Size: 1565
Comment:
|
Size: 1654
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 17: | Line 17: |
11; 12.-19.3.; M.Gonzalez; 15.-18. J.LeBourlot with students; 12; 19.-26.3.; G.Paubert (19.-22.3.); I.Hermelo (22.-29.3.); Pool, Exchange of NIKA 2mm array, 1mm VLBI; |
11; 12.-19.3.; M.Gonzalez; 11.-13. HEMT installation & alignment, 15.-18. J.LeBourlot with students; 12; 19.-26.3.; G.Paubert (19.-22.3.), I.Hermelo (22.-29.3.); Pool & 1mm VLBI; |
Line 21: | Line 21: |
15; 9.-16.4.; A.Sievers, C.Kramer 12.-19.4.; GISMO-Pool (10./11. PC meeting); 16; 16.-23.4.; I.Hermelo, C.Kramer -19.4.; GISMO-Pool; |
15; 9.-16.4.; A.Sievers, C.Kramer 12.-18.4.; GISMO-Pool (10./11. PC meeting); 16; 16.-23.4.; I.Hermelo, C.Kramer -18.4.; GISMO-Pool; |
Line 25: | Line 25: |
19; 7.-14.5.; I.Hermelo;; 20; 14.-21.5.; M.Ruiz; 3mm VLBI (16.-22.5.); |
19; 7.-14.5.; I.Hermelo; the road should be open again soon; 20; 14.-21.5.; M.Ruiz; NIKA: exchange of arrays and electronics, 3mm VLBI (16.-22.5.); |