Size: 2735
Comment:
|
Size: 3020
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 31: | Line 31: |
25; 16.6.-23.6.; I.Hermelo ? (M.Ruiz/I.Ruiz Operators) ;; 26; 23.6.-30.6.; C.Marka (26.-30.6.); 22.-26.6. Heavy Maintenance; |
25; 16.6.-23.6.; I.Hermelo;; 26; 23.6.-30.6.; C.Kramer (23.-26.6.), C.Marka (26.-30.6.); 22.-26.6. Heavy Maintenance: Secondary, Holography; |
Line 36: | Line 36: |
30; 21.7.-28.7.; J.Santiago/F.Damour (Operators);; 31; 28.7.-4.8.; C.Marka;; |
30; 21.7.-28.7.; G.Paubert (21.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.); VESPA Polarimetry; 31; 28.7.-4.8.; C.Marka; Heterodyne Pool; |
Line 46: | Line 46: |
40; 29.9.-6.10.; Operators; NIKA-2 Installation; 41; 6.10.-13.10; C.Marka;; 42; 13.10.-20.10.;; NIKA-2 Commissioning; 43; 20.10.-27.10.;; NIKA-2 Commissioning; |
40; 29.9.-6.10.; Operators; NIKA2 Installation; 41; 6.10.-13.10; C.Marka; Heterodyne Pool (NIK2 cooling down); 42; 13.10.-20.10.;; NIKA2 on-sky tests, first light; 43; 20.10.-27.10.;;; 44; 27.10.-3.11.;;; 45; 3.-10.11.;; ? EMIR Upgrades of E0 & E1 ?; 46; 10.-17.11.;;; 47; 17.-24.11.;;; 48; 24.11.-1.12.;;; 49; 1.-8.12.;; Start of Wintersemester 2015/16; |
Old AoD Plans: