|
Size: 4552
Comment:
|
Size: 3292
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 7: | Line 7: |
| 1; 31.12.-7.1.; J.L.Santaren & F.Damour (Operators, 31.12.-3.1.), G.Paubert (3.1.-7.1.);; 2; 7.-14.1.; M.Gonzalez; Heterodyne Pool; 3; 14.-21.1.; N.Billot; NIKA Cool down; 4; 21.-28.1.; A.Sievers; NIKA tests; 5; 28.1.-4.2.; S.Trevino;; 6; 4.-11.2.; M.Gonzalez (4-7 Feb) and I.Hermelo(7-11 Feb); Heterodyne Pool; 7; 11.18.2.; J.L.Santaren & F.Damour (Operators, 11-14 Feb) and I.Hermelo (14-18 Feb); 13./14.: 8h VLBI; 8; 18.-25.2.; N.Billot; NIKA 1st open pool run (18.-28.2.); 9; 25.2.-4.3.; I.Hermelo; NIKA pool till 28.2.; 10; 4.-11.3.; M.Gonzalez; Heterodyne Pool; 11; 11.-18.3.; A.Sievers (11.-14.3.), G.Paubert (14.-18.3.); Proposal deadline 13.3., Students of J.LeBourlot; 12; 18.-25.3.; S.Trevino;; 13; 25.-1.4.; C.Kramer (-28.3.), N.Billot (28.3.-1.4.);; 14; 1.-8.4.; I.Hermelo; GISMO pool (1.-11.4.); 15; 8.-15.4.; I.Hermelo (8.-11.4.), C.Kramer (11.-15.4.); PC-Meeting 9./10.; 16; 15.-22.4.; S.Trevino (15.-18.4.), M.Ruiz (day-time operator, 18.-22.4.);; 17; 22.-29.4.; A.Sievers (from Granada);; 18; 29.4.-6.5.; N.Billot;; 19; 6.-13.5.; I.Hermelo (6.-9.5.), S.Trevino (9.-12.5.), I.Hermelo (12.-13.5.); NIKA dry runs (7.5., 12.5.); 20; 13.-20.5.; C.Kramer; 1st 24hours holography run (14./15.5.); 21; 20.-27.5.; M.Ruiz (operator);3mm VLBI (22.-28.5.); 22; 27.5.-3.6.; S.Trevino;; 23; 3.-10.6.; M.Gonzalez;; 24; 10.-17.6.; G.Paubert (10.-13.6., 14.-17.6. from Granada);; 25; 17.-24.6.; M.Gonzalez(17.-20), S.Trevino (20.-24);; 26; 24.6.-1.7.; S. Trevino (24.-27.6.), I.Hermelo (27.6.-1.7.);; 27; 1.-8.7.; H. Ungerechts (from Granada);; 28; 8.-15.7.; M.Gonzalez (8.-11.7., 11.-15.7. from Granada);; 29; 15.-22.7.; I.Hermelo;; 30; 22.-29.7.; A.Sievers (22.-24.7., rest from Granada);; 31; 29.7.-5.8.; N.Billot;; 32; 5.-12.8.; F.Damour (night-time operator); J.Pety visiting astronomer; 33; 12.-19.8.; S.Trevino;; 34; 19.-26.8.; I.Hermelo;; 35; 26.8.-2.9.; H.Ungerechts (from Granada);; 36; 2.-9.9.; G.Paubert (from Granada);; 37; 9.-16.9.; S.Trevino (9.-15.9.) + I. Hermelo (15.-16.9) + Claudia Marka; Heterodyne Pool; 38; 16.-23.9.; I.Hermelo (16.-19.9.), J.Santiago (night-time operator); Heavy Maintenance Phase: 19.-25.9.; 39; 23.-30.9.; M.Ruiz + C.Marka; VLBI 3mm 25.-29.9., 2nd holo run 29./30.9.; 40; 30.9.-7.10.; S.Trevino;; 41; 7.-14.10.; A.Sievers ; NIKA test run; 42; 14.-21.10.; C.Kramer (14.-17.10.), G.Paubert (17.-21.10.) + C.Marka; Heterodyne Pool, 20./21.10. PC-Meeting in Grenoble; 43; 21.-28.10.; G.Paubert (21./22.), A.Sievers (22.-28.10.); GISMO 6th Pool; 44; 28.10.-4.11.; J.Santiago (day-time operator) ;; 45; 4.-11.11.; S.Trevino (4.-7.11.), I.Hermelo (7.-11.11.); Heterodyne Pool; 46; 11.-18.11.; N.Billot (11.-17.11.), I.Hermelo (17.-18.11.); NIKA 2nd Pool; 47; 18.-25.11.; I.Hermelo (18.-24.11.), C. Kramer (24.-25.11.); NIKA 2nd Pool (18.-21.11), 3rd holo run (24.11.); 48; 25.11.-2.12.; S.Trevino;; 49; 2.-9.12.; I.Hermelo;; 50; 9.-16.12.; N.Billot;; 51; 16.-23.12.; G.Paubert (15.-19.12.), M.Ruiz & F.Damour (op.);; 52; 23.-30.12.; C.Marka;; ;;;; |
|
| Line 63: | Line 10: |
| 4; 20.-27.1.; M.Ruiz & I.Ruiz (operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.); | 4; 20.-27.1.; M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.); |
| Line 71: | Line 18: |
| 12; 17.-24.3.; S.Trevino; Heterodyne Pool (flexible 1mm VLBI); | 12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI); |
| Line 76: | Line 23: |
| 17; 21.-28.4.; C.Marka; Reserve + Astronomical commissioning + flexible & internal pool observations; 18; 28.4.-5.5.; ;; |
17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations; 18; 28.4.-5.5.; I.Hermelo;; |
| Line 79: | Line 26: |
| 20; 12.-19.5.; ;; 21; 19.-26.5.; ;; 22; 26.5.-2.6.; ;; |
20; 12.-19.5.; G.Paubert (partially from Granada); 14-May: Visit of 20 students from Nijmegen; 21; 19.-26.5.; C.Kramer (19.-22.5.), F.Damour/J.Santiago (Operators, 22.-26.5.); Holography 18.-22.5.; 22; 26.5.-2.6.; C.Marka;; 23; 2.6.-9.6.; H.Ungerechts (from Granada);; 24; 9.6.-16.6.; J.Santiago/F.Damour (Operators);; 25; 16.6.-23.6.; I.Hermelo;; 26; 23.6.-30.6.; C.Kramer (23.-26.6.), C.Marka (26.-30.6.); 22.-26.6. Heavy Maintenance: Secondary, Holography; 27; 30.6.-7.7.; N.Billot ; ; 28; 7.7.-14.7.; A.Sievers (from Granada); 11.7.: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel ; 29; 14.7.-21.7.; I.Hermelo (14.-18.7), S.Trevino (18.-20.7.), G.Paubert (20.-25.7.); 18.7.: visit IRAM-OSN ; 30; 21.7.-28.7.; G.Paubert (20.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.); VESPA Polarimetry; 31; 28.7.-4.8.; C.Marka; Heterodyne Pool; 32; 4.8.-11.8.; J.L.Santaren (night time Operator); 8.8.: visit IRAM-OSN; 33; 11.8.-18.8.; I.Hermelo; 12/13.8. Installation of M4N/M5N, 15.8.: visit IRAM-OSN; 34; 18.8.-25.8.; A.Sievers;; 35; 25.8.-1.9.; C.Marka;; 36; 1.-8.9.; H.Ungerechts (from Granada);; 37; 8.-15.9.; N.Billot; 11.-18.9. Summerschool; 38; 15.-22.9.; G.Paubert; 11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline; 39; 22.-29.9.; M.Ruiz; 3mm VLBI; 40; 29.9.-6.10.; Operators; NIKA2 Installation; 41; 6.-13.10; I. Hermelo (6.-9.10.) & C.Marka (9.-13.10.); Heterodyne Pool (NIKA2 cooling down); 42; 13.-20.10.; I.Hermelo; Part-time: NIKA2 testing; 43; 20.-27.10.; A.Sievers;Part-time: NIKA2 testing; 44; 27.10.-3.11.; N.Billot;Part-time: NIKA2 testing; 45; 3.-10.11.;; EMIR Upgrades of E0(?) & E1; 46; 10.-17.11.;;; 47; 17.-24.11.;;; 48; 24.11.-1.12.;;; 49; 1.-8.12.;; Start of Wintersemester 2015/16; 50; 8.-15.12.;;; 51; 15.-22.12.;;; 52; 22.-29.12.;;; 53; 29.12.-5.1.;;; 1; 5.-12.1.;;; |
Old AoD Plans:
