Size: 1501
Comment:
|
Size: 1884
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 18: | Line 18: |
12; 17.-24.3.; S.Trevino; Heterodyne Pool (flexible 1mm VLBI); | 12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI); |
Line 24: | Line 24: |
18; 28.4.-5.5.; ;; | 18; 28.4.-5.5.; I. Hermelo;; |
Line 26: | Line 26: |
20; 12.-19.5.; ;; 21; 19.-26.5.; ;; 22; 26.5.-2.6.; ;; |
20; 12.-19.5.; G.Paubert; 14-May: Visit of 20 students from Nijmegen; 21; 19.-26.5.; F.Damour/J.Santiago (Operators);; 22; 26.5.-2.6.; C.Marka;; 23; 2.6.-9.6.; A.Sievers;; 24; 9.6.-16.6.; H.Ungerechts (from Granada);; 25; 16.6.-23.6.; I. Hermelo; NIKA-2 Installation; 26; 23.6.-30.6.;; Heterodyne week; NIKA-2 Cool-down 27; 30.6.-7.7.;; NIKA-2 Tests; 28; 7.7.-14.7.;; NIKA-2 Tests; 29; 14.7.-21.7.;;; 30; 21.7.-28.7.;;; |
Old AoD Plans: