Differences between revisions 713 and 755 (spanning 42 versions)
Revision 713 as of 2013-02-11 09:11:08
Size: 1459
Editor: lt-ck
Comment:
Revision 755 as of 2013-12-16 12:42:55
Size: 608
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
1; 1.-8.1.2013; G.Bruni;;
2; 8.-15.1.2013; A.Sievers;;
3; 15.-22.1.2013; M.Gonzalez; Pool;
4; 22.-29.1.2013; N.Billot; Pool;
5; 29.1.-5.2.; S.Trevino;;
6; 5.-12.2.; J.L.Santaren/F.Damour (operators), I.Hermelo 8.-12.2.;;
7; 12.-19.2.; N.Billot; Pool, VLBI test on 14. or 18.2.;
8; 19.-26.2.; M.Gonzalez, I.Hermelo; Pool;
9; 26.2.-5.3.; J.L.Santaren (night-time operator);;
10; 5.-12.3.; S.Trevino, I.Hermelo;;
11; 12.-19.3.; M.Gonzalez; 15.-18. J.LeBourlot with students;
12; 19.-26.3.; G.Paubert, I.Hermelo; Pool & 1mm VLBI 21.-28.3.;
13; 26.3.-2.4.; F.Damour (day-time operator); Pool & 1mm VLBI (till 28.3.), Semana Santa;
14; 2.-9.4.; S.Trevino;;
15; 9.-16.4.; A.Sievers, C.Kramer 12.-19.4.; GISMO-Pool (10./11. PC meeting);
16; 16.-23.4.; I.Hermelo, C.Kramer -19.4.; GISMO-Pool;
17; 23.-30.4.; M.Gonzalez; GISMO-Pool;
18; 30.4.-7.5.; S.Trevino;;
19; 7.-14.5.; I.Hermelo;;
20; 14.-21.5.;; 3mm VLBI (16.-22.5.);
21; 21.-28.5.;;;
22; 28.-4.6.; ?; Start of Summer Semester;
23; 4.-11.6.; S.Trevino;;
24; 11.-18.6.; N.Billot; NIKA run;
25; 18.-25.6.;;;
1; 31.12.-7.1.; J.L.Santaren & F.Damour (Operators, 31.12.-3.1.). G.Paubert (3.1.-7.1.);;
2; 7.-14.1.; M.Gonzalez; Heterodyne Pool;
3; 14.-21.1.; N.Billot; NIKA Cool down;
4; 21.-28.1.; A.Sievers; NIKA tests;
Line 35: Line 14:
 * AodSchedule13

1 31.12.-7.1. J.L.Santaren & F.Damour (Operators, 31.12.-3.1.). G.Paubert (3.1.-7.1.)
2 7.-14.1. M.Gonzalez Heterodyne Pool
3 14.-21.1. N.Billot NIKA Cool down
4 21.-28.1. A.Sievers NIKA tests

Old AoD Plans:

AstronomerOnDutyScheduleOld (last edited 2017-01-12 10:27:15 by PabloMellado)