Size: 1925
Comment:
|
Size: 2673
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
4; 20.-27.1.; M.Ruiz & I.Ruiz (operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.); | 4; 20.-27.1.; M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.); |
Line 26: | Line 26: |
20; 12.-19.5.; G.Paubert (from Granada); 14-May: Visit of 20 students from Nijmegen; | 20; 12.-19.5.; G.Paubert (partially from Granada); 14-May: Visit of 20 students from Nijmegen; |
Line 30: | Line 30: |
24; 9.6.-16.6.; J.Santiago/F.Damour (Operators);; 25; 16.6.-23.6.; I.Hermelo; ; 26; 23.6.-30.6.; C.Marka; ; 27; 30.6.-7.7.; N.Billot; ; 28; 7.7.-14.7.; A.Sievers; ; 29; 14.7.-21.7.;;; 30; 21.7.-28.7.;;; |
24; 9.6.-16.6.; I.Hermelo ;; 25; 16.6.-23.6.; M.Ruiz/I.Ruiz (Operators) ;; 26; 23.6.-30.6.; C.Marka (26.-30.6.); 22.-26.6. Heavy Maintenance; 27; 30.6.-7.7.; N.Billot ; ; 28; 7.7.-14.7.; A.Sievers (from Granada); 11.7: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel ; 29; 14.7.-21.7.; I.Hermelo; 18.7: visit IRAM-OSN ; 30; 21.7.-28.7.; J.Santiago/F.Damour (Operators);; 31; 28.7.-4.8.; C.Marka;; 32; 4.8.-11.8.; H.Ungerechts (from Granada); 8.8: visit IRAM-OSN ; 33; 11.8.-18.8.; I.Hermelo; 15.8: visit IRAM-OSN ; 34; 18.8.-25.8.; A.Sievers ;; 35; 25.8.-1.9.; C.Marka;; 36; 1.9.-8.9.; J.Santiago (night-time Operator);; 37; 8.9.-15.9.; N.Billot; 11.-18.9. Summerschool; 38; 15.9.-22.9.; G.Paubert; 11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline; 39; 22.9.-29.9.; M.Ruiz; 3mm VLBI; 40; 29.9.-6.10.; Operators; NIKA-2 Installation; 41; 6.10.-13.10; C.Marka;; 42; ;; NIKA-2 Commissioning; 43; ;; NIKA-2 Commissioning; |
Old AoD Plans: