Differences between revisions 729 and 930 (spanning 201 versions)
Revision 729 as of 2013-05-10 08:08:51
Size: 2451
Editor: lt-ck
Comment:
Revision 930 as of 2015-12-04 10:28:32
Size: 3848
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
1; 1.-8.1.2013; G.Bruni;;
2; 8.-15.1.2013; A.Sievers;;
3; 15.-22.1.2013; M.Gonzalez; Pool;
4; 22.-29.1.2013; N.Billot; Pool;
5; 29.1.-5.2.; S.Trevino;;
6; 5.-12.2.; J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.;;
7; 12.-19.2.; N.Billot; Pool, VLBI test on 14. or 18.2.;
8; 19.-26.2.; M.Gonzalez, I.Hermelo (19., 22.-26.2.); Pool;
9; 26.2.-5.3.; J.L.Santaren (night-time operator);;
10; 5.-12.3.; S.Trevino, I.Hermelo;;
11; 12.-19.3.; M.Gonzalez; 11.-13. HEMT installation & alignment, 15.-18. J.LeBourlot with students;
12; 19.-26.3.; G.Paubert (19.-22.3.), I.Hermelo (22.-29.3.); Pool & 1mm VLBI;
13; 26.3.-2.4.; F.Damour (day-time operator), I.Hermelo (22.-29.3.); Pool & 1mm VLBI (till 28.3.), Semana Santa;
14; 2.-9.4.; S.Trevino;;
15; 9.-16.4.; A.Sievers, C.Kramer 12.-18.4.; GISMO-Pool (10./11. PC meeting);
16; 16.-23.4.; I.Hermelo, C.Kramer -18.4.; GISMO-Pool;
17; 23.-30.4.; M.Gonzalez; GISMO-Pool;
18; 30.4.-7.5.; S.Trevino;;
19; 7.-14.5.; I.Hermelo; the road should be open again soon;
20; 14.-21.5.; M.Ruiz; NIKA: exchange of arrays and electronics, 3mm VLBI (16.-22.5.);
21; 21.-28.5.; G.Paubert;;
22; 28.-4.6.; I.Hermelo; Start of Summer Semester;
23; 4.-11.6.; S.Trevino;;
24; 11.-18.6.; N.Billot; NIKA run;
25; 18.-25.6.; A.Sievers;;
26; 25.6.-2.7.; M.Gonzalez;;
27; 2.-9.7.; I.Hermelo;;
28; 9.-16.7.; S.Trevino;;
29; 16.-23.7.;N.Billot;;
30; 23.-30.7.;;;
31; 30.7.-6.8.;;;
32; 6.-13.8.;;;
33; 13.-20.8.;;;
34; 20.-27.8.;;;
35; 27.8.-3.9.;;;
36; 3.-10.9.;; Proposal deadline: 12.9.;
37; 10.-17.9.;; Summerschool: 13.-20.9., EMIR warm-up: 19.9.;
38; 17.-24.9.;; Heavy Maintenance: 20.-26.;
39; 24.9.-1.10.; M.Ruiz; VLBI: 26.-30.9.;
40; 1.-8.10.; S.Trevino;;
41; 8.-15.10.; M.Gonzalez; Heterodyne pool;
42; 15.-22.10.; A.Sievers; Heterodyne pool;
43; 22.-29.10.; I.Hermelo; GISMO pool;
44; 29.10.-5.11.; M.Gonzalez; GISMO pool;
45; 5.-12.11.; ;;
46; 12.-19.11.; N.Billot;;
47; 19.-26.11.; ;;
48; 26.11.-3.12.; ;;
49; 3.-10.12.; ;;
50; 10.-17.12.; N.Billot;;
51; 17.-24.12.; ;;
52; 24.-31.12.; ;;
1; 30.12.-6.1.; I.Hermelo;;
2; 6.-13.1.; C.Marka; Heterodyne Pool ;
3; 13.-20.1.; G.Paubert; Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?);
4; 20.-27.1.; M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.);
5; 27.1.-3.2.; N.Billot; NIKA Pool;
6; 3.-10.2.; I.Hermelo; NIKA Pool;
7; 10.-17.2.; A.Sievers; NIKA Polarimetry test run;
8; 17.-24.2.; N.Billot;;
9; 24.2.-3.3.; I.Hermelo; GISMO Pool;
10; 3.-10.3.; G.Paubert; Pulsar observations;
11; 10.-17.3.; C.Marka; IRAM Deadline on 12-Mar;
12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI);
13; 24.-31.3.; C.Marka; Heterodyne Pool(flexible 1mm VLBI);
14; 31.3.-7.4.; H.Ungerechts (from Granada);;
15; 7.-14.4.; G.Paubert (from Granada); Installation of new optics;
16; 14.-21.4.; A.Sievers; Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.);
17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations;
18; 28.4.-5.5.; I.Hermelo;;
19; 5.-12.5.; N.Billot;;
20; 12.-19.5.; G.Paubert (partially from Granada); 14-May: Visit of 20 students from Nijmegen;
21; 19.-26.5.; C.Kramer (19.-22.5.), F.Damour/J.Santiago (Operators, 22.-26.5.); Holography 18.-22.5.;
22; 26.5.-2.6.; C.Marka;;
23; 2.6.-9.6.; H.Ungerechts (from Granada);;
24; 9.6.-16.6.; J.Santiago/F.Damour (Operators);;
25; 16.6.-23.6.; I.Hermelo;;
26; 23.6.-30.6.; C.Kramer (23.-26.6.), C.Marka (26.-30.6.); 22.-26.6. Heavy Maintenance: Secondary, Holography;
27; 30.6.-7.7.; N.Billot ; ;
28; 7.7.-14.7.; A.Sievers (from Granada); 11.7.: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel ;
29; 14.7.-21.7.; I.Hermelo (14.-18.7), S.Trevino (18.-20.7.), G.Paubert (20.-25.7.); 18.7.: visit IRAM-OSN ;
30; 21.7.-28.7.; G.Paubert (20.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.); VESPA Polarimetry;
31; 28.7.-4.8.; C.Marka; Heterodyne Pool;
32; 4.8.-11.8.; J.L.Santaren (night time Operator); 8.8.: visit IRAM-OSN;
33; 11.8.-18.8.; I.Hermelo; 12/13.8. Installation of M4N/M5N, 15.8.: visit IRAM-OSN;
34; 18.8.-25.8.; A.Sievers;;
35; 25.8.-1.9.; C.Marka;;
36; 1.-8.9.; H.Ungerechts (from Granada);;
37; 8.-15.9.; N.Billot; 11.-18.9. Summerschool;
38; 15.-22.9.; G.Paubert; 11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline;
39; 22.-29.9.; M.Ruiz (night-time: 22.-25.9., then day-time); 3mm VLBI;
40; 29.9.-6.10.; Operators; NIKA2 Installation;
41; 6.-13.10; I. Hermelo (6.-9.10.), N.Billot (9.-10.10.), C.Marka (10.-13.10.); Heterodyne Pool (NIKA2 cooling down);
42; 13.-20.10.; I.Hermelo; Part-time: NIKA2 testing;
43; 20.-27.10.; A.Sievers;Part-time: NIKA2 testing;
44; 27.10.-3.11.; C.Kramer;Part-time: NIKA2 testing;
45; 3.-10.11.; C.Marka; ;
46; 10.-17.11.; G.Paubert;;
47; 17.-24.11.; N.Billot;;
48; 24.11.-1.12.; J.Santiago/F.Damour (Operators); EMIR upgrade;
49; 1.-8.12.; C.Marka; EMIR commissioning (CM, IH, AS, CK), Start of Wintersemester 2015/16;
50; 8.-15.12.; I.Hermelo;;
51; 15.-22.12.; G.Paubert (partially remote from Granada);;
52; 22.-29.12.; Support is provided partially remotely from Granada: H.Ungerechts (22.-24.12.), F.Damour/I.Ruiz (Operators, 25.12.), H.Ungerechts (26.12.), C.Marka (27.-28.12.);;
53; 29.12.-5.1.; C.Marka;;
1; 5.-12.1.; J.L.Santaren/M.Ruiz (Operators);;
2; 12.-19.1.; C.Marka; Hetrodyne pool ;;
3; 19.-26.1.; N.Billot; NIKA2 test run 3 ;;
4; 26.1.-2.2.; I.Hermelo; NIKA2 test run 3 ;;
Line 62: Line 67:
 * AodSchedule15
 * AodSchedule14
 * AodSchedule13

1 30.12.-6.1. I.Hermelo
2 6.-13.1. C.Marka Heterodyne Pool
3 13.-20.1. G.Paubert Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?)
4 20.-27.1. M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1) NIKA prep. time (T21, 23-25.2.)
5 27.1.-3.2. N.Billot NIKA Pool
6 3.-10.2. I.Hermelo NIKA Pool
7 10.-17.2. A.Sievers NIKA Polarimetry test run
8 17.-24.2. N.Billot
9 24.2.-3.3. I.Hermelo GISMO Pool
10 3.-10.3. G.Paubert Pulsar observations
11 10.-17.3. C.Marka IRAM Deadline on 12-Mar
12 17.-24.3. I.Hermelo Heterodyne Pool (flexible 1mm VLBI)
13 24.-31.3. C.Marka Heterodyne Pool(flexible 1mm VLBI)
14 31.3.-7.4. H.Ungerechts (from Granada)
15 7.-14.4. G.Paubert (from Granada) Installation of new optics
16 14.-21.4. A.Sievers Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.)
17 21.-28.4. C.Marka Astronomical commissioning + flexible & internal pool observations
18 28.4.-5.5. I.Hermelo
19 5.-12.5. N.Billot
20 12.-19.5. G.Paubert (partially from Granada) 14-May: Visit of 20 students from Nijmegen
21 19.-26.5. C.Kramer (19.-22.5.), F.Damour/J.Santiago (Operators, 22.-26.5.) Holography 18.-22.5.
22 26.5.-2.6. C.Marka
23 2.6.-9.6. H.Ungerechts (from Granada)
24 9.6.-16.6. J.Santiago/F.Damour (Operators)
25 16.6.-23.6. I.Hermelo
26 23.6.-30.6. C.Kramer (23.-26.6.), C.Marka (26.-30.6.) 22.-26.6. Heavy Maintenance: Secondary, Holography
27 30.6.-7.7. N.Billot
28 7.7.-14.7. A.Sievers (from Granada) 11.7.: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel
29 14.7.-21.7. I.Hermelo (14.-18.7), S.Trevino (18.-20.7.), G.Paubert (20.-25.7.) 18.7.: visit IRAM-OSN
30 21.7.-28.7. G.Paubert (20.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.) VESPA Polarimetry
31 28.7.-4.8. C.Marka Heterodyne Pool
32 4.8.-11.8. J.L.Santaren (night time Operator) 8.8.: visit IRAM-OSN
33 11.8.-18.8. I.Hermelo 12/13.8. Installation of M4N/M5N, 15.8.: visit IRAM-OSN
34 18.8.-25.8. A.Sievers
35 25.8.-1.9. C.Marka
36 1.-8.9. H.Ungerechts (from Granada)
37 8.-15.9. N.Billot 11.-18.9. Summerschool
38 15.-22.9. G.Paubert 11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline
39 22.-29.9. M.Ruiz (night-time: 22.-25.9., then day-time) 3mm VLBI
40 29.9.-6.10. Operators NIKA2 Installation
41 6.-13.10 I. Hermelo (6.-9.10.), N.Billot (9.-10.10.), C.Marka (10.-13.10.) Heterodyne Pool (NIKA2 cooling down)
42 13.-20.10. I.Hermelo Part-time: NIKA2 testing
43 20.-27.10. A.Sievers Part-time: NIKA2 testing
44 27.10.-3.11. C.Kramer Part-time: NIKA2 testing
45 3.-10.11. C.Marka
46 10.-17.11. G.Paubert
47 17.-24.11. N.Billot
48 24.11.-1.12. J.Santiago/F.Damour (Operators) EMIR upgrade
49 1.-8.12. C.Marka EMIR commissioning (CM, IH, AS, CK), Start of Wintersemester 2015/16
50 8.-15.12. I.Hermelo
51 15.-22.12. G.Paubert (partially remote from Granada)
52 22.-29.12. Support is provided partially remotely from Granada: H.Ungerechts (22.-24.12.), F.Damour/I.Ruiz (Operators, 25.12.), H.Ungerechts (26.12.), C.Marka (27.-28.12.)
53 29.12.-5.1. C.Marka
1 5.-12.1. J.L.Santaren/M.Ruiz (Operators)
2 12.-19.1. C.Marka Hetrodyne pool
3 19.-26.1. N.Billot NIKA2 test run 3
4 26.1.-2.2. I.Hermelo NIKA2 test run 3

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)