Size: 1432
Comment:
|
Size: 1523
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 18: | Line 18: |
12; 19.-26.3.; G.Paubert, I.Hermelo; Pool & 1mm VLBI 21.-28.3.; 13; 26.3.-2.4.; F.Damour (day-time operator); Pool & 1mm VLBI (till 28.3.), Semana Santa; |
12; 19.-26.3.; G.Paubert (19.-22.3.); I.Hermelo (22.-29.3.); Pool, Exchange of NIKA 2mm array, 1mm VLBI; 13; 26.3.-2.4.; F.Damour (day-time operator), I.Hermelo (22.-29.3.); Pool & 1mm VLBI (till 28.3.), Semana Santa; |
Line 21: | Line 21: |
15; 9.-16.4.; A.Sievers; GISMO-Pool (10./11. PC meeting); 16; 16.-23.4.; C.Kramer, I.Hermelo; GISMO-Pool; |
15; 9.-16.4.; A.Sievers, C.Kramer 12.-19.4.; GISMO-Pool (10./11. PC meeting); 16; 16.-23.4.; I.Hermelo, C.Kramer -19.4.; GISMO-Pool; |