Line 37: Line 37:
31; 28.7.-4.8.; C.Marka; Het.Pool; 31; 28.7.-4.8.; C.Marka; Heterodyne Pool;
Line 46: Line 46:
40; 29.9.-6.10.; Operators; NIKA-2 Installation;
41; 6.10.-13.10; C.Marka;;
42; 13.10.-20.10.;; NIKA-2 Commissioning;
43; 20.10.-27.10.;; NIKA-2 Commissioning;
40; 29.9.-6.10.; Operators; NIKA2 Installation;
41; 6.10.-13.10; C.Marka; Heterodyne Pool (NIK2 cooling down);
42; 13.10.-20.10.;; NIKA2 on-sky tests, first light;
43; 20.10.-27.10.;;;
44; 27.10.-3.11.;;;
45; 3.-10.11.;; ? EMIR Upgrades of E0 & E1 ?;
46; 10.-17.11.;;;
47; 17.-24.11.;;;
48; 24.11.-1.12.;;;
49; 1.-8.12.;; Start of Wintersemester 2015/16;

1 30.12.-6.1. I.Hermelo
2 6.-13.1. C.Marka Heterodyne Pool
3 13.-20.1. G.Paubert Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?)
4 20.-27.1. M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1) NIKA prep. time (T21, 23-25.2.)
5 27.1.-3.2. N.Billot NIKA Pool
6 3.-10.2. I.Hermelo NIKA Pool
7 10.-17.2. A.Sievers NIKA Polarimetry test run
8 17.-24.2. N.Billot
9 24.2.-3.3. I.Hermelo GISMO Pool
10 3.-10.3. G.Paubert Pulsar observations
11 10.-17.3. C.Marka IRAM Deadline on 12-Mar
12 17.-24.3. I.Hermelo Heterodyne Pool (flexible 1mm VLBI)
13 24.-31.3. C.Marka Heterodyne Pool(flexible 1mm VLBI)
14 31.3.-7.4. H.Ungerechts (from Granada)
15 7.-14.4. G.Paubert (from Granada) Installation of new optics
16 14.-21.4. A.Sievers Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.)
17 21.-28.4. C.Marka Astronomical commissioning + flexible & internal pool observations
18 28.4.-5.5. I.Hermelo
19 5.-12.5. N.Billot
20 12.-19.5. G.Paubert (partially from Granada) 14-May: Visit of 20 students from Nijmegen
21 19.-26.5. C.Kramer (19.-22.5.), F.Damour/J.Santiago (Operators, 22.-26.5.) Holography 18.-22.5.
22 26.5.-2.6. C.Marka
23 2.6.-9.6. H.Ungerechts (from Granada)
24 9.6.-16.6. J.Santiago/F.Damour (Operators)
25 16.6.-23.6. I.Hermelo
26 23.6.-30.6. C.Kramer (23.-26.6.), C.Marka (26.-30.6.) 22.-26.6. Heavy Maintenance: Secondary, Holography
27 30.6.-7.7. N.Billot
28 7.7.-14.7. A.Sievers (from Granada) 11.7.: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel
29 14.7.-21.7. I.Hermelo 18.7.: visit IRAM-OSN
30 21.7.-28.7. G.Paubert (21.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.) VESPA Polarimetry
31 28.7.-4.8. C.Marka Heterodyne Pool
32 4.8.-11.8. J.L.Santaren (night time Operator) 8.8.: visit IRAM-OSN
33 11.8.-18.8. I.Hermelo 15.8.: visit IRAM-OSN
34 18.8.-25.8. A.Sievers
35 25.8.-1.9. C.Marka
36 1.9.-8.9. H.Ungerechts (from Granada)
37 8.9.-15.9. N.Billot 11.-18.9. Summerschool
38 15.9.-22.9. G.Paubert 11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline
39 22.9.-29.9. M.Ruiz 3mm VLBI
40 29.9.-6.10. Operators NIKA2 Installation
41 6.10.-13.10 C.Marka Heterodyne Pool (NIK2 cooling down)
42 13.10.-20.10. NIKA2 on-sky tests, first light
43 20.10.-27.10.
44 27.10.-3.11.
45 3.-10.11. ? EMIR Upgrades of E0 & E1 ?
46 10.-17.11.
47 17.-24.11.
48 24.11.-1.12.
49 1.-8.12. Start of Wintersemester 2015/16