|
Size: 999
Comment:
|
Size: 1265
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 11: | Line 11: |
| 5; 28.1.-4.2.; ;; 6; 4.-11.2.; ;; 7; 11.18.2.; ; 14.: 8h VLBI; |
5; 28.1.-4.2.; S.Trevino;; 6; 4.-11.2.; M.Gonzalez; Heterodyne Pool; 7; 11.18.2.; I.Hermelo; 13./14.: 8h VLBI; |
| Line 15: | Line 15: |
| 9; 25.2.-4.3.; N.Billot (-28.3.), G.Paubert (28.2.-4.3.);; 10; 4.-11.3.; ;; 11; 11.-18.3.; ;; 12; 18.-25.3.; ;; 13; 25.-1.4.; ;; 14; 1.-8.4.; ;; 15; 8.-15.4.; ;; |
9; 25.2.-4.3.; A.Sievers (-28.3.), G.Paubert (28.2.-4.3.);; 10; 4.-11.3.; M.Gonzalez; Heterodyne Pool; 11; 11.-18.3.; I.Hermelo ; Proposal deadline 13.; 12; 18.-25.3.; S.Trevino;; 13; 25.-1.4.; XXX (-28.3.), N.Billot (28.3.-1.4.);; 14; 1.-8.4.; I.Hermelo; GISMO pool (1.-11.4.); 15; 8.-15.4.; M.Gonzalez; PC-Meeting 9./10.; |
| Line 27: | Line 27: |
| 21; 20.-27.5.; M.Ruiz (Operator);3mm VLBI (22.-28.5.); |
