Differences between revisions 722 and 723
Revision 722 as of 2013-03-04 12:24:46
Size: 1577
Editor: reduc01
Comment:
Revision 723 as of 2013-04-03 17:55:23
Size: 1577
Editor: 67
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
15; 9.-16.4.; A.Sievers, C.Kramer 12.-19.4.; GISMO-Pool (10./11. PC meeting);
16; 16.-23.4.; I.Hermelo, C.Kramer -19.4.; GISMO-Pool;
15; 9.-16.4.; A.Sievers, C.Kramer 12.-18.4.; GISMO-Pool (10./11. PC meeting);
16; 16.-23.4.; I.Hermelo, C.Kramer -18.4.; GISMO-Pool;

1 1.-8.1.2013 G.Bruni
2 8.-15.1.2013 A.Sievers
3 15.-22.1.2013 M.Gonzalez Pool
4 22.-29.1.2013 N.Billot Pool
5 29.1.-5.2. S.Trevino
6 5.-12.2. J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.
7 12.-19.2. N.Billot Pool, VLBI test on 14. or 18.2.
8 19.-26.2. M.Gonzalez, I.Hermelo (19., 22.-26.2.) Pool
9 26.2.-5.3. J.L.Santaren (night-time operator)
10 5.-12.3. S.Trevino, I.Hermelo
11 12.-19.3. M.Gonzalez 11.-13. HEMT installation & alignment, 15.-18. J.LeBourlot with students
12 19.-26.3. G.Paubert (19.-22.3.), I.Hermelo (22.-29.3.) Pool & 1mm VLBI
13 26.3.-2.4. F.Damour (day-time operator), I.Hermelo (22.-29.3.) Pool & 1mm VLBI (till 28.3.), Semana Santa
14 2.-9.4. S.Trevino
15 9.-16.4. A.Sievers, C.Kramer 12.-18.4. GISMO-Pool (10./11. PC meeting)
16 16.-23.4. I.Hermelo, C.Kramer -18.4. GISMO-Pool
17 23.-30.4. M.Gonzalez GISMO-Pool
18 30.4.-7.5. S.Trevino
19 7.-14.5. I.Hermelo
20 14.-21.5. M.Ruiz 3mm VLBI (16.-22.5.)
21 21.-28.5. G.Paubert
22 28.-4.6. I.Hermelo Start of Summer Semester
23 4.-11.6. S.Trevino
24 11.-18.6. N.Billot NIKA run
25 18.-25.6.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)