Differences between revisions 764 and 765
Revision 764 as of 2014-01-15 14:35:09
Size: 1318
Editor: gra-wlan1
Comment:
Revision 765 as of 2014-01-15 14:35:36
Size: 1322
Editor: gra-wlan1
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
6; 4.-11.2.; M.Gonzalez (4-7 Feb) I.Hermelo(7-11 Feb); Heterodyne Pool; 6; 4.-11.2.; M.Gonzalez (4-7 Feb) and I.Hermelo(7-11 Feb); Heterodyne Pool;

1 31.12.-7.1. J.L.Santaren & F.Damour (Operators, 31.12.-3.1.). G.Paubert (3.1.-7.1.)
2 7.-14.1. M.Gonzalez Heterodyne Pool
3 14.-21.1. N.Billot NIKA Cool down
4 21.-28.1. A.Sievers NIKA tests
5 28.1.-4.2. S.Trevino
6 4.-11.2. M.Gonzalez (4-7 Feb) and I.Hermelo(7-11 Feb) Heterodyne Pool
7 11.18.2. J.L.Santaren and F.Damour (operators) 13./14.: 8h VLBI
8 18.-25.2. N.Billot NIKA 1st open pool run (18.-28.2.)
9 25.2.-4.3. I.Hermelo NIKA pool till 28.2.
10 4.-11.3. M.Gonzalez Heterodyne Pool
11 11.-18.3. A.Sievers Proposal deadline 13.3.
12 18.-25.3. S.Trevino
13 25.-1.4. G.Paubert (-28.3.), N.Billot (28.3.-1.4.)
14 1.-8.4. I.Hermelo GISMO pool (1.-11.4.)
15 8.-15.4. M.Gonzalez PC-Meeting 9./10.
16 15.-22.4.
17 22.-29.4.
18 29.4.-6.5.
19 6.-13.5.
20 13.-20.5.
21 20.-27.5. M.Ruiz (Operator) 3mm VLBI (22.-28.5.)

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)