Differences between revisions 872 and 932 (spanning 60 versions)
Revision 872 as of 2015-03-09 09:24:16
Size: 1511
Editor: vpn5150
Comment:
Revision 932 as of 2015-12-04 10:38:17
Size: 736
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
1; 30.12.-6.1.; I.Hermelo;;
2; 6.-13.1.; C.Marka; Heterodyne Pool ;
3; 13.-20.1.; G.Paubert; Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?);
4; 20.-27.1.; M.Ruiz & I.Ruiz (operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.);
5; 27.1.-3.2.; N.Billot; NIKA Pool;
6; 3.-10.2.; I.Hermelo; NIKA Pool;
7; 10.-17.2.; A.Sievers; NIKA Polarimetry test run;
8; 17.-24.2.; N.Billot;;
9; 24.2.-3.3.; I.Hermelo; GISMO Pool;
10; 3.-10.3.; G.Paubert; Pulsar observations;
11; 10.-17.3.; C.Marka; IRAM Deadline on 12-Mar;
12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI);
13; 24.-31.3.; C.Marka; Heterodyne Pool(flexible 1mm VLBI);
14; 31.3.-7.4.; H.Ungerechts (from Granada);;
15; 7.-14.4.; G.Paubert (from Granada); Installation of new optics;
16; 14.-21.4.; A.Sievers; Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.);
17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations;
18; 28.4.-5.5.; I. Hermelo;;
19; 5.-12.5.; N.Billot;;
20; 12.-19.5.; ;;
21; 19.-26.5.; ;;
22; 26.5.-2.6.; ;;
1; 5.-12.1.; J.L.Santaren/M.Ruiz (Operators);;
2; 12.-19.1.; C.Marka; Hetrodyne pool, Short NIKA2 tests ;;
3; 19.-26.1.; N.Billot; NIKA2 test run 3 ;;
4; 26.1.-2.2.; A.Sievers; NIKA2 test run 3 ;;
5; 2.-9.2.;;;;
6; 9.-16.2.;;;;
7; 16.-23.2.;;;;
8; 23.2.-1.3.;;;;
9; 1.-8.3.;;;;
10; 8.-15.3.;;;;
Line 32: Line 20:
 * AodSchedule15

1 5.-12.1. J.L.Santaren/M.Ruiz (Operators)
2 12.-19.1. C.Marka Hetrodyne pool, Short NIKA2 tests
3 19.-26.1. N.Billot NIKA2 test run 3
4 26.1.-2.2. A.Sievers NIKA2 test run 3
5 2.-9.2.
6 9.-16.2.
7 16.-23.2.
8 23.2.-1.3.
9 1.-8.3.
10 8.-15.3.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)