.-13.3. A.Maury+Students;
11; 14.-21.3.;A.Sievers (remote from Granada); 16.3. IRAM Proposal Deadline;
12; 21.-28.3.;P.Garcia;;
13; 28.3.-4.4.; P.Torne; 30.3.-4.4. VLBI/GMVA 3mm Session;
14; 4.-11.4.; C.Marka / A.Ritacco; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
15; 11.-18.4.; P.Torne; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
16; 18.-25.4.;;;
17; 25.4.-2.5.;;;
18; 2.-9.5.;;;
19; 9.-16.5.;;;
20; 16.-23.5.;;;
21; 23.-30.5.;; End of winter semester W16;
22; 30.5.-6.6.;;;
Line 67: Line 34:
 * AodSchedule16

2017

1 3.-10.1. P.Torne Heterodyne Pool Week
2 10.-17.1. G.Paubert (remote from Granada)
3 17.-24.1. A.Sievers Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot
4 24.-31.1. P.Garcia 6hours NIKA2 slot, possible 4hours 1mm VLBI slots
5 31.1.-7.2. C.Marka Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot
6 7.-14.2. H.Ungerechts (remote from Granada) 10.2.: 0.8mm VLBI test slot
7 14.-21.2. P.Torne 15.2.: 0.8mm VLBI test slot
8 21.-28.2. P.Garcia / A.Ritacco NIKA2 commissioning week
9 28.2.-7.3. G.Paubert (remote from Granada)
10 7.-14.3. C.Marka/ A.Ritacco 11.-13.3. A.Maury+Students
11 14.-21.3. A.Sievers (remote from Granada) 16.3. IRAM Proposal Deadline
12 21.-28.3. P.Garcia
13 28.3.-4.4. P.Torne 30.3.-4.4. VLBI/GMVA 3mm Session
14 4.-11.4. C.Marka / A.Ritacco 5.-14.4.: VLBI/EHT 1mm Session and Pool
15 11.-18.4. P.Torne 5.-14.4.: VLBI/EHT 1mm Session and Pool
16 18.-25.4.
17 25.4.-2.5.
18 2.-9.5.
19 9.-16.5.
20 16.-23.5.
21 23.-30.5. End of winter semester W16
22 30.5.-6.6.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)