Differences between revisions 754 and 756 (spanning 2 versions)
Revision 754 as of 2013-12-16 12:39:00
Size: 3089
Comment:
Revision 756 as of 2013-12-16 12:47:48
Size: 902
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
1; 1.-8.1.2013; G.Bruni;;
2; 8.-15.1.2013; A.Sievers;;
3; 15.-22.1.2013; M.Gonzalez; Pool;
4; 22.-29.1.2013; N.Billot; Pool;
5; 29.1.-5.2.; S.Trevino;;
6; 5.-12.2.; J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.;;
7; 12.-19.2.; N.Billot; Pool, VLBI test on 14. or 18.2.;
8; 19.-26.2.; M.Gonzalez, I.Hermelo (19., 22.-26.2.); Pool;
9; 26.2.-5.3.; J.L.Santaren (night-time operator);;
10; 5.-12.3.; S.Trevino, I.Hermelo;;
11; 12.-19.3.; M.Gonzalez; 11.-13. HEMT installation & alignment, 15.-18. J.LeBourlot with students;
12; 19.-26.3.; G.Paubert (19.-22.3.), I.Hermelo (22.-29.3.); Pool & 1mm VLBI;
13; 26.3.-2.4.; F.Damour (day-time operator), I.Hermelo (22.-29.3.); Pool & 1mm VLBI (till 28.3.), Semana Santa;
14; 2.-9.4.; S.Trevino;;
15; 9.-16.4.; A.Sievers, C.Kramer 12.-18.4.; GISMO-Pool (10./11. PC meeting);
16; 16.-23.4.; I.Hermelo, C.Kramer -18.4.; GISMO-Pool;
17; 23.-30.4.; M.Gonzalez; GISMO-Pool;
18; 30.4.-7.5.; S.Trevino;;
19; 7.-14.5.; I.Hermelo; the road should be open again soon;
20; 14.-21.5.; M.Ruiz; NIKA: exchange of arrays and electronics, 3mm VLBI (16.-22.5.);
21; 21.-28.5.; G.Paubert;;
22; 28.-4.6.; I. Hermelo; Start of Summer Semester;
23; 4.-11.6.; S. Trevino;;
24; 11.-18.6.; N.Billot; NIKA run;
25; 18.-25.6.; A.Sievers;;
26; 25.6.-2.7.; I. Hermelo;;
27; 2.-9.7.; S. Trevino;;
28; 9.-16.7.; G.Paubert;;
29; 16.-23.7.; N.Billot;;
30; 23.-30.7.; M.Gonzalez;;
31; 30.7.-6.8.; I.Hermelo;;
32; 6.-13.8.; F.Damour & J.L.Santaren (Operators);;
33; 13.-20.8.; S.Trevino;;
34; 20.-27.8.; M.Ruiz & J.Santiago (Operators);;
35; 27.8.-3.9.; I.Hermelo;;
36; 3.-10.9.; S.Trevino; Proposal deadline: 12.9.;
37; 10.-17.9.; G.Paubert; Summerschool: 13.-20.9., EMIR warm-up: 19.9.;
38; 17.-24.9.; V.Peula & K.Lobato (Operators); Heavy Maintenance (E1/E2 upgrade): 20.-26.;
39; 24.9.-1.10.; M.Ruiz; VLBI: 26.-30.9.;
40; 1.-8.10.; M.Gonzalez; EMIR commissioning;
41; 8.-15.10.; A.Sievers; Heterodyne pool;
42; 15.-22.10.; M.Gonzalez; Heterodyne pool;
43; 22.-29.10.; I.Hermelo; GISMO pool;
44; 29.10.-5.11.; M.Gonzalez; GISMO pool;
45; 5.-12.11.; S.Trevino;;
46; 12.-19.11.; N.Billot;;
47; 19.-26.11.; I.Hermelo; Het pool;
48; 26.11.-3.12.; G.Paubert (26.-29.11.), J.Santiago (operator, 29.11.-3.12.);;
49; 3.-10.12.; S.Trevino;;
50; 10.-17.12.; N.Billot (10.-13.12.), J.L.Santaren & M.Ruiz (operators, 13.-17.12.);;
51; 17.-24.12.; S.Trevino; B.Lefloch & Students (19.-22.12.);
52; 24.-31.12.; I.Hermelo;;
Line 63: Line 11:
5; 28.1.-4.2.; ;;
6; 4.-11.2.; ;;
7; 11.18.2.; ;;
8; 18.-25.2.; ;;
9; 25.2.-4.3.; ;;
10; 4.-11.3.; ;;
11; 11.-18.3.; ;;
12; 18.-25.3.; ;;
13; 25.-1.4.; ;;
14; 1.-8.4.; ;;
15; 8.-15.4.; ;;
16; 15.-22.4.; ;;
17; 22.-29.4.; ;;
18; 29.4.-6.5.; ;;
19; 6.-13.5.; ;;
20; 13.-20.5.; ;;

1 31.12.-7.1. J.L.Santaren & F.Damour (Operators, 31.12.-3.1.). G.Paubert (3.1.-7.1.)
2 7.-14.1. M.Gonzalez Heterodyne Pool
3 14.-21.1. N.Billot NIKA Cool down
4 21.-28.1. A.Sievers NIKA tests
5 28.1.-4.2.
6 4.-11.2.
7 11.18.2.
8 18.-25.2.
9 25.2.-4.3.
10 4.-11.3.
11 11.-18.3.
12 18.-25.3.
13 25.-1.4.
14 1.-8.4.
15 8.-15.4.
16 15.-22.4.
17 22.-29.4.
18 29.4.-6.5.
19 6.-13.5.
20 13.-20.5.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)