Size: 4334
Comment:
|
Size: 4534
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 53: | Line 53: |
47; 18.-25.11.; I.Hermelo (18.-24.11.), C. Kramer (24.-25.11.); NIKA 2nd Pool (18.-21.11), Holography run (24.11.); | 47; 18.-25.11.; I.Hermelo (18.-24.11.), C. Kramer (24.-25.11.); NIKA 2nd Pool (18.-21.11), 3rd holo run (24.11.); |
Line 61: | Line 61: |
2; 6.-13.1.; C.Marka ?; Heterodyne Pool (24h-Holo: Thu/Fri ?); 3; 13.-20.1.; G.Paubert ?; Heterodyne Pool (24h-Holo: Mon/Tues, Thu/Fri ? ); 4; 20.-27.1.; M.Ruiz & I.Ruiz (operators); NIKA prep. time (T21, 23-25.2.); |
2; 6.-13.1.; C.Marka; Heterodyne Pool ; 3; 13.-20.1.; G.Paubert; Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?); 4; 20.-27.1.; M.Ruiz & I.Ruiz (operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.); |
Line 65: | Line 65: |
6; 3.-10.2.; I.Hermelo ?; NIKA Pool; 7; 10.-17.2.; A.Sievers ?; NIKA Polarimetry test run; |
6; 3.-10.2.; I.Hermelo; NIKA Pool; 7; 10.-17.2.; A.Sievers; NIKA Polarimetry test run; |
Line 68: | Line 68: |
9; 24.2.-3.3.; I.Hermelo ?; GISMO Pool; 10; 3.-10.3.; H.Ungerechts (from Granada) ?;; 11; 10.-17.3.; C.Marka ?; IRAM Deadline on 12-Mar; 12; 17.-24.3.; S.Trevino ?; Heterodyne Pool (flexible 1mm VLBI); 13; 24.-31.3.; C.Marka ?; Heterodyne Pool(flexible 1mm VLBI); 14; 31.3.-7.4.; ;; 15; 7.-14.4.; ;; 16; 14.-21.4.; ; PC Meeting on 14/15.4. + 30m visit (16.4.); 17; 21.-28.4.; ;; |
9; 24.2.-3.3.; I.Hermelo; GISMO Pool; 10; 3.-10.3.; G.Paubert; Pulsar observations; 11; 10.-17.3.; C.Marka; IRAM Deadline on 12-Mar; 12; 17.-24.3.; S.Trevino; Heterodyne Pool (flexible 1mm VLBI); 13; 24.-31.3.; C.Marka; Heterodyne Pool(flexible 1mm VLBI); 14; 31.3.-7.4.; H.Ungerechts (from Granada);; 15; 7.-14.4.; G.Paubert (from Granada); Installation of new optics; 16; 14.-21.4.; A.Sievers; Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.); 17; 21.-28.4.; C.Marka; Reserve + Astronomical commissioning + flexible & internal pool observations; |