Differences between revisions 750 and 1023 (spanning 273 versions)
Revision 750 as of 2013-10-30 16:20:33
Size: 2948
Editor: lt-nb
Comment:
Revision 1023 as of 2017-01-12 07:56:04
Size: 1616
Editor: PabloMellado
Comment: Notifications are not working
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
##language:en ## page was renamed from AstronomerOnDutySchedule
#language:en
Line 3: Line 4:

= 2017 =
Line 7: Line 10:
1; 1.-8.1.2013; G.Bruni;;
2; 8.-15.1.2013; A.Sievers;;
3; 15.-22.1.2013; M.Gonzalez; Pool;
4; 22.-29.1.2013; N.Billot; Pool;
5; 29.1.-5.2.; S.Trevino;;
6; 5.-12.2.; J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.;;
7; 12.-19.2.; N.Billot; Pool, VLBI test on 14. or 18.2.;
8; 19.-26.2.; M.Gonzalez, I.Hermelo (19., 22.-26.2.); Pool;
9; 26.2.-5.3.; J.L.Santaren (night-time operator);;
10; 5.-12.3.; S.Trevino, I.Hermelo;;
11; 12.-19.3.; M.Gonzalez; 11.-13. HEMT installation & alignment, 15.-18. J.LeBourlot with students;
12; 19.-26.3.; G.Paubert (19.-22.3.), I.Hermelo (22.-29.3.); Pool & 1mm VLBI;
13; 26.3.-2.4.; F.Damour (day-time operator), I.Hermelo (22.-29.3.); Pool & 1mm VLBI (till 28.3.), Semana Santa;
14; 2.-9.4.; S.Trevino;;
15; 9.-16.4.; A.Sievers, C.Kramer 12.-18.4.; GISMO-Pool (10./11. PC meeting);
16; 16.-23.4.; I.Hermelo, C.Kramer -18.4.; GISMO-Pool;
17; 23.-30.4.; M.Gonzalez; GISMO-Pool;
18; 30.4.-7.5.; S.Trevino;;
19; 7.-14.5.; I.Hermelo; the road should be open again soon;
20; 14.-21.5.; M.Ruiz; NIKA: exchange of arrays and electronics, 3mm VLBI (16.-22.5.);
21; 21.-28.5.; G.Paubert;;
22; 28.-4.6.; I. Hermelo; Start of Summer Semester;
23; 4.-11.6.; S. Trevino;;
24; 11.-18.6.; N.Billot; NIKA run;
25; 18.-25.6.; A.Sievers;;
26; 25.6.-2.7.; I. Hermelo;;
27; 2.-9.7.; S. Trevino;;
28; 9.-16.7.; G.Paubert;;
29; 16.-23.7.; N.Billot;;
30; 23.-30.7.; M.Gonzalez;;
31; 30.7.-6.8.; I.Hermelo;;
32; 6.-13.8.; F.Damour & J.L.Santaren (Operators);;
33; 13.-20.8.; S.Trevino;;
34; 20.-27.8.; M.Ruiz & J.Santiago (Operators);;
35; 27.8.-3.9.; I.Hermelo;;
36; 3.-10.9.; S.Trevino; Proposal deadline: 12.9.;
37; 10.-17.9.; G.Paubert; Summerschool: 13.-20.9., EMIR warm-up: 19.9.;
38; 17.-24.9.; V.Peula & K.Lobato (Operators); Heavy Maintenance (E1/E2 upgrade): 20.-26.;
39; 24.9.-1.10.; M.Ruiz; VLBI: 26.-30.9.;
40; 1.-8.10.; M.Gonzalez; EMIR commissioning;
41; 8.-15.10.; A.Sievers; Heterodyne pool;
42; 15.-22.10.; M.Gonzalez; Heterodyne pool;
43; 22.-29.10.; I.Hermelo; GISMO pool;
44; 29.10.-5.11.; M.Gonzalez; GISMO pool;
45; 5.-12.11.; S.Trevino;;
46; 12.-19.11.; N.Billot;;
47; 19.-26.11.; I.Hermelo; Het pool;
48; 26.11.-3.12.; G.Paubert (26.-29.11.), J.Santiago (operator, 29.11.-3.12.);;
49; 3.-10.12.; S.Trevino;;
50; 10.-17.12.; N.Billot;;
51; 17.-24.12.; S.Trevino; B.Lefloch & Students (19.-22.12.);
52; 24.-31.12.; I.Hermelo;;
1; 31.12.-7.1.; J.L.Santaren & F.Damour (Operators);;
2; 7.-14.1.;;;
3; 14.-21.1.; N.Billot; NIKA Cool down;
4; 21.-28.1.; A.Sievers; NIKA tests;
1; 3.-10.1.; P.Torne; Heterodyne Pool Week;
2; 10.-17.1.; G.Paubert (remote from Granada);;
3; 17.-24.1.; A.Sievers; Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot;
4; 24.-31.1.; P.Garcia; 6hours NIKA2 slot, possible 4hours 1mm VLBI slots;
5; 31.1.-7.2.; C.Marka; Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot;
6; 7.-14.2.; H.Ungerechts (remote from Granada); 10.2.: 0.8mm VLBI test slot;
7; 14.-21.2.; P.Torne; 15.2.: 0.8mm VLBI test slot;
8; 21.-28.2.; P.Garcia / A.Ritacco; NIKA2 commissioning week;
9; 28.2.-7.3.;G.Paubert (remote from Granada);;
10; 7.-14.3.;C.Marka/ A.Ritacco; 11.-13.3. A.Maury+Students;
11; 14.-21.3.;A.Sievers (remote from Granada); 16.3. IRAM Proposal Deadline;
12; 21.-28.3.;P.Garcia;;
13; 28.3.-4.4.; P.Torne; 30.3.-4.4. VLBI/GMVA 3mm Session;
14; 4.-11.4.; C.Marka / A.Ritacco; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
15; 11.-18.4.; P.Torne; 5.-14.4.: VLBI/EHT 1mm Session and Pool;
16; 18.-25.4.;;;
17; 25.4.-2.5.;;;
18; 2.-9.5.;;;
19; 9.-16.5.;;;
20; 16.-23.5.;;;
21; 23.-30.5.;; End of winter semester W16;
22; 30.5.-6.6.;;;
Line 66: Line 35:
 * AodSchedule16
 * AodSchedule15
 * AodSchedule14
 * AodSchedule13

2017

1 3.-10.1. P.Torne Heterodyne Pool Week
2 10.-17.1. G.Paubert (remote from Granada)
3 17.-24.1. A.Sievers Switch from mira to mrt-cal, 20.1.: 0.8mm VLBI test slot
4 24.-31.1. P.Garcia 6hours NIKA2 slot, possible 4hours 1mm VLBI slots
5 31.1.-7.2. C.Marka Heterodyne Pool Week #2, possible 4hours 1mm VLBI test slot
6 7.-14.2. H.Ungerechts (remote from Granada) 10.2.: 0.8mm VLBI test slot
7 14.-21.2. P.Torne 15.2.: 0.8mm VLBI test slot
8 21.-28.2. P.Garcia / A.Ritacco NIKA2 commissioning week
9 28.2.-7.3. G.Paubert (remote from Granada)
10 7.-14.3. C.Marka/ A.Ritacco 11.-13.3. A.Maury+Students
11 14.-21.3. A.Sievers (remote from Granada) 16.3. IRAM Proposal Deadline
12 21.-28.3. P.Garcia
13 28.3.-4.4. P.Torne 30.3.-4.4. VLBI/GMVA 3mm Session
14 4.-11.4. C.Marka / A.Ritacco 5.-14.4.: VLBI/EHT 1mm Session and Pool
15 11.-18.4. P.Torne 5.-14.4.: VLBI/EHT 1mm Session and Pool
16 18.-25.4.
17 25.4.-2.5.
18 2.-9.5.
19 9.-16.5.
20 16.-23.5.
21 23.-30.5. End of winter semester W16
22 30.5.-6.6.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)