Differences between revisions 714 and 715
Revision 714 as of 2013-02-14 11:12:09
Size: 1487
Editor: lt-ck
Comment:
Revision 715 as of 2013-02-14 15:36:05
Size: 1499
Editor: lt-ck
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
13; 26.3.-2.4.; F.Damour (day-time operator), I.Hermelo; Pool & 1mm VLBI (till 28.3.), Semana Santa; 13; 26.3.-2.4.; F.Damour (day-time operator), I.Hermelo (26.-29.3.); Pool & 1mm VLBI (till 28.3.), Semana Santa;

1 1.-8.1.2013 G.Bruni
2 8.-15.1.2013 A.Sievers
3 15.-22.1.2013 M.Gonzalez Pool
4 22.-29.1.2013 N.Billot Pool
5 29.1.-5.2. S.Trevino
6 5.-12.2. J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.
7 12.-19.2. N.Billot Pool, VLBI test on 14. or 18.2.
8 19.-26.2. M.Gonzalez, I.Hermelo Pool
9 26.2.-5.3. J.L.Santaren (night-time operator)
10 5.-12.3. S.Trevino, I.Hermelo
11 12.-19.3. M.Gonzalez 15.-18. J.LeBourlot with students
12 19.-26.3. G.Paubert Pool & 1mm VLBI 21.-28.3., Exchange of NIKA 2mm array
13 26.3.-2.4. F.Damour (day-time operator), I.Hermelo (26.-29.3.) Pool & 1mm VLBI (till 28.3.), Semana Santa
14 2.-9.4. S.Trevino
15 9.-16.4. A.Sievers, C.Kramer 12.-19.4. GISMO-Pool (10./11. PC meeting)
16 16.-23.4. I.Hermelo, C.Kramer -19.4. GISMO-Pool
17 23.-30.4. M.Gonzalez GISMO-Pool
18 30.4.-7.5. S.Trevino
19 7.-14.5. I.Hermelo
20 14.-21.5. 3mm VLBI (16.-22.5.)
21 21.-28.5.
22 28.-4.6. ? Start of Summer Semester
23 4.-11.6. S.Trevino
24 11.-18.6. N.Billot NIKA run
25 18.-25.6.

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)