Differences between revisions 759 and 760
Revision 759 as of 2013-12-16 13:01:56
Size: 1138
Comment:
Revision 760 as of 2013-12-16 14:53:28
Size: 1189
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
6; 4.-11.2.; M.Gonzalez;; 6; 4.-11.2.; M.Gonzalez; Heterodyne Pool;
Line 16: Line 16:
10; 4.-11.3.; M.Gonzalez;;
11; 11.-18.3.; ;;
12; 18.-25.3.; ;;
10; 4.-11.3.; M.Gonzalez; Heterodyne Pool;
11; 11.-18.3.; I.Hermelo ;;
12; 18.-25.3.; S.Trevino;;

1 31.12.-7.1. J.L.Santaren & F.Damour (Operators, 31.12.-3.1.). G.Paubert (3.1.-7.1.)
2 7.-14.1. M.Gonzalez Heterodyne Pool
3 14.-21.1. N.Billot NIKA Cool down
4 21.-28.1. A.Sievers NIKA tests
5 28.1.-4.2. S.Trevino
6 4.-11.2. M.Gonzalez Heterodyne Pool
7 11.18.2. I.Hermelo 13./14.: 8h VLBI
8 18.-25.2. N.Billot NIKA 1st open pool run (18.-28.2.)
9 25.2.-4.3. N.Billot (-28.3.), G.Paubert (28.2.-4.3.)
10 4.-11.3. M.Gonzalez Heterodyne Pool
11 11.-18.3. I.Hermelo
12 18.-25.3. S.Trevino
13 25.-1.4.
14 1.-8.4. I.Hermelo GISMO pool (1.-11.4.)
15 8.-15.4. M.Gonzalez
16 15.-22.4.
17 22.-29.4.
18 29.4.-6.5.
19 6.-13.5.
20 13.-20.5.
21 20.-27.5. M.Ruiz (Operator) 3mm VLBI (22.-28.5.)

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)