Differences between revisions 868 and 911 (spanning 43 versions)
Revision 868 as of 2014-12-20 19:19:53
Size: 4552
Comment:
Revision 911 as of 2015-09-07 08:02:20
Size: 3292
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
1; 31.12.-7.1.; J.L.Santaren & F.Damour (Operators, 31.12.-3.1.), G.Paubert (3.1.-7.1.);;
2; 7.-14.1.; M.Gonzalez; Heterodyne Pool;
3; 14.-21.1.; N.Billot; NIKA Cool down;
4; 21.-28.1.; A.Sievers; NIKA tests;
5; 28.1.-4.2.; S.Trevino;;
6; 4.-11.2.; M.Gonzalez (4-7 Feb) and I.Hermelo(7-11 Feb); Heterodyne Pool;
7; 11.18.2.; J.L.Santaren & F.Damour (Operators, 11-14 Feb) and I.Hermelo (14-18 Feb); 13./14.: 8h VLBI;
8; 18.-25.2.; N.Billot; NIKA 1st open pool run (18.-28.2.);
9; 25.2.-4.3.; I.Hermelo; NIKA pool till 28.2.;
10; 4.-11.3.; M.Gonzalez; Heterodyne Pool;
11; 11.-18.3.; A.Sievers (11.-14.3.), G.Paubert (14.-18.3.); Proposal deadline 13.3., Students of J.LeBourlot;
12; 18.-25.3.; S.Trevino;;
13; 25.-1.4.; C.Kramer (-28.3.), N.Billot (28.3.-1.4.);;
14; 1.-8.4.; I.Hermelo; GISMO pool (1.-11.4.);
15; 8.-15.4.; I.Hermelo (8.-11.4.), C.Kramer (11.-15.4.); PC-Meeting 9./10.;
16; 15.-22.4.; S.Trevino (15.-18.4.), M.Ruiz (day-time operator, 18.-22.4.);;
17; 22.-29.4.; A.Sievers (from Granada);;
18; 29.4.-6.5.; N.Billot;;
19; 6.-13.5.; I.Hermelo (6.-9.5.), S.Trevino (9.-12.5.), I.Hermelo (12.-13.5.); NIKA dry runs (7.5., 12.5.);
20; 13.-20.5.; C.Kramer; 1st 24hours holography run (14./15.5.);
21; 20.-27.5.; M.Ruiz (operator);3mm VLBI (22.-28.5.);
22; 27.5.-3.6.; S.Trevino;;
23; 3.-10.6.; M.Gonzalez;;
24; 10.-17.6.; G.Paubert (10.-13.6., 14.-17.6. from Granada);;
25; 17.-24.6.; M.Gonzalez(17.-20), S.Trevino (20.-24);;
26; 24.6.-1.7.; S. Trevino (24.-27.6.), I.Hermelo (27.6.-1.7.);;
27; 1.-8.7.; H. Ungerechts (from Granada);;
28; 8.-15.7.; M.Gonzalez (8.-11.7., 11.-15.7. from Granada);;
29; 15.-22.7.; I.Hermelo;;
30; 22.-29.7.; A.Sievers (22.-24.7., rest from Granada);;
31; 29.7.-5.8.; N.Billot;;
32; 5.-12.8.; F.Damour (night-time operator); J.Pety visiting astronomer;
33; 12.-19.8.; S.Trevino;;
34; 19.-26.8.; I.Hermelo;;
35; 26.8.-2.9.; H.Ungerechts (from Granada);;
36; 2.-9.9.; G.Paubert (from Granada);;
37; 9.-16.9.; S.Trevino (9.-15.9.) + I. Hermelo (15.-16.9) + Claudia Marka; Heterodyne Pool;
38; 16.-23.9.; I.Hermelo (16.-19.9.), J.Santiago (night-time operator); Heavy Maintenance Phase: 19.-25.9.;
39; 23.-30.9.; M.Ruiz + C.Marka; VLBI 3mm 25.-29.9., 2nd holo run 29./30.9.;
40; 30.9.-7.10.; S.Trevino;;
41; 7.-14.10.; A.Sievers ; NIKA test run;
42; 14.-21.10.; C.Kramer (14.-17.10.), G.Paubert (17.-21.10.) + C.Marka; Heterodyne Pool, 20./21.10. PC-Meeting in Grenoble;
43; 21.-28.10.; G.Paubert (21./22.), A.Sievers (22.-28.10.); GISMO 6th Pool;
44; 28.10.-4.11.; J.Santiago (day-time operator) ;;
45; 4.-11.11.; S.Trevino (4.-7.11.), I.Hermelo (7.-11.11.); Heterodyne Pool;
46; 11.-18.11.; N.Billot (11.-17.11.), I.Hermelo (17.-18.11.); NIKA 2nd Pool;
47; 18.-25.11.; I.Hermelo (18.-24.11.), C. Kramer (24.-25.11.); NIKA 2nd Pool (18.-21.11), 3rd holo run (24.11.);
48; 25.11.-2.12.; S.Trevino;;
49; 2.-9.12.; I.Hermelo;;
50; 9.-16.12.; N.Billot;;
51; 16.-23.12.; G.Paubert (15.-19.12.), M.Ruiz & F.Damour (op.);;
52; 23.-30.12.; C.Marka;;
;;;;
Line 63: Line 10:
4; 20.-27.1.; M.Ruiz & I.Ruiz (operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.); 4; 20.-27.1.; M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.);
Line 71: Line 18:
12; 17.-24.3.; S.Trevino; Heterodyne Pool (flexible 1mm VLBI); 12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI);
Line 76: Line 23:
17; 21.-28.4.; C.Marka; Reserve + Astronomical commissioning + flexible & internal pool observations;
18; 28.4.-5.5.; ;;
17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations;
18; 28.4.-5.5.; I.Hermelo;;
Line 79: Line 26:
20; 12.-19.5.; ;;
21; 19.-26.5.; ;;
22; 26.5.-2.6.; ;;
20; 12.-19.5.; G.Paubert (partially from Granada); 14-May: Visit of 20 students from Nijmegen;
21; 19.-26.5.; C.Kramer (19.-22.5.), F.Damour/J.Santiago (Operators, 22.-26.5.); Holography 18.-22.5.;
22; 26.5.-2.6.; C.Marka;;
23; 2.6.-9.6.; H.Ungerechts (from Granada);;
24; 9.6.-16.6.; J.Santiago/F.Damour (Operators);;
25; 16.6.-23.6.; I.Hermelo;;
26; 23.6.-30.6.; C.Kramer (23.-26.6.), C.Marka (26.-30.6.); 22.-26.6. Heavy Maintenance: Secondary, Holography;
27; 30.6.-7.7.; N.Billot ; ;
28; 7.7.-14.7.; A.Sievers (from Granada); 11.7.: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel ;
29; 14.7.-21.7.; I.Hermelo (14.-18.7), S.Trevino (18.-20.7.), G.Paubert (20.-25.7.); 18.7.: visit IRAM-OSN ;
30; 21.7.-28.7.; G.Paubert (20.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.); VESPA Polarimetry;
31; 28.7.-4.8.; C.Marka; Heterodyne Pool;
32; 4.8.-11.8.; J.L.Santaren (night time Operator); 8.8.: visit IRAM-OSN;
33; 11.8.-18.8.; I.Hermelo; 12/13.8. Installation of M4N/M5N, 15.8.: visit IRAM-OSN;
34; 18.8.-25.8.; A.Sievers;;
35; 25.8.-1.9.; C.Marka;;
36; 1.-8.9.; H.Ungerechts (from Granada);;
37; 8.-15.9.; N.Billot; 11.-18.9. Summerschool;
38; 15.-22.9.; G.Paubert; 11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline;
39; 22.-29.9.; M.Ruiz; 3mm VLBI;
40; 29.9.-6.10.; Operators; NIKA2 Installation;
41; 6.-13.10; I. Hermelo (6.-9.10.) & C.Marka (9.-13.10.); Heterodyne Pool (NIKA2 cooling down);
42; 13.-20.10.; I.Hermelo; Part-time: NIKA2 testing;
43; 20.-27.10.; A.Sievers;Part-time: NIKA2 testing;
44; 27.10.-3.11.; N.Billot;Part-time: NIKA2 testing;
45; 3.-10.11.;; EMIR Upgrades of E0(?) & E1;
46; 10.-17.11.;;;
47; 17.-24.11.;;;
48; 24.11.-1.12.;;;
49; 1.-8.12.;; Start of Wintersemester 2015/16;
50; 8.-15.12.;;;
51; 15.-22.12.;;;
52; 22.-29.12.;;;
53; 29.12.-5.1.;;;
1; 5.-12.1.;;;

1 30.12.-6.1. I.Hermelo
2 6.-13.1. C.Marka Heterodyne Pool
3 13.-20.1. G.Paubert Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?)
4 20.-27.1. M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1) NIKA prep. time (T21, 23-25.2.)
5 27.1.-3.2. N.Billot NIKA Pool
6 3.-10.2. I.Hermelo NIKA Pool
7 10.-17.2. A.Sievers NIKA Polarimetry test run
8 17.-24.2. N.Billot
9 24.2.-3.3. I.Hermelo GISMO Pool
10 3.-10.3. G.Paubert Pulsar observations
11 10.-17.3. C.Marka IRAM Deadline on 12-Mar
12 17.-24.3. I.Hermelo Heterodyne Pool (flexible 1mm VLBI)
13 24.-31.3. C.Marka Heterodyne Pool(flexible 1mm VLBI)
14 31.3.-7.4. H.Ungerechts (from Granada)
15 7.-14.4. G.Paubert (from Granada) Installation of new optics
16 14.-21.4. A.Sievers Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.)
17 21.-28.4. C.Marka Astronomical commissioning + flexible & internal pool observations
18 28.4.-5.5. I.Hermelo
19 5.-12.5. N.Billot
20 12.-19.5. G.Paubert (partially from Granada) 14-May: Visit of 20 students from Nijmegen
21 19.-26.5. C.Kramer (19.-22.5.), F.Damour/J.Santiago (Operators, 22.-26.5.) Holography 18.-22.5.
22 26.5.-2.6. C.Marka
23 2.6.-9.6. H.Ungerechts (from Granada)
24 9.6.-16.6. J.Santiago/F.Damour (Operators)
25 16.6.-23.6. I.Hermelo
26 23.6.-30.6. C.Kramer (23.-26.6.), C.Marka (26.-30.6.) 22.-26.6. Heavy Maintenance: Secondary, Holography
27 30.6.-7.7. N.Billot
28 7.7.-14.7. A.Sievers (from Granada) 11.7.: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel
29 14.7.-21.7. I.Hermelo (14.-18.7), S.Trevino (18.-20.7.), G.Paubert (20.-25.7.) 18.7.: visit IRAM-OSN
30 21.7.-28.7. G.Paubert (20.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.) VESPA Polarimetry
31 28.7.-4.8. C.Marka Heterodyne Pool
32 4.8.-11.8. J.L.Santaren (night time Operator) 8.8.: visit IRAM-OSN
33 11.8.-18.8. I.Hermelo 12/13.8. Installation of M4N/M5N, 15.8.: visit IRAM-OSN
34 18.8.-25.8. A.Sievers
35 25.8.-1.9. C.Marka
36 1.-8.9. H.Ungerechts (from Granada)
37 8.-15.9. N.Billot 11.-18.9. Summerschool
38 15.-22.9. G.Paubert 11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline
39 22.-29.9. M.Ruiz 3mm VLBI
40 29.9.-6.10. Operators NIKA2 Installation
41 6.-13.10 I. Hermelo (6.-9.10.) & C.Marka (9.-13.10.) Heterodyne Pool (NIKA2 cooling down)
42 13.-20.10. I.Hermelo Part-time: NIKA2 testing
43 20.-27.10. A.Sievers Part-time: NIKA2 testing
44 27.10.-3.11. N.Billot Part-time: NIKA2 testing
45 3.-10.11. EMIR Upgrades of E0(?) & E1
46 10.-17.11.
47 17.-24.11.
48 24.11.-1.12.
49 1.-8.12. Start of Wintersemester 2015/16
50 8.-15.12.
51 15.-22.12.
52 22.-29.12.
53 29.12.-5.1.
1 5.-12.1.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)