Size: 3112
Comment:
|
Size: 3398
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 35: | Line 35: |
29; 14.7.-21.7.; I.Hermelo (14.-18.7), XXX (18.-21.7.); 18.7.: visit IRAM-OSN ; 30; 21.7.-28.7.; G.Paubert (21.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.); VESPA Polarimetry; |
29; 14.7.-21.7.; I.Hermelo (14.-18.7), S.Trevino (18.-20.7.), G.Paubert (20.-25.7.); 18.7.: visit IRAM-OSN ; 30; 21.7.-28.7.; G.Paubert (20.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.); VESPA Polarimetry; |
Line 45: | Line 45: |
39; 22.-29.9.; M.Ruiz; 3mm VLBI; | 39; 22.-29.9.; M.Ruiz (night-time: 22.-25.9., then day-time); 3mm VLBI; |
Line 47: | Line 47: |
41; 6.-13.10; C.Marka; Heterodyne Pool (NIK2 cooling down); 42; 13.-20.10.; A.Sievers; NIKA2 on-sky tests, first light; 43; 20.-27.10.;;; 44; 27.10.-3.11.;;; 45; 3.-10.11.;; ? NIKA2 Commissioning, EMIR Upgrades of E0 & E1 & Commissioning ?; 46; 10.-17.11.;;; |
41; 6.-13.10; I. Hermelo (6.-9.10.) & C.Marka (9.-13.10.); Heterodyne Pool (NIKA2 cooling down); 42; 13.-20.10.; I.Hermelo; Part-time: NIKA2 testing; 43; 20.-27.10.; A.Sievers;Part-time: NIKA2 testing; 44; 27.10.-3.11.; C.Kramer;Part-time: NIKA2 testing; 45; 3.-10.11.; C.Marka; EMIR-Work: Exchange of E1 mixers and possible upgrade of E0 mixers and optics; 46; 10.-17.11.; N.Billot;; |
Line 56: | Line 56: |
50; 8.-15.12.;;; 51; 15.-22.12.;;; 52; 22.-29.12.;;; 53; 29.12.-5.1.;;; 1; 5.-12.1.;;; |
Old AoD Plans: