Differences between revisions 713 and 765 (spanning 52 versions)
Revision 713 as of 2013-02-11 09:11:08
Size: 1459
Editor: lt-ck
Comment:
Revision 765 as of 2014-01-15 14:35:36
Size: 1322
Editor: gra-wlan1
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
1; 1.-8.1.2013; G.Bruni;;
2; 8.-15.1.2013; A.Sievers;;
3; 15.-22.1.2013; M.Gonzalez; Pool;
4; 22.-29.1.2013; N.Billot; Pool;
5; 29.1.-5.2.; S.Trevino;;
6; 5.-12.2.; J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.;;
7; 12.-19.2.; N.Billot; Pool, VLBI test on 14. or 18.2.;
8; 19.-26.2.; M.Gonzalez, I.Hermelo; Pool;
9; 26.2.-5.3.; J.L.Santaren (night-time operator);;
10; 5.-12.3.; S.Trevino, I.Hermelo;;
11; 12.-19.3.; M.Gonzalez; 15.-18. J.LeBourlot with students;
12; 19.-26.3.; G.Paubert, I.Hermelo; Pool & 1mm VLBI 21.-28.3.;
13; 26.3.-2.4.; F.Damour (day-time operator); Pool & 1mm VLBI (till 28.3.), Semana Santa;
14; 2.-9.4.; S.Trevino;;
15; 9.-16.4.; A.Sievers, C.Kramer 12.-19.4.; GISMO-Pool (10./11. PC meeting);
16; 16.-23.4.; I.Hermelo, C.Kramer -19.4.; GISMO-Pool;
17; 23.-30.4.; M.Gonzalez; GISMO-Pool;
18; 30.4.-7.5.; S.Trevino;;
19; 7.-14.5.; I.Hermelo;;
20; 14.-21.5.;; 3mm VLBI (16.-22.5.);
21; 21.-28.5.;;;
22; 28.-4.6.; ?; Start of Summer Semester;
23; 4.-11.6.; S.Trevino;;
24; 11.-18.6.; N.Billot; NIKA run;
25; 18.-25.6.;;;
1; 31.12.-7.1.; J.L.Santaren & F.Damour (Operators, 31.12.-3.1.). G.Paubert (3.1.-7.1.);;
2; 7.-14.1.; M.Gonzalez; Heterodyne Pool;
3; 14.-21.1.; N.Billot; NIKA Cool down;
4; 21.-28.1.; A.Sievers; NIKA tests;
5; 28.1.-4.2.; S.Trevino;;
6; 4.-11.2.; M.Gonzalez (4-7 Feb) and I.Hermelo(7-11 Feb); Heterodyne Pool;
7; 11.18.2.; J.L.Santaren and F.Damour (operators); 13./14.: 8h VLBI;
8; 18.-25.2.; N.Billot; NIKA 1st open pool run (18.-28.2.);
9; 25.2.-4.3.; I.Hermelo; NIKA pool till 28.2.;
10; 4.-11.3.; M.Gonzalez; Heterodyne Pool;
11; 11.-18.3.; A.Sievers; Proposal deadline 13.3.;
12; 18.-25.3.; S.Trevino;;
13; 25.-1.4.; G.Paubert (-28.3.), N.Billot (28.3.-1.4.);;
14; 1.-8.4.; I.Hermelo; GISMO pool (1.-11.4.);
15; 8.-15.4.; M.Gonzalez; PC-Meeting 9./10.;
16; 15.-22.4.; ;;
17; 22.-29.4.; ;;
18; 29.4.-6.5.; ;;
19; 6.-13.5.; ;;
20; 13.-20.5.; ;;
21; 20.-27.5.; M.Ruiz (Operator);3mm VLBI (22.-28.5.);
Line 35: Line 31:
 * AodSchedule13

1 31.12.-7.1. J.L.Santaren & F.Damour (Operators, 31.12.-3.1.). G.Paubert (3.1.-7.1.)
2 7.-14.1. M.Gonzalez Heterodyne Pool
3 14.-21.1. N.Billot NIKA Cool down
4 21.-28.1. A.Sievers NIKA tests
5 28.1.-4.2. S.Trevino
6 4.-11.2. M.Gonzalez (4-7 Feb) and I.Hermelo(7-11 Feb) Heterodyne Pool
7 11.18.2. J.L.Santaren and F.Damour (operators) 13./14.: 8h VLBI
8 18.-25.2. N.Billot NIKA 1st open pool run (18.-28.2.)
9 25.2.-4.3. I.Hermelo NIKA pool till 28.2.
10 4.-11.3. M.Gonzalez Heterodyne Pool
11 11.-18.3. A.Sievers Proposal deadline 13.3.
12 18.-25.3. S.Trevino
13 25.-1.4. G.Paubert (-28.3.), N.Billot (28.3.-1.4.)
14 1.-8.4. I.Hermelo GISMO pool (1.-11.4.)
15 8.-15.4. M.Gonzalez PC-Meeting 9./10.
16 15.-22.4.
17 22.-29.4.
18 29.4.-6.5.
19 6.-13.5.
20 13.-20.5.
21 20.-27.5. M.Ruiz (Operator) 3mm VLBI (22.-28.5.)

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)