Size: 3398
Comment:
|
Size: 1616
Comment: Notifications are not working
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
##language:en | ## page was renamed from AstronomerOnDutySchedule #language:en |
Line 3: | Line 4: |
= 2017 = |
|
Line 7: | Line 10: |
1; 30.12.-6.1.; I.Hermelo;; 2; 6.-13.1.; C.Marka; Heterodyne Pool ; 3; 13.-20.1.; G.Paubert; Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?); 4; 20.-27.1.; M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.); 5; 27.1.-3.2.; N.Billot; NIKA Pool; 6; 3.-10.2.; I.Hermelo; NIKA Pool; 7; 10.-17.2.; A.Sievers; NIKA Polarimetry test run; 8; 17.-24.2.; N.Billot;; 9; 24.2.-3.3.; I.Hermelo; GISMO Pool; 10; 3.-10.3.; G.Paubert; Pulsar observations; 11; 10.-17.3.; C.Marka; IRAM Deadline on 12-Mar; 12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI); 13; 24.-31.3.; C.Marka; Heterodyne Pool(flexible 1mm VLBI); 14; 31.3.-7.4.; H.Ungerechts (from Granada);; 15; 7.-14.4.; G.Paubert (from Granada); Installation of new optics; 16; 14.-21.4.; A.Sievers; Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.); 17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations; 18; 28.4.-5.5.; I.Hermelo;; 19; 5.-12.5.; N.Billot;; 20; 12.-19.5.; G.Paubert (partially from Granada); 14-May: Visit of 20 students from Nijmegen; 21; 19.-26.5.; C.Kramer (19.-22.5.), F.Damour/J.Santiago (Operators, 22.-26.5.); Holography 18.-22.5.; 22; 26.5.-2.6.; C.Marka;; 23; 2.6.-9.6.; H.Ungerechts (from Granada);; 24; 9.6.-16.6.; J.Santiago/F.Damour (Operators);; 25; 16.6.-23.6.; I.Hermelo;; 26; 23.6.-30.6.; C.Kramer (23.-26.6.), C.Marka (26.-30.6.); 22.-26.6. Heavy Maintenance: Secondary, Holography; 27; 30.6.-7.7.; N.Billot ; ; 28; 7.7.-14.7.; A.Sievers (from Granada); 11.7.: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel ; 29; 14.7.-21.7.; I.Hermelo (14.-18.7), S.Trevino (18.-20.7.), G.Paubert (20.-25.7.); 18.7.: visit IRAM-OSN ; 30; 21.7.-28.7.; G.Paubert (20.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.); VESPA Polarimetry; 31; 28.7.-4.8.; C.Marka; Heterodyne Pool; 32; 4.8.-11.8.; J.L.Santaren (night time Operator); 8.8.: visit IRAM-OSN; 33; 11.8.-18.8.; I.Hermelo; 12/13.8. Installation of M4N/M5N, 15.8.: visit IRAM-OSN; 34; 18.8.-25.8.; A.Sievers;; 35; 25.8.-1.9.; C.Marka;; 36; 1.-8.9.; H.Ungerechts (from Granada);; 37; 8.-15.9.; N.Billot; 11.-18.9. Summerschool; 38; 15.-22.9.; G.Paubert; 11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline; 39; 22.-29.9.; M.Ruiz (night-time: 22.-25.9., then day-time); 3mm VLBI; 40; 29.9.-6.10.; Operators; NIKA2 Installation; 41; 6.-13.10; I. Hermelo (6.-9.10.) & C.Marka (9.-13.10.); Heterodyne Pool (NIKA2 cooling down); 42; 13.-20.10.; I.Hermelo; Part-time: NIKA2 testing; 43; 20.-27.10.; A.Sievers;Part-time: NIKA2 testing; 44; 27.10.-3.11.; C.Kramer;Part-time: NIKA2 testing; 45; 3.-10.11.; C.Marka; EMIR-Work: Exchange of E1 mixers and possible upgrade of E0 mixers and optics; 46; 10.-17.11.; N.Billot;; 47; 17.-24.11.;;; 48; 24.11.-1.12.;;; 49; 1.-8.12.;; Start of Wintersemester 2015/16; 50; 8.-15.12.;;; 51; 15.-22.12.;;; 52; 22.-29.12.;;; 53; 29.12.-5.1.;;; 1; 5.-12.1.;;; |
1; 3.-10.1.; P.Torne; Heterodyne Pool Week; 2; 10.-17.1.; G.Paubert (remote from Granada);; 3; 17.-24.1.; A.Sievers; Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot; 4; 24.-31.1.; P.Garcia; 6hours NIKA2 slot, possible 4hours 1mm VLBI slots; 5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot; 6; 7.-14.2.; H.Ungerechts (remote from Granada); 10.2.: 0.8mm VLBI test slot; 7; 14.-21.2.; P.Torne; 15.2.: 0.8mm VLBI test slot; 8; 21.-28.2.; P.Garcia / A.Ritacco; NIKA2 commissioning week; 9; 28.2.-7.3.;G.Paubert (remote from Granada);; 10; 7.-14.3.;C.Marka/ A.Ritacco; 11.-13.3. A.Maury+Students; 11; 14.-21.3.;A.Sievers (remote from Granada); 16.3. IRAM Proposal Deadline; 12; 21.-28.3.;P.Garcia;; 13; 28.3.-4.4.; P.Torne; 30.3.-4.4. VLBI/GMVA 3mm Session; 14; 4.-11.4.; C.Marka / A.Ritacco; 5.-14.4.: VLBI/EHT 1mm Session and Pool; 15; 11.-18.4.; P.Torne; 5.-14.4.: VLBI/EHT 1mm Session and Pool; 16; 18.-25.4.;;; 17; 25.4.-2.5.;;; 18; 2.-9.5.;;; 19; 9.-16.5.;;; 20; 16.-23.5.;;; 21; 23.-30.5.;; End of winter semester W16; 22; 30.5.-6.6.;;; |
Line 64: | Line 35: |
* AodSchedule16 * AodSchedule15 |