Differences between revisions 812 and 813
Revision 812 as of 2014-06-06 10:31:43
Size: 2636
Comment:
Revision 813 as of 2014-06-06 10:34:11
Size: 2757
Comment:
Deletions are marked like this. Additions are marked like this.
Line 48: Line 48:
42;;;;
43;;;;
44;;;;
45;;;;
46;;;;
47;;;;
48;;;;
49;;;;
50;;;;
51;;;;
52;;;;
42; 14.-21.10.;;;
43; 21.-28.10.;;;
44; 28.10.-4.11.;;;
45; 4.-11.11.;;;
46; 11.-18.11.;;;
47; 18.-25.11.;;;
48; 25.11.-2.12.;;;
49; 2.-9.12.;;;
50; 9.-16.12.;;;
51; 16.-23.12.;;;
52; 23.-30.12.;;;

1 31.12.-7.1. J.L.Santaren & F.Damour (Operators, 31.12.-3.1.), G.Paubert (3.1.-7.1.)
2 7.-14.1. M.Gonzalez Heterodyne Pool
3 14.-21.1. N.Billot NIKA Cool down
4 21.-28.1. A.Sievers NIKA tests
5 28.1.-4.2. S.Trevino
6 4.-11.2. M.Gonzalez (4-7 Feb) and I.Hermelo(7-11 Feb) Heterodyne Pool
7 11.18.2. J.L.Santaren & F.Damour (Operators, 11-14 Feb) and I.Hermelo (14-18 Feb) 13./14.: 8h VLBI
8 18.-25.2. N.Billot NIKA 1st open pool run (18.-28.2.)
9 25.2.-4.3. I.Hermelo NIKA pool till 28.2.
10 4.-11.3. M.Gonzalez Heterodyne Pool
11 11.-18.3. A.Sievers (11.-14.3.), G.Paubert (14.-18.3.) Proposal deadline 13.3., Students of J.LeBourlot
12 18.-25.3. S.Trevino
13 25.-1.4. C.Kramer (-28.3.), N.Billot (28.3.-1.4.)
14 1.-8.4. I.Hermelo GISMO pool (1.-11.4.)
15 8.-15.4. I.Hermelo (8.-11.4.), C.Kramer (11.-15.4.) PC-Meeting 9./10.
16 15.-22.4. S.Trevino (15.-18.4.), M.Ruiz (day-time operator, 18.-22.4.)
17 22.-29.4. A.Sievers (from Granada)
18 29.4.-6.5. N.Billot
19 6.-13.5. I.Hermelo (6.-9.5.), S.Trevino (9.-12.5.), I.Hermelo (12.-13.5.) NIKA dry runs (7.5., 12.5.)
20 13.-20.5. C.Kramer 1st 24hours holography run (14./15.5.)
21 20.-27.5. M.Ruiz (operator) 3mm VLBI (22.-28.5.)
22 27.5.-3.6. S.Trevino
23 3.-10.6. M.Gonzalez
24 10.-17.6. G.Paubert (10.-13.6., 14.-17.6. from Granada)
25 17.-24.6. M.Gonzalez(17.-20), S.Trevino (20.-24)
26 24.6.-1.7. S. Trevino (24.-27.6.), I.Hermelo (27.6.-1.7.)
27 1.-8.7. H. Ungerechts (from Granada)
28 8.-15.7. M.Gonzalez
29 15.-22.7. I.Hermelo
30 22.-29.7. A.Sievers (from Granada), J.Santiago & M.Ruiz (Operators)
31 29.7.-5.8. N.Billot
32 5.-12.8. M.Gonzalez
33 12.-19.8. S.Trevino
34 19.-26.8. I.Hermelo
35 26.8.-2.9. H.Ungerechts (from Granada)
36 2.-9.9. G.Paubert (from Granada)
37 9.-16.9. S.Trevino
38 16.-23.9. Heavy Maintenance Phase I: 15.-25.9.
39 23.-30.9. M.Ruiz (Operator) VLBI 3mm 25.-29.9.
40 30.9.-7.10. Heavy Maintenance Phase II: 29.9.-7.10.
41 7.-14.10. N.Billot NIKA Polarimetry Tests
42 14.-21.10.
43 21.-28.10.
44 28.10.-4.11.
45 4.-11.11.
46 11.-18.11.
47 18.-25.11.
48 25.11.-2.12.
49 2.-9.12.
50 9.-16.12.
51 16.-23.12.
52 23.-30.12.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)