Differences between revisions 88 and 94 (spanning 6 versions)
Revision 88 as of 2007-09-24 10:10:16
Size: 1033
Editor: visitor11
Comment:
Revision 94 as of 2007-11-06 12:06:31
Size: 823
Editor: visitor6
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
26;26.6.-3.7.;Ungerechts(Tue-Fri) , Damour/Aladro (Fri-Tue);
27;3.7.-10.7.;Paubert (Tue-Fri), Aladro(Fri-Tue);
28;10.7.-17.7.;Ruiz(Tue-Fri), Aladro(Fri-Tue);
29;17.7.-24.7.;Aladro(Tue-Fri), Damour(Fri-Tue);
30;24.7.-31.7.;Ocana;
31;31.7.-7.8.;Ruiz;
32;7.8.-14.8.;Ocana;
33;14.8.-21.8.;Aladro(Tue-Fri), Leon(Fri-Tue);
34;21.8.-28.8.;Ocana (Tue-Fri), Ungerechts(Fri-Tue);
35;28.8.-4.9.;Ungerechts(Tue-Fri), Aladro (Fri-Tue);
36;4.9.-11.9.;Aladro(Tue-Fri), Ruiz (Fri-Tue);
37;11.9.-18.9.;Ocana (Tue-Fri), Ungerechts(Fri-Tue);
38;18.9.-25.9.;Ungerechts(Tue-Fri), Ocana(Fri-Tue);
39;25.9.-2.10.;Wiesemeyer(Tue-Fri), Sievers (Fri-Tue));
40;2.10.-9.10.;Leon; MAMBO pool
40;2.10.-9.10.;Ocana; MAMBO pool
Line 21: Line 7:
42;16.10.-23.10.;Aladro;
43;23.10.-30.10.;;
44;30.10.-6.11.;;
45;6.11.-13.11.;;
42;16.10.-23.10.;Aladro (Tue-Fri), Paubert (Fri-Mon); (Monday-Tuesday 22/23.10: H. Ungerechts)
43;23.10.-30.10.;Wiesemeyer (Tue-Fri), Aladro(Fri-Tue);HERA Pool
44;30.10.-6.11.;Aladro(Tue-Fri), Wiesemeyer(Fri-Tue); GIZMO Installation & HERA Pool
45;6.11.-13.11.;Sievers;GIZMO PI Observing, AoD will be by telephone available in Granada
Line 26: Line 12:
47;20.11.-27.11.;;
48;27.11.-4.12.;;
49;4.12.-11.12.;;
50;11.12.-18.12.;;
51;18.12.-25.12.;;
52;25.12.-1.1.07;;}}}
47;20.11.-27.11.;Wiesemeyer (Tue-Fri), Aladro(+Riquelme) (Fri-Tue); HERA Pool
48;27.11.-4.12.;Ocana?; MAMBO Pool (tentative)
49;4.12.-11.12.;Ungerechts;
50;11.12.-18.12.;Paubert;
51;18.12.-25.12.;Leon? (Tue-Mon); MAMBO Pool (tentative)
52;25.12.-1.1.07;Aladro (Mon-Fri), Riquelme (Fri-Tue);}}}

Week Dates AoD Comments
40 2.10.-9.10. Ocana MAMBO pool
41 9.10.-16.10. Ruiz VLBI
42 16.10.-23.10. Aladro (Tue-Fri), Paubert (Fri-Mon) (Monday-Tuesday 22/23.10: H. Ungerechts)
43 23.10.-30.10. Wiesemeyer (Tue-Fri), Aladro(Fri-Tue) HERA Pool
44 30.10.-6.11. Aladro(Tue-Fri), Wiesemeyer(Fri-Tue) GIZMO Installation & HERA Pool
45 6.11.-13.11. Sievers GIZMO PI Observing, AoD will be by telephone available in Granada
46 13.11.-20.11. Leon MAMBO Pool
47 20.11.-27.11. Wiesemeyer (Tue-Fri), Aladro(+Riquelme) (Fri-Tue) HERA Pool
48 27.11.-4.12. Ocana? MAMBO Pool (tentative)
49 4.12.-11.12. Ungerechts
50 11.12.-18.12. Paubert
51 18.12.-25.12. Leon? (Tue-Mon) MAMBO Pool (tentative)
52 25.12.-1.1.07 Aladro (Mon-Fri), Riquelme (Fri-Tue)

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)