|
Size: 2451
Comment:
|
Size: 3848
Comment:
|
| Deletions are marked like this. | Additions are marked like this. |
| Line 7: | Line 7: |
| 1; 1.-8.1.2013; G.Bruni;; 2; 8.-15.1.2013; A.Sievers;; 3; 15.-22.1.2013; M.Gonzalez; Pool; 4; 22.-29.1.2013; N.Billot; Pool; 5; 29.1.-5.2.; S.Trevino;; 6; 5.-12.2.; J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.;; 7; 12.-19.2.; N.Billot; Pool, VLBI test on 14. or 18.2.; 8; 19.-26.2.; M.Gonzalez, I.Hermelo (19., 22.-26.2.); Pool; 9; 26.2.-5.3.; J.L.Santaren (night-time operator);; 10; 5.-12.3.; S.Trevino, I.Hermelo;; 11; 12.-19.3.; M.Gonzalez; 11.-13. HEMT installation & alignment, 15.-18. J.LeBourlot with students; 12; 19.-26.3.; G.Paubert (19.-22.3.), I.Hermelo (22.-29.3.); Pool & 1mm VLBI; 13; 26.3.-2.4.; F.Damour (day-time operator), I.Hermelo (22.-29.3.); Pool & 1mm VLBI (till 28.3.), Semana Santa; 14; 2.-9.4.; S.Trevino;; 15; 9.-16.4.; A.Sievers, C.Kramer 12.-18.4.; GISMO-Pool (10./11. PC meeting); 16; 16.-23.4.; I.Hermelo, C.Kramer -18.4.; GISMO-Pool; 17; 23.-30.4.; M.Gonzalez; GISMO-Pool; 18; 30.4.-7.5.; S.Trevino;; 19; 7.-14.5.; I.Hermelo; the road should be open again soon; 20; 14.-21.5.; M.Ruiz; NIKA: exchange of arrays and electronics, 3mm VLBI (16.-22.5.); 21; 21.-28.5.; G.Paubert;; 22; 28.-4.6.; I.Hermelo; Start of Summer Semester; 23; 4.-11.6.; S.Trevino;; 24; 11.-18.6.; N.Billot; NIKA run; 25; 18.-25.6.; A.Sievers;; 26; 25.6.-2.7.; M.Gonzalez;; 27; 2.-9.7.; I.Hermelo;; 28; 9.-16.7.; S.Trevino;; 29; 16.-23.7.;N.Billot;; 30; 23.-30.7.;;; 31; 30.7.-6.8.;;; 32; 6.-13.8.;;; 33; 13.-20.8.;;; 34; 20.-27.8.;;; 35; 27.8.-3.9.;;; 36; 3.-10.9.;; Proposal deadline: 12.9.; 37; 10.-17.9.;; Summerschool: 13.-20.9., EMIR warm-up: 19.9.; 38; 17.-24.9.;; Heavy Maintenance: 20.-26.; 39; 24.9.-1.10.; M.Ruiz; VLBI: 26.-30.9.; 40; 1.-8.10.; S.Trevino;; 41; 8.-15.10.; M.Gonzalez; Heterodyne pool; 42; 15.-22.10.; A.Sievers; Heterodyne pool; 43; 22.-29.10.; I.Hermelo; GISMO pool; 44; 29.10.-5.11.; M.Gonzalez; GISMO pool; 45; 5.-12.11.; ;; 46; 12.-19.11.; N.Billot;; 47; 19.-26.11.; ;; 48; 26.11.-3.12.; ;; 49; 3.-10.12.; ;; 50; 10.-17.12.; N.Billot;; 51; 17.-24.12.; ;; 52; 24.-31.12.; ;; |
1; 30.12.-6.1.; I.Hermelo;; 2; 6.-13.1.; C.Marka; Heterodyne Pool ; 3; 13.-20.1.; G.Paubert; Heterodyne Pool (1x24h-Holo: Thu/Fri or Mon/Tue ?); 4; 20.-27.1.; M.Ruiz & I.Ruiz (Operators), I. Hermelo (23.-26.1); NIKA prep. time (T21, 23-25.2.); 5; 27.1.-3.2.; N.Billot; NIKA Pool; 6; 3.-10.2.; I.Hermelo; NIKA Pool; 7; 10.-17.2.; A.Sievers; NIKA Polarimetry test run; 8; 17.-24.2.; N.Billot;; 9; 24.2.-3.3.; I.Hermelo; GISMO Pool; 10; 3.-10.3.; G.Paubert; Pulsar observations; 11; 10.-17.3.; C.Marka; IRAM Deadline on 12-Mar; 12; 17.-24.3.; I.Hermelo; Heterodyne Pool (flexible 1mm VLBI); 13; 24.-31.3.; C.Marka; Heterodyne Pool(flexible 1mm VLBI); 14; 31.3.-7.4.; H.Ungerechts (from Granada);; 15; 7.-14.4.; G.Paubert (from Granada); Installation of new optics; 16; 14.-21.4.; A.Sievers; Technical & on-sky commissioning, Granada: PC Meeting on 14/15.4. + 30m visit (16.4.); 17; 21.-28.4.; C.Marka; Astronomical commissioning + flexible & internal pool observations; 18; 28.4.-5.5.; I.Hermelo;; 19; 5.-12.5.; N.Billot;; 20; 12.-19.5.; G.Paubert (partially from Granada); 14-May: Visit of 20 students from Nijmegen; 21; 19.-26.5.; C.Kramer (19.-22.5.), F.Damour/J.Santiago (Operators, 22.-26.5.); Holography 18.-22.5.; 22; 26.5.-2.6.; C.Marka;; 23; 2.6.-9.6.; H.Ungerechts (from Granada);; 24; 9.6.-16.6.; J.Santiago/F.Damour (Operators);; 25; 16.6.-23.6.; I.Hermelo;; 26; 23.6.-30.6.; C.Kramer (23.-26.6.), C.Marka (26.-30.6.); 22.-26.6. Heavy Maintenance: Secondary, Holography; 27; 30.6.-7.7.; N.Billot ; ; 28; 7.7.-14.7.; A.Sievers (from Granada); 11.7.: visit IRAM-OSN, 10.-13.7. 026-15 by C.Marka/F.Mirabel ; 29; 14.7.-21.7.; I.Hermelo (14.-18.7), S.Trevino (18.-20.7.), G.Paubert (20.-25.7.); 18.7.: visit IRAM-OSN ; 30; 21.7.-28.7.; G.Paubert (20.-25.7.), J.Santiago/F.Damour (Operators, 25.-28.7.); VESPA Polarimetry; 31; 28.7.-4.8.; C.Marka; Heterodyne Pool; 32; 4.8.-11.8.; J.L.Santaren (night time Operator); 8.8.: visit IRAM-OSN; 33; 11.8.-18.8.; I.Hermelo; 12/13.8. Installation of M4N/M5N, 15.8.: visit IRAM-OSN; 34; 18.8.-25.8.; A.Sievers;; 35; 25.8.-1.9.; C.Marka;; 36; 1.-8.9.; H.Ungerechts (from Granada);; 37; 8.-15.9.; N.Billot; 11.-18.9. Summerschool; 38; 15.-22.9.; G.Paubert; 11.-18.9. Summerschool, 17.9. IRAM Proposal Deadline; 39; 22.-29.9.; M.Ruiz (night-time: 22.-25.9., then day-time); 3mm VLBI; 40; 29.9.-6.10.; Operators; NIKA2 Installation; 41; 6.-13.10; I. Hermelo (6.-9.10.), N.Billot (9.-10.10.), C.Marka (10.-13.10.); Heterodyne Pool (NIKA2 cooling down); 42; 13.-20.10.; I.Hermelo; Part-time: NIKA2 testing; 43; 20.-27.10.; A.Sievers;Part-time: NIKA2 testing; 44; 27.10.-3.11.; C.Kramer;Part-time: NIKA2 testing; 45; 3.-10.11.; C.Marka; ; 46; 10.-17.11.; G.Paubert;; 47; 17.-24.11.; N.Billot;; 48; 24.11.-1.12.; J.Santiago/F.Damour (Operators); EMIR upgrade; 49; 1.-8.12.; C.Marka; EMIR commissioning (CM, IH, AS, CK), Start of Wintersemester 2015/16; 50; 8.-15.12.; I.Hermelo;; 51; 15.-22.12.; G.Paubert (partially remote from Granada);; 52; 22.-29.12.; Support is provided partially remotely from Granada: H.Ungerechts (22.-24.12.), F.Damour/I.Ruiz (Operators, 25.12.), H.Ungerechts (26.12.), C.Marka (27.-28.12.);; 53; 29.12.-5.1.; C.Marka;; 1; 5.-12.1.; J.L.Santaren/M.Ruiz (Operators);; 2; 12.-19.1.; C.Marka; Hetrodyne pool ;; 3; 19.-26.1.; N.Billot; NIKA2 test run 3 ;; 4; 26.1.-2.2.; I.Hermelo; NIKA2 test run 3 ;; |
| Line 62: | Line 67: |
| * AodSchedule15 * AodSchedule14 * AodSchedule13 |
