Differences between revisions 871 and 998 (spanning 127 versions)
Revision 871 as of 2015-01-29 11:01:26
Size: 1501
Comment:
Revision 998 as of 2016-11-23 08:49:12
Size: 714
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:

= 2017 =
Line 7: Line 9:
1; 30.12.-6.1.; I.Hermelo;;
2; 6.-13.1.; C.Marka; Heterodyne Pool ;
3; 13.-20.1.; G.Paubert; Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?);
4; 20.-27.1.; M.Ruiz & I.Ruiz (operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.);
5; 27.1.-3.2.; N.Billot; NIKA Pool;
6; 3.-10.2.; I.Hermelo; NIKA Pool;
7; 10.-17.2.; A.Sievers; NIKA Polarimetry test run;
8; 17.-24.2.; N.Billot;;
9; 24.2.-3.3.; I.Hermelo; GISMO Pool;
10; 3.-10.3.; G.Paubert; Pulsar observations;
11; 10.-17.3.; C.Marka; IRAM Deadline on 12-Mar;
12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI);
13; 24.-31.3.; C.Marka; Heterodyne Pool(flexible 1mm VLBI);
14; 31.3.-7.4.; H.Ungerechts (from Granada);;
15; 7.-14.4.; G.Paubert (from Granada); Installation of new optics;
16; 14.-21.4.; A.Sievers; Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.);
17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations;
18; 28.4.-5.5.; ;;
19; 5.-12.5.; N.Billot;;
20; 12.-19.5.; ;;
21; 19.-26.5.; ;;
22; 26.5.-2.6.; ;;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week, 4./5. 0.8mm VLBI 30m-NOEMA test slot;
2; 10.-17.1.; H.Ungerechts (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch to mrt-cal ?;
4; 24.-31.1.; P.Garcia; NIKA2 commissioning week ?;
5; 31.1.-7.2.;;;
Line 32: Line 17:
 * AodSchedule16
 * AodSchedule15

2017

1 3.-10.1. P.Torne Heterodyne Pool Week, 4./5. 0.8mm VLBI 30m-NOEMA test slot
2 10.-17.1. H.Ungerechts (remote from Granada)
3 17.-24.1. A.Sievers Switch to mrt-cal ?
4 24.-31.1. P.Garcia NIKA2 commissioning week ?
5 31.1.-7.2.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)