Size: 1884
Comment:
|
Size: 1947
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 24: | Line 24: |
18; 28.4.-5.5.; I. Hermelo;; | 18; 28.4.-5.5.; I.Hermelo;; |
Line 26: | Line 26: |
20; 12.-19.5.; G.Paubert; 14-May: Visit of 20 students from Nijmegen; | 20; 12.-19.5.; G.Paubert (from Granada); 14-May: Visit of 20 students from Nijmegen; |
Line 29: | Line 29: |
23; 2.6.-9.6.; A.Sievers;; 24; 9.6.-16.6.; H.Ungerechts (from Granada);; 25; 16.6.-23.6.; I. Hermelo; NIKA-2 Installation; 26; 23.6.-30.6.;; Heterodyne week; NIKA-2 Cool-down 27; 30.6.-7.7.;; NIKA-2 Tests; 28; 7.7.-14.7.;; NIKA-2 Tests; |
23; 2.6.-9.6.; H.Ungerechts (from Granada);; 24; 9.6.-16.6.; J.Santiago/F.Damour (Operators);; 25; 16.6.-23.6.; I.Hermelo; NIKA-2 Installation; 26; 23.6.-30.6.; C.Marka; Heterodyne week, NIKA-2 Cool-down; 27; 30.6.-7.7.; N.Billot; NIKA-2 Tests; 28; 7.7.-14.7.; A.Sievers; NIKA-2 Tests; |
Old AoD Plans: