Differences between revisions 761 and 763 (spanning 2 versions)
Revision 761 as of 2013-12-19 10:56:08
Size: 1265
Comment:
Revision 763 as of 2014-01-05 09:42:59
Size: 1260
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
5; 28.1.-4.2.; S.Trevino;; 5; 28.1.-4.2.; I.Hermelo;;
Line 13: Line 13:
7; 11.18.2.; I.Hermelo; 13./14.: 8h VLBI; 7; 11.18.2.; S.Trevino; 13./14.: 8h VLBI;
Line 15: Line 15:
9; 25.2.-4.3.; A.Sievers (-28.3.), G.Paubert (28.2.-4.3.);; 9; 25.2.-4.3.; I.Hermelo; NIKA pool till 28.2.;
Line 17: Line 17:
11; 11.-18.3.; I.Hermelo ; Proposal deadline 13.; 11; 11.-18.3.; A.Sievers; Proposal deadline 13.3.;
Line 19: Line 19:
13; 25.-1.4.; XXX (-28.3.), N.Billot (28.3.-1.4.);; 13; 25.-1.4.; G.Paubert (-28.3.), N.Billot (28.3.-1.4.);;

1 31.12.-7.1. J.L.Santaren & F.Damour (Operators, 31.12.-3.1.). G.Paubert (3.1.-7.1.)
2 7.-14.1. M.Gonzalez Heterodyne Pool
3 14.-21.1. N.Billot NIKA Cool down
4 21.-28.1. A.Sievers NIKA tests
5 28.1.-4.2. I.Hermelo
6 4.-11.2. M.Gonzalez Heterodyne Pool
7 11.18.2. S.Trevino 13./14.: 8h VLBI
8 18.-25.2. N.Billot NIKA 1st open pool run (18.-28.2.)
9 25.2.-4.3. I.Hermelo NIKA pool till 28.2.
10 4.-11.3. M.Gonzalez Heterodyne Pool
11 11.-18.3. A.Sievers Proposal deadline 13.3.
12 18.-25.3. S.Trevino
13 25.-1.4. G.Paubert (-28.3.), N.Billot (28.3.-1.4.)
14 1.-8.4. I.Hermelo GISMO pool (1.-11.4.)
15 8.-15.4. M.Gonzalez PC-Meeting 9./10.
16 15.-22.4.
17 22.-29.4.
18 29.4.-6.5.
19 6.-13.5.
20 13.-20.5.
21 20.-27.5. M.Ruiz (Operator) 3mm VLBI (22.-28.5.)

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)