Differences between revisions 872 and 955 (spanning 83 versions)
Revision 872 as of 2015-03-09 09:24:16
Size: 1511
Editor: vpn5150
Comment:
Revision 955 as of 2016-05-03 19:28:51
Size: 1866
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
1; 30.12.-6.1.; I.Hermelo;;
2; 6.-13.1.; C.Marka; Heterodyne Pool ;
3; 13.-20.1.; G.Paubert; Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?);
4; 20.-27.1.; M.Ruiz & I.Ruiz (operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.);
5; 27.1.-3.2.; N.Billot; NIKA Pool;
6; 3.-10.2.; I.Hermelo; NIKA Pool;
7; 10.-17.2.; A.Sievers; NIKA Polarimetry test run;
8; 17.-24.2.; N.Billot;;
9; 24.2.-3.3.; I.Hermelo; GISMO Pool;
10; 3.-10.3.; G.Paubert; Pulsar observations;
11; 10.-17.3.; C.Marka; IRAM Deadline on 12-Mar;
12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI);
13; 24.-31.3.; C.Marka; Heterodyne Pool(flexible 1mm VLBI);
14; 31.3.-7.4.; H.Ungerechts (from Granada);;
15; 7.-14.4.; G.Paubert (from Granada); Installation of new optics;
16; 14.-21.4.; A.Sievers; Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.);
17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations;
18; 28.4.-5.5.; I. Hermelo;;
19; 5.-12.5.; N.Billot;;
20; 12.-19.5.; ;;
21; 19.-26.5.; ;;
22; 26.5.-2.6.; ;;
1; 5.-12.1.; J.L.Santaren/M.Ruiz (Operators);;
2; 12.-19.1.; C.Marka; Heterodyne pool, Short NIKA2 tests ;;
3; 19.-26.1.; N.Billot; NIKA2 test run 3 ;;
4; 26.1.-2.2.; A.Sievers; NIKA2 test run 3 ;;
5; 2.-9.2.; G.Paubert (partially from Granada);;;
6; 9.-16.2.; C.Marka;;;
7; 16.-23.2.; J.L.Santaren/M.Ruiz (Operators) + P.Garcia (16.-18.2.); ;;
8; 23.2.-1.3.; C.Marka + P.Garcia (23.-25.2.); Heterodyne Pool;;
9; 1.-8.3.; A.Sievers/P.Garcia; NIKA2 run 4 + het observations;;
10; 8.-15.3.; F.Damour/J.L.Santaren (Operators); NIKA2 run 4 + het observations;;
11; 15.-22.3.; G.Paubert (15.-18.3.), P.Garcia (17.-22.3.); Proposal deadline: 17-March;;
12; 22.-29.3.; C.Marka;;;
13; 29.3.-5.4.; N.Billot; Diverticimes filming;;
14; 5.-12.4.; P.Garcia + F.Damour/M.Ruiz (Operators);;;
15; 12.-19.4.; H.Ungerechts (from Granada);;;
16; 19.-26.4.; C.Marka; PC Meeting 19./20. April;;
17; 26.4.-3.5.; G.Paubert (from Granada) ;;;
18; 3.-10.5.; P.Garcia;;
19; 10.-17.5.; C.Marka; possible 0.8mm tests 13.5.;
20; 17.-24.5.; A.Sievers (from Granada); GMVA 20./21., possible 0.8mm test 23.5.;
21; 24.-31.5.; F.Damour & J.L.Santaren (Operators);;
22; 31.5.-7.6.; P.Garcia;;
23; 7.-14.6.; H.Ungerechts (from Granada);;
24; 14.-21.6.; C.Marka;;
25; 21.-28.6.;;;
26; 28.6.-5.7.; P.Garcia;;
27; 5.-12.7.; C.Marka; Pool Week 1;
28; 12.-19.7.;;;
29; 19.-26.7.;;;
30; 26.7.-2.8.; P.Garcia; Pool Week 2;
31; 2.-9.8.; C.Marka;;
Line 32: Line 41:
 * AodSchedule15

1 5.-12.1. J.L.Santaren/M.Ruiz (Operators)
2 12.-19.1. C.Marka Heterodyne pool, Short NIKA2 tests
3 19.-26.1. N.Billot NIKA2 test run 3
4 26.1.-2.2. A.Sievers NIKA2 test run 3
5 2.-9.2. G.Paubert (partially from Granada)
6 9.-16.2. C.Marka
7 16.-23.2. J.L.Santaren/M.Ruiz (Operators) + P.Garcia (16.-18.2.)
8 23.2.-1.3. C.Marka + P.Garcia (23.-25.2.) Heterodyne Pool
9 1.-8.3. A.Sievers/P.Garcia NIKA2 run 4 + het observations
10 8.-15.3. F.Damour/J.L.Santaren (Operators) NIKA2 run 4 + het observations
11 15.-22.3. G.Paubert (15.-18.3.), P.Garcia (17.-22.3.) Proposal deadline: 17-March
12 22.-29.3. C.Marka
13 29.3.-5.4. N.Billot Diverticimes filming
14 5.-12.4. P.Garcia + F.Damour/M.Ruiz (Operators)
15 12.-19.4. H.Ungerechts (from Granada)
16 19.-26.4. C.Marka PC Meeting 19./20. April
17 26.4.-3.5. G.Paubert (from Granada)
18 3.-10.5. P.Garcia
19 10.-17.5. C.Marka possible 0.8mm tests 13.5.
20 17.-24.5. A.Sievers (from Granada) GMVA 20./21., possible 0.8mm test 23.5.
21 24.-31.5. F.Damour & J.L.Santaren (Operators)
22 31.5.-7.6. P.Garcia
23 7.-14.6. H.Ungerechts (from Granada)
24 14.-21.6. C.Marka
25 21.-28.6.
26 28.6.-5.7. P.Garcia
27 5.-12.7. C.Marka Pool Week 1
28 12.-19.7.
29 19.-26.7.
30 26.7.-2.8. P.Garcia Pool Week 2
31 2.-9.8. C.Marka

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)