Differences between revisions 831 and 1023 (spanning 192 versions)
Revision 831 as of 2014-07-21 11:40:37
Size: 3021
Comment:
Revision 1023 as of 2017-01-12 07:56:04
Size: 1616
Editor: PabloMellado
Comment: Notifications are not working
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
##language:en ## page was renamed from AstronomerOnDutySchedule
#language:en
Line 3: Line 4:

= 2017 =
Line 7: Line 10:
1; 31.12.-7.1.; J.L.Santaren & F.Damour (Operators, 31.12.-3.1.), G.Paubert (3.1.-7.1.);;
2; 7.-14.1.; M.Gonzalez; Heterodyne Pool;
3; 14.-21.1.; N.Billot; NIKA Cool down;
4; 21.-28.1.; A.Sievers; NIKA tests;
5; 28.1.-4.2.; S.Trevino;;
6; 4.-11.2.; M.Gonzalez (4-7 Feb) and I.Hermelo(7-11 Feb); Heterodyne Pool;
7; 11.18.2.; J.L.Santaren & F.Damour (Operators, 11-14 Feb) and I.Hermelo (14-18 Feb); 13./14.: 8h VLBI;
8; 18.-25.2.; N.Billot; NIKA 1st open pool run (18.-28.2.);
9; 25.2.-4.3.; I.Hermelo; NIKA pool till 28.2.;
10; 4.-11.3.; M.Gonzalez; Heterodyne Pool;
11; 11.-18.3.; A.Sievers (11.-14.3.), G.Paubert (14.-18.3.); Proposal deadline 13.3., Students of J.LeBourlot;
12; 18.-25.3.; S.Trevino;;
13; 25.-1.4.; C.Kramer (-28.3.), N.Billot (28.3.-1.4.);;
14; 1.-8.4.; I.Hermelo; GISMO pool (1.-11.4.);
15; 8.-15.4.; I.Hermelo (8.-11.4.), C.Kramer (11.-15.4.); PC-Meeting 9./10.;
16; 15.-22.4.; S.Trevino (15.-18.4.), M.Ruiz (day-time operator, 18.-22.4.);;
17; 22.-29.4.; A.Sievers (from Granada);;
18; 29.4.-6.5.; N.Billot;;
19; 6.-13.5.; I.Hermelo (6.-9.5.), S.Trevino (9.-12.5.), I.Hermelo (12.-13.5.); NIKA dry runs (7.5., 12.5.);
20; 13.-20.5.; C.Kramer; 1st 24hours holography run (14./15.5.);
21; 20.-27.5.; M.Ruiz (operator);3mm VLBI (22.-28.5.);
22; 27.5.-3.6.; S.Trevino;;
23; 3.-10.6.; M.Gonzalez;;
24; 10.-17.6.; G.Paubert (10.-13.6., 14.-17.6. from Granada);;
25; 17.-24.6.; M.Gonzalez(17.-20), S.Trevino (20.-24);;
26; 24.6.-1.7.; S. Trevino (24.-27.6.), I.Hermelo (27.6.-1.7.);;
27; 1.-8.7.; H. Ungerechts (from Granada);;
28; 8.-15.7.; M.Gonzalez (8.-11.7., 11.-15.7. from Granada);;
29; 15.-22.7.; I.Hermelo;;
30; 22.-29.7.; A.Sievers (22.-24.7., rest from Granada);;
31; 29.7.-5.8.; N.Billot;;
32; 5.-12.8.; F.Damour (day-time operator); J.Pety visiting astronomer;
33; 12.-19.8.; S.Trevino;;
34; 19.-26.8.; I.Hermelo;;
35; 26.8.-2.9.; H.Ungerechts (from Granada);;
36; 2.-9.9.; G.Paubert (from Granada);;
37; 9.-16.9.; S.Trevino + Claudia Marka (?);;
38; 16.-23.9.; I.Hermelo (16.-19.9.), J.Santiago (night-time operator); Heavy Maintenance Phase: 19.-25.9.;
39; 23.-30.9.; M.Ruiz + C.Marka (?); VLBI 3mm 25.-29.9.;
40; 30.9.-7.10.; S.Trevino;;
41; 7.-14.10.; A.Sievers + C.Marka (?); NIKA test run;
42; 14.-21.10.; H.Ungerechts (from Granada);;
43; 21.-28.10.; I.Hermelo; GISMO Pool;
44; 28.10.-4.11.; S.Trevino;;
45; 4.-11.11.;;;
46; 11.-18.11.; S.Trevino;;
47; 18.-25.11.; N.Billot; NIKA 2nd Pool;
48; 25.11.-2.12.; I.Hermelo;;
49; 2.-9.12.; S.Trevino;;
50; 9.-16.12.; N.Billot;;
51; 16.-23.12.; M.Ruiz & F.Damour (op.);;
52; 23.-30.12.; ;;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week;
2; 10.-17.1.; G.Paubert (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot;
4; 24.-31.1.; P.Garcia; 6hours NIKA2 slot, possible 4hours 1mm VLBI slots;
5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot;
6; 7.-14.2.; H.Ungerechts (remote from Granada); 10.2.: 0.8mm VLBI test slot;
7; 14.-21.2.; P.Torne; 15.2.: 0.8mm VLBI test slot;
8; 21.-28.2.; P.Garcia / A.Ritacco; NIKA2 commissioning week;
9; 28.2.-7.3.;G.Paubert (remote from Granada);;
10; 7.-14.3.;C.Marka/ A.Ritacco; 11.-13.3. A.Maury+Students;
11; 14.-21.3.;A.Sievers (remote from Granada); 16.3. IRAM Proposal Deadline;
12; 21.-28.3.;P.Garcia;;
13; 28.3.-4.4.; P.Torne; 30.3.-4.4. VLBI/GMVA 3mm Session;
14; 4.-11.4.; C.Marka / A.Ritacco; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
15; 11.-18.4.; P.Torne; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
16; 18.-25.4.;;;
17; 25.4.-2.5.;;;
18; 2.-9.5.;;;
19; 9.-16.5.;;;
20; 16.-23.5.;;;
21; 23.-30.5.;; End of winter semester W16;
22; 30.5.-6.6.;;;
Line 62: Line 35:
 * AodSchedule16
 * AodSchedule15
 * AodSchedule14

2017

1 3.-10.1. P.Torne Heterodyne Pool Week
2 10.-17.1. G.Paubert (remote from Granada)
3 17.-24.1. A.Sievers Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot
4 24.-31.1. P.Garcia 6hours NIKA2 slot, possible 4hours 1mm VLBI slots
5 31.1.-7.2. C.Marka Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot
6 7.-14.2. H.Ungerechts (remote from Granada) 10.2.: 0.8mm VLBI test slot
7 14.-21.2. P.Torne 15.2.: 0.8mm VLBI test slot
8 21.-28.2. P.Garcia / A.Ritacco NIKA2 commissioning week
9 28.2.-7.3. G.Paubert (remote from Granada)
10 7.-14.3. C.Marka/ A.Ritacco 11.-13.3. A.Maury+Students
11 14.-21.3. A.Sievers (remote from Granada) 16.3. IRAM Proposal Deadline
12 21.-28.3. P.Garcia
13 28.3.-4.4. P.Torne 30.3.-4.4. VLBI/GMVA 3mm Session
14 4.-11.4. C.Marka / A.Ritacco 5.-14.4.: VLBI/EHT 1mm Session and Pool
15 11.-18.4. P.Torne 5.-14.4.: VLBI/EHT 1mm Session and Pool
16 18.-25.4.
17 25.4.-2.5.
18 2.-9.5.
19 9.-16.5.
20 16.-23.5.
21 23.-30.5. End of winter semester W16
22 30.5.-6.6.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)